Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Benefits of Using SmartEar™at Pueblo Viejo

    By D Shuen, R Sales, D La Rosa

    Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting

    Sep 1, 2014

  • AUSIMM
    An Integrated Underground Mining Approach to the Structural Complexity of the Empire Vein System, Golden Cross Mine, New Zealand

    By Barber S

    The Golden Cross Mine is located within the Waitekauri Valley near the southern end of the Coromandel Ranges, eight kilometres north-west of Waihi, North Island, New Zealand. The mine is owned and o

    Jan 1, 1997

  • AUSIMM
    Mary Mac Hill - The Challenges and Strategies of Successful Open Cut Mining: A Complex Underground Gold Deposit Riddled with a Network of Complicated Voids

    By H Chalcraft, T D. Mullen

    Conditions encountered at a recently completed brownfields mining project provided valuable insight into, and development of, techniques for working in and around known underground mining voids in an

    Sep 18, 2012

  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • AUSIMM
    The Argentine Pyroclastic Loes

    By Pati±o A

    The Argentine pyroclastic loess arevulcanogenic deposits, which have their sources in the circumnpacific rim. The object of this work is to realize a de-tailed mineralogical characterization of this s

    Jan 1, 1990

  • AUSIMM
    A Geometallurgical Approach at Anglo American PlatinumÆs Mogalakwena Operation

    By T Muzondo, C Prins, D De Vaux, R Schouwstra

    The Mogalakwena Platinum Mine in the northern limb of the Bushveld Complex is Anglo American PlatinumÆs only open cast operation exploiting the Platreef. The Platreef, which extends along the basal co

    Sep 29, 2013

  • AUSIMM
    A Study on the High-Water Solidifying Materials for Gob-Along Roadside instead of Coal Pillars

    By Yin J, Sun H

    A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge s

    Jan 1, 1992

  • AUSIMM
    How progressive waste rejection should transform your mining business

    By M Pyle, R Ch, T Vizcarra, ramohan, G Lane, G Ballantyne

    Preconcentration, through gravity separation (Wallace et al, 2015), magnetic separation and particle size (Clout, 2013), has been used in many historical projects to convert low grade material into or

    Nov 10, 2020

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • AUSIMM
    Managing the Margin at Norseman, Western Australia – A Case Study

    By B P. Micke

    Central Norseman Gold Corporation was established in 1935 and has been mining on the Norseman field in Western Australia since then. It is Australia’s longest continuously operating gold mining operat

    Mar 24, 2014

  • AUSIMM
    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013

  • AUSIMM
    Birth, Death and Rebirth of the Duchess Phosphate Rock Deposits

    Since the initial discovery of phosphate rock resources in North West Queensland in 1966, significant changes in ownership and development direction have occurred. Initially development of the resourc

    Jan 1, 1998

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New Zealand

    By D Craw, P V. Angus

    Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre

    Jan 1, 1999

  • AUSIMM
    Combining Multi-Camera-Data of Flotation Circuit with PCA and PLS

    By H Hy÷tyniemi

    In this paper multivariate data analysis performed on a new multi-camera system implemented to zinc flotation circuit of PyhSsalmi mine is presented. Image-analysis-based system was developed to take

    Jan 1, 2005

  • AUSIMM
    Australia's Mineral Resources- A Vital Role: An Uncertain Future

    The long-term outlook Tor Australla's traditional mining products is for flat demand and continuing low prices. This has come about because of three far-reaching changes since earlier boom day

    Jan 1, 1987

  • AUSIMM
    Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit Designs

    By Mogi G, Akaike A, Yamaguchi U

    A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met

    Jan 1, 1995

  • AUSIMM
    Challenging the Norm – Alternative Excavation Method in Mining

    By R Burke, G Ramage, C Donnelly

    Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde

    Mar 24, 2014

  • AUSIMM
    Requirements for Coal in Japanese Coking Blends

    Japanese pig iron production in 1973 registered about 90 million tons. As clearly seen from the productivity (2.04 t/m3/D), and fuel ratio (494 kg/t-pig), the Japanese steel industry has maintained q

    Jan 1, 1975