Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train Loading

    By Pratik Goel, Sumanta Haldar

    High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera

    Sep 1, 2022

  • DFI
    Efficient Torque-Installed Pile Use in Southern California

    By Jason Buenker, Molly Winston

    Torque-installed piles are gaining popularity in Southern California as the go-to deep foundation element for small- to medium-capacity loads in urban environments. The torque-installed pile is a disp

    Jan 1, 2019

  • DFI
    High Capacity Hollow Core Bar Piles

    By Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel

    "A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry

    Jan 1, 2017

  • DFI
    Cooling Water Intake Shafts for the Oak Creek Expansion

    By Edward Jacobsen, Patrick J. Lydon

    "The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake

    Jan 1, 2008

  • DFI
    Application of Triple-Axial CDM Method (Lemni 2/3 Method) for Stabilizing Soft Soil

    By Kazuyoshi Kamimura, Masaya Kawata

    "It has been 30 years since the cement deep mixing (CDM) method developed in Japan. CDM method has been applied to many structures. While various technical improvements have been implemented in the me

    Jan 1, 2015

  • DFI
    Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl Tests

    By Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD

    The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval

    Oct 1, 2022

  • DFI
    Elimination of Environmental Footprint: LVCC Expansion - Foundation Installation

    By Zachary Q. Maassen

    Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio

    Jan 1, 2019

  • DFI
    Baum Station – A New Pile Driving and Drilling Navigation System

    By Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura

    "A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep

    Jan 1, 2017

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles

    By Garland Likins

    High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o

    Jan 1, 2000

  • DFI
    Slurry Wall Design for Construction Using Soil Structure Interaction

    By Nino Catalano, Meeok Kim, Gordon Chen

    "The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr

    Jan 1, 2017

  • DFI
    North American Geotechnical Exploration Practice ? Synopsis

    By C. O. Riggs

    Geotechnical exploration in North America, in particular, exploration for deep foundations analyses, is currently and generally performed following the most basic sampling and insitu testing methods a

    Jan 1, 2010

  • DFI
    Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale Effects

    By Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami

    "Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha

    Jan 1, 2015

  • DFI
    "Static Load Testing" How Important Is It? ? Introduction

    By Jack Hayes

    The design and construction of deep foundations involve many uncertainties. For the designer there are uncertainties regarding soil and ground water variability, regarding sampling and lab testing, re

    Jan 1, 2000

  • DFI
    Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area

    By Henry H. Tayler, Eric Sturel

    1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat

    May 1, 2022

  • DFI
    Controlling Thermal Stresses in Barrier Walls

    By Karsten Beckhaus

    Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee

    Sep 8, 2021

  • DFI
    Site Development and Foundation Planning for a Wastewater Treatment Plant Expansion

    By Steven R. Ahlfield, Ali Ghandeharioon

    A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during

    Jan 1, 2019

  • DFI
    The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the Netherlands

    By Paul M. C. B. M. Cools, Martin Th. van Staveren

    In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i

    Jan 1, 2017

  • DFI
    “Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall Construction

    By Thomas Domanski

    Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent

    Sep 1, 2022

  • DFI
    Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical Methods

    By Suresh Chikati, Gangadharan Santhanam

    Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap

    Sep 1, 2022

  • DFI
    Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction

    By Stephen Buttling, Zhong Rui

    "A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a

    Jan 1, 1900