Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Raise and Shaft Drilling, A Continuing DevelopmentBy Richard J. Robbins
Raise and shaft drilling, a continuing development RICHARD J. ROBBINS* (Visitor) Although the past decade has witnessed many improvements in large-diameter drilling machinery for the boring of raises,
-
Keynote address: hydrometallurgical process development for complex ores and concentrates - SynopsisHydrometallurgical processing of complex ores and concentrates is becoming increasingly important as the mining and metallurgical industry seeks to exploit mineral deposits that are difficult to treat
Jan 1, 2009
-
Cave Management As An Ore Reserve Management Tool Ensuring Optimal Life Of Mine For Palabora Mining CompanyPalabora Mining Company is operating a copper block cave mine in the Limpopo Province of South Africa. The mine was developed in the late nineties with a target ore reserve of 220 million tonnes of c
Jan 1, 2007
-
Practical Method for Measuring Anisotropy of Rock Using a Hollow CylinderBy K. Shin
Determining the anisotropy of rocks has in the past been difficult and rarely attempted in engineering practice. Here we have developed a new practical methodology for measuring orthotropic anisotro
Jan 1, 2003
-
Annual Report and AccountsCOUNCIL The following served on Council during the year under review: Office bearers: Messrs V. C. Robinson (President), Prof D. D. Howat and Dr J. P. Hugo (Vice-Presidents), J. K. E. Douglas (Immed
-
The Alusaf aluminium smelter at Richards BayBy H. T. Kaiser, P. De Waal
The Alusaf aluminium smelter at Richards Bay by H. T. KAISER, B.Sc. (Pta), M.B.L. (Unisa) (Visitor) and P. DE WAAL, B.Sc., B.lng. (Mech.) (Stell.) (Visitor) A description is given of the aluminium sme
Jan 7, 1977
-
Rectangular Furnace Design And Revolutionary DC-Slag Cleaning Technology For The PGM IndustryBy J. Kempken, T. Schreiter, R. Degel, H. Schmieden
After a short summary of the historical milestones of the submerged arc furnace, the paper will highlight different applications and their specific smelting furnace requirements in the non-ferrous are
Jan 1, 2006
-
Annual Report and Accounts for the year ended 30th June, 1983Council and Standing Committees - 1982/83 President: Prof. A. N. Brown Vice Presidents: Prof. R. P. King and J. D. Austin Honorary Treasurer: Prof. D. G. Krige Immediate Past President: G. Y. Nisbet
Jan 1, 1983
-
A Technical And Operational Audit Of The First 10 Years Of The Teniente Converter Operations At Nkana Smelter.By Milton Syamujulu
In 1994, Nkana smelter commissioned a Multimillion US$ Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce th
Jan 1, 2005
-
Metso Outotec VSF®X Solvent Extraction for Sicomines Phase II ProjectBy H. Laitala, M. Lampi
Metso Outotec has developed a wide range of solvent-extraction technologies over decades and has introduced Metso Outotec VSF®X solvent-extraction plant. Standardized and modularized, Metso Outotec VS
Jan 1, 2023
-
Oxygen Activity Measurements In Simulated Converter MatteBy K. G. Tshilombo
It should be possible to use an oxygen probe to follow iron removal during converting, if local equilibrium is established between iron in the matte and the iron oxides in the fayalitic slag. The oxyg
Jan 1, 2006
-
The use of Monte Carlo simulation for operations management decision criteriaGold Fields is the world?s fourth largest gold producer with operations in South Africa, Australia, Ghana and South America. All of Gold Fields? South African Operations are located in the Witwatersra
Jan 1, 2009
-
Optimization of Circuits for Pressure Leaching of Sulphide Ores and Concentrates"Pressure leaching is an option for copper recovery from chalcopyrite. Leaching takes place at high temperatures and pressures in the presence of an oxidizing agent. This work shows how the performanc
Jan 1, 2016
-
Effect of magnesium precipitate in thickening flocculation processes: a molecular dynamics study, G.R. Quezada, R.I. Jeldres, and P.G. ToledoBy P. G. Toledo, R. I. Jeldres, G. R. Quezada
Chile is the main producer of copper in the world and lately the mining industry has suffered challenges due to the lack of water in the north of the country, along with the new policies of not using
Jan 1, 2020
-
Modelling the Kinetics of Copper Sulfide Precipitation in Bioleach Liquor by Utilizing Biosulfide Produced from a Biological Sulfate Reduction ProcessBy R. Weideman, K. du Preez
Biological sulfate reduction has become a successful treatment alternative for acid mine drainage and Mintek is developing biological processes for treatment of highsulfate mine waters. Treatment of t
Jan 1, 2023
-
President?s Page ? The changing scenePapers and Contributions Since the Institute's inception, it had been our practice until some years ago to meet regularly for discussion of new developments, using as a basis a paper read by one
Jan 1, 1991
-
Who is a Competent Person?By T. R. Marshall
SAMREC (The South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves) Clause 7 notes that ‘Documentation detailing Exploration Results, Mineral Resources and
Sep 1, 2021
-
Mine To Metal: A Practical Balance For A Large Platinum ProducerBy H. E. Bartlett
This paper deals with the sampling and mass measurement for ore delivered from a shaft to a processing plant and the contribution of the data from these measurements to the metal balances from shaft d
Jan 1, 2014
-
Annual Report and Accounts for the year ended 30th June 1987PREFACE During the past year, considerable effort was devoted to the implementation of the strategic plan that was adopted by the SAIMM in 1986. Good progress was made in a number of areas, while in
Jan 1, 1987
-
Behaviour analysis of a slope in the river Sela right backBy J. E. Quintanilha de Menezes, L. Ribeiro e Sousa, I. Ferreira
The Paradela dam has a spillway that makes it possible to discharge a maximum flow of 400 m3/s, the water discharges being on the river Sela, about 2km upstream the river Cávado. After the first use o
Jan 1, 2003