Charge Geometry Effects on Pressure Waveforms in a Shock Tube
By Joshua Hoffman, Braden Lusk, Kyle Perry
Shock tubes are used to simulate large-scale arena explosions without the use of full-scale arena sites that utilize large quantities of explosives. Instead, small explosive charges can be used to dri
Jan 1, 2010
-
Modeling Reactive Sulfide Rock at the Red Dog Mine
By Norman Paley, Zachary Pickett
The Red Dog Mine is a high-grade zinc-lead mine located in northwest Alaska which began operations in November 1989. In June 2014 the upper half of a charge in a trim shot in the Aqqaluk pit deflagrat
Feb 1, 2020
-
The DIVEX Corporation, A Case Study in Explosives and Environmental Remediation
By Reynold N. Hoover, Davis S. Shatzer
The Bureau of Alcohol, Tobacco and Firearms (ATF) is responsible for the regulation and enforcement of the explosives laws codified in the Organized Crime Control Act of 1970, Title XI. To meet its re
Jan 1, 1995
-
Connecticut's "Call Before You Dig" System: New Laws and Regulations
By Stephen G. Rieben
Almost everyone has at least heard of the two one-call systems which serve New England. They are "Call Before You Dig", which covers Connecticut, and "Dig Safe", which covers the remaining five New En
Jan 1, 1990
-
Advance Blasting using Drone Mapping and AI for Comprehensive Blast Performance Analysis
By Dr. Anurag Agrawal, Fathur Rozaq, Nella Lubis, Relinda Sanistya, Herry Saputra, Rudolf Sitorus
In mining operations, basic drone applications such as pre- and post-blast photo comparisons, blast video recordings, and sample-based fragmentation analysis are often used to assess blast performance
Jan 21, 2025
-
Valdez, Alaska Glacier Point Quarry – One Shot / One Chance for Success
By Billy Rosseau, Mike Cammack, Richard O’Meara, Gustavo Azpilcueta
During the summer of 2014, the U.S. Army Corps of Engineers (USACE) sought proposals to vastly improve and expand the small boat harbor in Valdez, Alaska. It would be a multi-year project, and constru
Jan 1, 2017
-
Close-in Pipeline Trench Blasting – Why PipeBlast Does Not Work
By N. Skopak, C. Aimone-Martin, J. Redyke, B. O. Meins
PipeBlast is a spreadsheet-based calculator based on research conducted by Southwest Research Institute (SwRI), used by the pipeline industry to determine if proposed blasting planned near existing pi
Jan 1, 2024
-
Review and Learnings from a Surface Quarry Rockfall Incident
By Andrew Moore
It has long been common practice to conduct drilling and blasting operations at surface quarries in the Midwest in close proximity to near-vertical highwalls. The main reasons for such an approach, an
Feb 6, 2023
-
Crack Displacement and Vibration Measurement of an Underground Portal
By Douglas Rudenko PG, Jay Elkin, Siavash Mahvelati Ph. D.
Very little studies have investigated the behavior of cracks in unlined tunnels over long periods of time, especially when such flaws are subjected to blast-induced vibrations. Using a pool of 30+ bla
Feb 1, 2020
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground
By K. Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Jan 1, 2024
-
2000 Blasting in the New Millennium - The Blasting Log An Essential Witness of Professional Blasting Part 1
By Steve Dillingham
The origin of the written blasting log or shot report can likely be traced back to the earliest annals of blasting and record keeping. These records were, for the most part, a way of checking inventor
Jan 1, 2002
-
Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building
By M V. Van Bers, A L. McAnuff, A Curic
During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca
Jan 1, 1999
-
Recent Projects - Emergency Bridge Blasting
By Brent Blanchard
As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur
Jan 1, 2003
-
Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle Mine
By D. Scott Scovira, Remi Proulx
The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco
Jan 1, 2000
-
Drilling Cost Optimization by Using a Water-Powered Drilling Technique at an Underground Sublevel Stoping Operation
By Alexandra Yuyali
The objective of this research work is to increase the drilling ratio represented in tons per drilled meter (ton/m) to reduce mining costs. One of the key characteristics of this research is the use o
Jan 21, 2025
-
Penetration Analysis of a Shaped Charge Jet into a Concrete Target
By Joseph Indeck, Seokbin Lim, Andrew Thompson
In the design of explosively driven penetration devices, understanding the impact conditions between the explosively propelled penetrator and the target is one of the most important steps in optimizin
Jan 1, 2011
-
Analytical Measurements in Cast Blasting to Identify the Cause and Cure for "Orange Smoke" Formation
By Charles R. Barnhart
The Nitrogen Dioxide Cloud: After one year of testing it can be stated that we do know and understand a great deal about why the nitrogen dioxide formation is exacerbated in cast blasting. Picture 1 i
Jan 1, 2004
-
Comparison of the Non-Ideal Shock Energies of Sensitised and Unsensitised Bulk ANFO-Emulsion Blends in Intermediate Blasthole Diameters
By E. Vilaescusa, J. Eloranta
The work presented in this paper investigates the influence of non-ideal detonation characteristics related to the blasthole diameter, base emulsion sensitivity (micro-balloon sensitised versus unsens
Jan 1, 2012
-
Blasting Improvements by Using Most Active Rock Variations on Blast
By Alain Blanchier, Anne Charline Sauvage
Rock mass variations have a huge influence on explosives efficiency and on blasting results. Numerous blasting improvements could be gained by taking into account rock mass and its variations. However
Jan 1, 2004
-
Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant
By Thierry Bernard, Philippe Dozohne
May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate
Jan 1, 2001