Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques
By Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary
By William D. Spielvogel
The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t
Jan 1, 1994
-
In Luxembourg-Walferdange 2 Problems Concerning The Geodynamic Motions Of The Planet Earth Are Studied Since 1963 - A) The Earth Tides
By experience we know about the natural event of ocean-tides. In geophysics we say that the earth-tides phenomenon is the elastico-viscous response of the earth's body to the attraction potential
Jan 1, 1987
-
Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), Georgia
By James J. Neate
The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install
Jan 1, 1988
-
Special Foundation Construction For Large Deep Excavation Pits In Berlin - Summary:
By Wolfgang G. Brunner
The center of Berlin is currently a huge jobsite, where international architects, designers, consultants, construction and ground engineers as well as investors take on the challenge of the biggest an
Jan 1, 1999
-
Design Parameter For Jacked Pile
By Sugie Prawono
Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr
Jan 1, 1999
-
When Real Estate Values Beckon - The Means And Methods Employed In The Underpinning Of 1501 Broadway
By Edward J. McNamara
People in the real estate industry are fond of saying that the three most important features of a piece of property are, in order, location, location, and location. This is perhaps the reason that the
Jan 1, 2000
-
Evaluation Of Design Methods For Tieback Retaining Walls In Seattle - Introduction
By John P. Turner
The behavior of tieback retaining walls depends on many factors, including soil properties, groundwater conditions, construction sequence, spacing and stiffness of tiebacks and soldier piles, tieback
Jan 1, 1990
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction
By Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
Complex Piling Works At London Blackfriars Station
By Jamie D. McEwan
To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui
Jan 1, 2011
-
Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods
By Derrick D. Dasenbrock
Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,
Jan 1, 2006
-
Presentation #6 - Rapid Load Testing: A New Choice For Pile Testing
By Michael D. Justason
...a global perspective... In March of 2000, the Japanese Geotechnical Society added "Rapid Load Testing" to their national standard for pile testing. In the year 2000. it is estimated that th
Jan 1, 2001
-
Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :
By Virendra Singh
The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic
Jan 1, 1996
-
Centrifuge Test on Reduction of Lateral Flow of Liquefied Ground by Stabilized Columns
By Shinji Sassa, Naoki Takahashi, Eiji Kohama, Wakaki Tsuda, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa
"Abstract Deep mixing method has been employed increasingly in recent years as a countermeasure against subsoil liquefaction. Column-type solidification, however, has been thought to have little effec
Jan 1, 2014
-
Settlement Behaviour Of Pile Foundation ? Synopsis
By W. Y. Xu
In comparison with shallow foundation, usually higher bearing capacity, smaller average settlement and better stability are the engineering characteristics of pile foundation. Besides, a smaller diffe
Jan 1, 2010
-
Helical Piles With Grouted Shafts - A Practical Overview
By Gary L. Seider
Helical screw piles are used in various applications including the underpinning of distressed foundations and as deep foundations for new structures. At present, maximum design loads range between 12.
Jan 1, 2003
-
Displacement Dependent Stiffness And Damping Constants Of Pile Groups
By Shamsher Prakash
Equivalent spring constants for analysis of footings is a function of Young's modulus of pile material (Ep), shear modulus of soil (Gs), and geometry of the footing and/or piles. Shear modulus is
Jan 1, 2002
-
The Channel Tunnel Project - Historical Background
By C. J. Kirkland
For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water that separates us from mainland Europe. It has given us a sense of security agains
Jan 1, 1991
-
Dynamic Analysis Correlation Of Standard Penetration Resistances With The Adhesion Of Very Stiff To Hard Clays On Driven Piles
By Chris D. Thompson
In Southern Ontario, Canada, piles are frequently driven through competent clayey soils to obtain end bearing on extremely dense till or bedrock. One reason for this is the difficulty at assessing the
Jan 1, 2002
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New Method
By George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014