Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Small Scale Model Testing in Investigations of Energetic Material -- Dynamic Effects Laboratory
By L C. Taylor
Very small scale testing has been shown to be able to predict quite accurately, in many situations, the results of full scale testing. Small scale tests are more cost efficient, easily observed, and e
Jan 1, 2012
-
MINIMIZING RISK IN URBAN QUARRIES (Two Case Studies)
By James Goldberg, Sally Zadra, Wiliam Reisz
Early recognition and risk assessment is critical to sustaining a safe and productive blasting operation. While every blasting environment holds inherent risk, highwall blasting in highly congested ar
Jan 1, 2008
-
Geomechanical differentiation of cratering mechanisms with two degrees of freedom and burden dependency investigated through single hole blast tests.
By J. D. Aubertin
Rock blasting is a complex engineering process that requires in-depth knowledge of operations and geomechanical conditions. Acknowledged design precepts are based on cratering behavior associated with
Jan 1, 2024
-
Fixortm -A New Approach to Neutralizing Landmines and Uxo
By Bill Bauet, John Anderson
There are always security concerns when explosives are transported and stored, and these concerns are intensified in peacekeeping operations where explosives could fall into the wrong hands. MREL Spec
Jan 1, 2001
-
Open Pit Development
By William C. Burkle
In this paper, the author has cited essential areas in which the explosives engineer can assist the mine manager in his planning of an entirely new operation or in a major expansion of an existing fac
Jan 1, 1990
-
Development of a new contour blasting system using bulk emulsions
By Peter Moser, Mark Ganster, Radoslava Ivanova, Florian Bauer
Blasting accurately in underground drifts and creating a smooth contour requires proper drilling, knowledge about the apparent geology, a well designed blast pattern and ideally a smooth blasting prod
Jan 1, 2012
-
Observations from the Laboratory Testing of Resistorized Electric Detonators
By David Leidel, James Stuart
The 50 ohm resistorized electric detonator is commonly used in the oilfield for initiation of wireline conveyed perforating guns and other downhole explosive tools. This type of electric detonator pro
Jan 1, 2010
-
Blind Hole Raise Blasting at the Homestake Mine
By Justus Deen, Paul V. Sterk
Through the 119 year history of the Homestake Mine various methods of raise mining have been used, these include conventional, bored, and drop raises. These raises provide passage for men and supplies
Jan 1, 1996
-
Determination of Ore Fragmentation by Image Analysis in Sercheshmeh Mine
By Zahra Hosseini, S. Hassan Khoshroo, Mohsen Amirrahmat
The Sarcheshmeh Copper mine will be developing its open-pit in order to reach to the remaining ore in the deposit. One of the problems regarding the development plan is the ore handling system from th
Jan 1, 2004
-
Quantification of the Levels of Risk of Flyrock
By Alain Blanchier
Because in Europe and in many other countries as well every new project (quarry, mine, public work) needs a risk estimation to prove its feasibility, a model to estimate flyrock risks became necessary
Jan 1, 2013
-
Blind Hole Raise Blasting at the Homestake Mine
By Justus Deen, Paul V. Sterk
Through the 119 year history of the Homestake Mine various methods of raise mining have been used, these include conventional, bored, and drop raises. These raises provide passage for men and supplies
Jan 1, 1996
-
The Waiting Time Recovery Test
By John T. Aler
The U.S. Bureau of Mines has been studying the problem of why explosives detonate weakly or misfire during blasting in underground coal mines. Cross-borehole shock wave interaction has been identified
Jan 1, 1991
-
Blasting for Wall Control and Stability using Electronic Detonators at the Bald Mountain Mine, Nevada
By Kurt Oakes, John Williams
Placer Dome, US operates the Bald Mountain Mine. The Bald Mountain Mine is a surface operation located in remote northwestern White Pine County in east-central Nevada, approximately midway between Elk
Jan 1, 2004
-
The Use of Nonel Reefmaster Assemblies
By Kfw Eick
The paper describes the use of the Nonel millisecond delay blasting system in narrow, deep, tabular ore bodies and briefly describes the standard stoping method as used on Harmony Gold Mine and compar
Jan 1, 1990
-
Study of the Detonation Process of Novel Hydrogen Peroxide-based Explosives Using High Speed Video
By Italo Onederra, Miguel Araos
"In order to characterize non-ideal explosives, the explosives industry rely on unconfined velocity ofdetonation tests and where possible underwater pond tests. The information obtained from such test
Jan 1, 2017
-
Some Issues in the Image Analysis Application for Bench Face Characteristics and Blast Fragmentation Measurement
By Türker Hüdaverdi, Özge Akyildiz
"Efficiency of blast operations depends on fragmentation, overbreak, muckpile profile anddisplacement, vibration, airblast, flyrock and damage to wall or slope stability. To provide all these conditio
Jan 1, 2017
-
Cycled Prill - A New Generation of High Performance High Density of ANFO Explosives
By C James Dahn
A new generation of high performance and high density ammonium nitrate prills have been developed. These cycled "prills" offer significant improvement in ANFO mixing time, detonation velocity performa
Jan 1, 1980
-
Study of Blast Over-pressure from Intentional MEC Detonations Using Double Sandbag Mitigation
By Daniel Haines, Benjamin Konshak, Michelle Crull
American Technologies Incorporated Group (ATI) is the prime contractor with U.S. Army Corps of Engineers, Huntsville Center (CEHNC) in the Honolulu District for the removal of munitions and explosives
Jan 1, 2008
-
A History of Explosives Use by the Forest Service Rocky Mountain Region
By Raymond V. Adolphson
Use of explosives effectively and safely has come a long way since its discovery and early stages of development. The need to objectively and functionally train personnel in the safe and effective use
Jan 1, 1978
-
Pinkerton Tunnel Open Cut Project
By Dale L. Ramsey
The Pinkerton Tunnel Open Cut Project is part of the National Gateway Clearance Initiative improvement project to achieve a minimum of 6.4 meters (21 feet) of vertical clearance along CSX Transportati
Jan 1, 2014