Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Online FTIR analysis for improved efficiency in alumina production

    By K Haroon, J D. Speed, S P. Wood

    Online analysis of continuous and batch processes has seen a dramatic increase in recent years, with examples ranging from petrochemicals to pharmaceuticals, to industrial biotechnology and food and d

    Aug 24, 2022

  • AUSIMM
    Reconciliation – Outcomes and Expectations

    By W J. Shaw

    Mining operations must become more predictable to overcome the volatility that has characterised the mining industry. Comparisons of production against predictions will become more consistent as minin

    Aug 18, 2014

  • AUSIMM
    Preparation of Mine Fill and Disposal of Residue at Zinc Corporation New Broken Hill Consolidated, Broken Hill

    By Johns AS

    Comissioning of a new residue disposal tcluding upgraded classification for none backfill preparation, new variable speed pumps and a new residue dam took place in 1¦76. The system is described.

    Jan 1, 1978

  • AUSIMM
    Resource Estimation for the Aurukun Bauxite Deposit

    By C Grobler, M Recklies, G Jiang, I Taylor, M Morgan, G MacDonald, L Smith

    The resource estimation of lateritic deposits, such as Aurukun, presents specific issues related to the lateral changes in thickness and elevation of the various horizontal layers (or zones) within th

    Jan 1, 2009

  • AUSIMM
    Diesel Exhaust and the Underground Miner in Western Australia

    By O Jones

    Longstanding occupational health challenges of the underground hard-rock mining sector require both an analysis of historical data to assess evidence of linkages between the source of the problem and

    Aug 31, 2015

  • AUSIMM
    The Fan Installation at Laleham Colliery

    Underground mine ventilation is now com monly simulated on a digital computer. Such a programme, incorporating natural ventilation has been modified by others to account for methane emission and el

    Jan 1, 1983

  • AUSIMM
    Lessons learned from attempts at minimising CO2 emissions in process metallurgy – pyrolysed secondary raw materials, bio-coke, and hydrogen as alternative reducing agents

    By F Diaz, G Hovestadt, B Friedrich, D Latacz, M Sommerfeld

    The metallurgical sector significantly contributes to the global carbon footprint and encounters the challenge of developing more sustainable production methods. This study introduces novel approaches

    Jun 19, 2024

  • AUSIMM
    Localised Indicator Kriging

    By I Douglas, L Allen

    Localised indicator kriging was developed following a similar approach used by Marat Abzalov (2006) in his paper titled æLocalised uniform conditioning (LUC): A new approach for direct modelling of sm

    Sep 26, 2011

  • AUSIMM
    Applications of Advanced Remote Sensing Systems during a Mine Life

    By B P. Banerjee, S Raval

    In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr

    Jun 28, 2016

  • AUSIMM
    Experimental Validation of the Discrete Element Method (DEM)

    By W Wu

    The prospect of discrete element modelling (DEM) being used as an everyday design tool for transfer chutes in the iron ore mining industry is becoming more and more probable. However, much care needs

    Jan 1, 2007

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    Sensor-based Real-time Resource Model Reconciliation for Improved Mine Production Control – A Conceptual Framework

    By M W. N Buxton, M S. Shishvan, J Benndorf

    The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,

    Nov 24, 2014

  • AUSIMM
    One Orebody ù Two Tenements ù Multiple Owners: How to Apportion Costs and Production Equitably Over the Mine Life?

    Production sharing and cost apportionment in joint ventures is commonplace in Australasia today and elsewhere. It is a recognised convention that, with the exception of a free carry situation, joint v

    Jan 1, 2002

  • AUSIMM
    Evolution of a Structural Framework for High-grade Iron Ore Deposits

    By A R. Cruden, M S. Egglseder

    The formation of banded iron formation (BIF)-hosted high-grade iron ore deposits in the Hamersley Province, Australia has been debated for decades. Although a structural control on their formation is

    Jul 13, 2015

  • AUSIMM
    Mt Wright – geotechnical learnings from a sub level shrink

    By P Wilson

    The Mt. Wright Underground Mine is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. The establishment

    Nov 30, 2018

  • AUSIMM
    A Managed Approach to Project Insurance

    Historically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th

    Jan 1, 2007

  • AUSIMM
    The Barrier Mines-A Historical Outline

    The "Line of Lade", a generic term by which the great Broken Hill orebodies are collectively known, lies in the County of Yancowinna, New South Wales (NSW) at the south eastern extrenity of the Ba

    Jan 1, 1983

  • AUSIMM
    Real-time Methane Detection – Modern Digital Laser Spectroscopy for Hostile Environments

    By D Chalmers, C C. Harb

    The detection and control of gas levels in mining is a continuing challenge for the industry. Standard detectors have many problems that could be overcome with laser based spectroscopic instruments, b

    Aug 31, 2015

  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    Design and Construction of Tunnels for Northern Gateway Project, New Zealand

    By M Behrens, A McPhee, B D. Hegan

    This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is

    Jan 1, 2008