Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Investigation of Subsidence Over AML: A Case Study

    By P. M. Lin

    The problem of abandoned mine land (AML) subsidence is getting more severe because abandoned mine lands which used to be located in the remote areas have been gradually developed into suburbs or even

    Jan 1, 1987

  • SME-ICGCM
    Massive Pillar Failure--Two Case Studies

    By David H. Tang

    Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes

    Jan 1, 1984

  • SME-ICGCM
    Safe Pillar Extraction Practice - Some Geotechnical Principles Based on Australian Experience

    By Bruce K. Hebblewhite

    Underground pillar extraction continues to be practiced in Australia in various forms, in spite of the dominance of the longwall method, which accounts for over 90% of underground production. Australi

    Jan 1, 2011

  • SME-ICGCM
    Study of Ground Movement Over a Longwall Mine

    By A. W. Khair

    This paper presents an analysis of ground movements recorded from longwall operations in the Northern Appalachian region in West Virginia. The site chosen for the investigation was selected due to var

    Jan 1, 1987

  • SME-ICGCM
    Surface Structures Impacted By Subsidence From Pennsylvania Coal Mines, 2003 to 2008

    By Anthony T. Iannacchione

    Underground bituminous coal mining is a large and significant industry within the Commonwealth of Pennsylvania, and it has a legacy of environmental consequence. For example, in 2008, 13.5 acres (5.5

    Jan 1, 2011

  • SME-ICGCM
    Development of A Yielding Steel Post

    By John P. Dunford

    Ground support continues to be the most important safety consideration in underground mining. The Bureau of Mines has developed a yielding steel post with a capacity of 45 tons and b c1osure allowance

    Jan 1, 1986

  • SME-ICGCM
    Analysis Of Cable Bolt Performance Using Numerical Modeling

    By M. Bouteldja

    A finite element modelling approach is developed for the evaluation of the mechanical performance of cable bolts supports in underground mine structures. The modelling approach permits the simulation

    Jan 1, 1999

  • SME-ICGCM
    Effect of the Approaching Longwall Faces on Barrier and Entry Stability

    By Klaus-Dieter Beck

    RAG American Coal Holding, Inc. affiliates operate two longwall mines in the Pittsburg seam in Pennsylvania, the Cumberland mine and the Emerald mine. A unique situation in longwall operation occurred

    Jan 1, 2004

  • SME-ICGCM
    Stone Mine Design in Highly Fractured Rock (af82e9d2-530a-42f2-9d22-f8c466af0da2)

    By Vincent Scovazzo

    Cost-effective underground mine configurations have been designed in highly fractured rock masses where the stone possesses a high material strength. A limestone mine in the eastern United States is u

    Jan 1, 2002

  • SME-ICGCM
    Pumpable Roof Supports: Developing Design Criteria by Measurement of the Ground Reaction Curve (8ba91e71-c09d-4bd5-afc0-848b526c152b)

    By Thomas Barczak

    Pumpable roof supports provide an alternative longwall tailgate roof support and have grown in usage during the past few years. Heintzmann Corporation has been installing pumpable roof supports at the

    Jan 1, 2003

  • SME-ICGCM
    Geotechnical Mine Design Of The Foidel Creek Mine

    By H. N. Maleki

    The results of five years of geotechnical investigations are presented to develop productive and stable longwall layouts for the Foidel Creek Mine. The program was initiated during the pre-mining stag

    Jan 1, 1988

  • SME-ICGCM
    Truss Bolting On-Cycle in Jane Mine Lower Freeport Seam

    By Ken Barish

    Jane Mine of the Keystone Coal Mining Corporation was started in 1962 and is in the Lower Freeport seas located in Armstrong County, Pennsylvania, approximately 45 miles northeast of Pittsburgh. The

    Jan 1, 1984

  • SME-ICGCM
    Investigation Into Cutting Characteristics Of Indian Coal Seams (bf5c67f9-81c7-4039-8f47-cd39420e2b8e)

    By T. N. Singh

    With a view to producing increased target output every year, Indian coal mining industry is fast moving towards mechanisation but the present approach of mechanisation suffers from lack of standardisa

    Jan 1, 1992

  • SME-ICGCM
    First Caving And Its Effects--A Case Study

    By S. M. Hsiung

    In late September 1984, a longwall panel in West Virginia lost 60 powered supports when the face had advanced for 250 ft. from the setup entry. An in-mine investigation showed that it was a first weig

    Jan 1, 1984

  • SME-ICGCM
    Risk Assessment Of Geotechnical Factors Associated With Underground Thick Seam Mining Methods

    By Bruce K. Hebblewhit

    Australia is well endowed with extensive reserves of thick underground coal scams, particularly in the range of 4.5m to 9m thicknesses. (For the purposes of this paper, thick scams are defined as bein

    Jan 1, 2001

  • SME-ICGCM
    Innovative Rock Reinforcement Hardware (a5497235-47bd-4c2e-8654-b4e79927169e)

    By D. F. Howarth

    Two innovative ground reinforcement products have been developed for use in the mining industry. One of these products is a high strength polyethylene (HOPE) bar for use as a rib bolt in underground c

    Jan 1, 1992

  • SME-ICGCM
    Evaluation Of The Strength Behaviour Of Monolithic Packs (af92f0dd-9b80-4922-891e-7d098de9b5e7)

    By S. I. Al-Ameen

    Monolithic packing systems have gained in popularity as a gate side packing method, However, there has been no detailed investigation to assess their underground strength behaviour. This work includes

    Jan 1, 1992

  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    Pressure Distribution Of 2-Leg Shield Supports (fb20894a-e0d3-49e8-b331-69176f4a54a3)

    By Rao Pothini

    Measurement of pressure distribution under the base plate of the Hemscheidt 2-leg 800-ton shield was performed underground for two shifts using 12 pressure cells installed in two rows, one each under

    Jan 1, 1992

  • SME-ICGCM
    Case Studies Of Progressive Pillar Failure In Two Mines Using Wide Pillars

    By Hamid Maleki

    Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv

    Jan 1, 2000