Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Pile-Supported Raft Foundation System

    By Emre Biringen

    Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve

  • DFI
    Experiences And New Developments In Offshore Foundation

    By Franz-Werner Gerressen

    As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n

  • DFI
    Instrumented Pile Load Tests In The Area Of Pearl Harbor, Hawaii

    By John Y. L Chen

    This paper presents full-scale instrumented pile static compressive and tensile load tests to be conducted in the area of Pearl Harbor, Hawaii. Thousands of piles have been installed to support the ex

    Jan 1, 2002

  • DFI
    Deep Marine Foundations - An Introduction

    By Ben C. Gerwick

    This publication is intended to document recent innovations and technologies that have the best potential for effectively improving the quality of marine foundations while reducing the cost, time and

    Jan 1, 2013

  • DFI
    Session 25 "Grout Mixtures and Materials I"

    By Stephan Jefferis

    It is my understanding that the Scandinavians have done some fundamental work on durability. I have seen a study published whereby the author, Helen Anderson, comments on the durability of polyurethan

    Feb 10, 2003

  • DFI
    Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental Considerations

    By Takashi Enomoto

    "The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja

    Jan 1, 2015

  • DFI
    Keynote Lecture 3: G. Stuart Littlejohn Compensation and Permeation Grouting

    By G. Stuart Littlejohn

    In spite of recent concerns in certain European countries, I believe that silicate-ester grouts will continue to be employed in practice, unless more cost-effective inorganic grouts are developed for

    Feb 10, 2003

  • DFI
    Session 12 "Deep Mixing Method II"

    By Helen Ahnberg

    The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora

    Feb 10, 2003

  • DFI
    Session 19 "Compensation Grouting"

    By Douglas Heenan

    The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time

    Feb 10, 2003

  • DFI
    Corrosion Protection Of Micropiles

    By Racquel Nottingham, Marc Mastrantuono

    Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide

    Oct 1, 2022

  • DFI
    Session 22 "Compaction Grouting and Limited Mobility Grouting"

    By Allen Cadden

    The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n

    Feb 10, 2003

  • DFI
    Design & Installation of Offshore Driven Piles – A Gulf of Thailand Regional Perspective

    By Kaushik Mukherjee

    "Malaysian offshore and surrounding region are favorable to the installation of driven piles. During the design phase, pile driveability analysis plays a major role in pile make-up design to suit and

    Jan 1, 2015

  • DFI
    Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected Applications

    By Michael E. Ameel

    The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co

    Jan 1, 2010

  • DFI
    Jacked Tunnel Construction

    "Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in

    Jan 1, 2003

  • DFI
    Deepest Ever Large Diameter Pipe Pile Installation Demonstration Project New East Span San Francisco-Oakland Bay Bridge

    By Saba Mohan

    For the three full-scale pile installations, two different high-energy hydraulic hammers were selected for the installation. However, these hammers may not have sufficient energy to drive these large

    Jan 1, 2002

  • DFI
    Vibrations Caused by Pile Driving

    By K. Rainer Massarsch

    "Part 2 of 2 (Continued from Summer 2004 edition) By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenVibrations, which are caused by the installation of piles in dry or permeable soils, can

    Jan 1, 2004

  • DFI
    Risk Management and Ground Improvement Technologies in the Case of Liquefaction

    By Sebastian Fischer, Rolf Katzenbach, Steffen Leppla

    "The risk management in the case of liquefaction is one of the most serious and also difficult issues in geotechnical engineering because failure caused by liquefaction is always a sudden failure with

    Jan 1, 2015

  • DFI
    Up-Down Construction Utilizing Steel Sheet Piles And Drilled Shaft Foundations

    By Nathan A. Ingraffea

    The use of steel sheet pile walls and drilled shaft foundation elements to enable up-down construction methods has been used successfully on recent high-rise structures with multi-story below grade pa

    Jan 1, 2008

  • DFI
    Selection And Design Of Continuous Flight Auger And Drilled Displacement Piles

    By Dan Brown

    This paper provides an overview of the advantages and limitations of continuous flight auger (CFA) and drilled displacement (DD) systems compared to other deep foundation systems, along with a summary

    Jan 1, 2005

  • DFI
    DFI Model Piledriving Contractor Proposal

    With respect to liability damages, claims and costs thereof relating to or ansmg out of contamination, special or non-special wastes, hazardous wastes or pollution in connection with the performance o