Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Impact of Fluidised-bed Flotation for Treating Coarse Sulfides

    By H Thanasekaran, M J. Mankosa, J N. Kohmuench, G H. Luttrell

    "Fluidised-bed flotation has been demonstrated over the last 16 years as an effective method for improving the flotation recovery of coarse particles. This technology has been successfully deployed in

    Oct 10, 2016

  • AUSIMM
    Simulation of Flexible Circuits

    By MáAndrusiewicz, M M. Hilden, M S. Powell, P D. Kay, B Foggiatto

    Circuits with unconventional and potentially more complex designs are predicted to become more common in the future as plant designers and operators look to process ores more efficiently. Ideas have b

    Oct 29, 2012

  • AUSIMM
    Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to Mining

    By J Joy, A Bye, G V. Kizil

    This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame

    Jul 10, 2012

  • AUSIMM
    Quantifying segregation of minerals and metals in particulate materials using computed X-ray tomography and variography

    By G Gilchrist, S C. Dominy, T Jashashvili, R C. A Minnitt

    The grouping and segregation error is one of Gy’s seven errors that cannot be measured in any qualitative manner because of its transient and changing characteristics each time the sample is handled m

    May 9, 2017

  • AUSIMM
    A Collaborative Approach to Iron Ore Beneficiation at Assmang Khumani Processing Plant

    By S Döpp

    Commencing with early experiences in iron ore beneficiation made at Beeshoek Mine, the paper follows through the process of extensive mineralogical and metallurgical investigations carried out during

    Jul 11, 2011

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal Mine

    By D Cork, R Peet

    "Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis

    Jun 1, 2012

  • AUSIMM
    Back to basics: resourcing the mining industry

    By S Dunbar, S Harrison, J Cilliers

    ‘Those who cannot remember the past are condemned to repeat it.’George Santayana (16 December 1863 in Madrid, Spain to 26 September 1952 in Rome, Italy). Philosopher, essayist, poet and novelist.The m

    Aug 29, 2018

  • AUSIMM
    Reducing ventilation change downtime and increasing operational uptime

    By J A. Rowland

    When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during

    Oct 12, 2022

  • AUSIMM
    Improved Trigger Action Response Plan Development Based Upon Mine-specific Data

    By D Cliff, B Belle

    Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a

    Aug 31, 2015

  • AUSIMM
    The Design and Performance of Underground Explosion Barriers ù A Review

    By T O&apos, Beirne

    The paper focuses on explosibility conditions in underground coal mines, the behaviour of explosions from initiating gas ignitions to violent dust explosions and the effectiveness and limits of operat

    Jan 1, 1997

  • AUSIMM
    Alternative Access, Mining and Hoisting for Underground Deposits

    It is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam

    Jan 1, 2000

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Benefits of Advanced Technology in Underground Mining

    By M Edhammer

    In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants

    Mar 21, 2011

  • AUSIMM
    Improvements in estimating strengths of loose tailings: results from the TAILLIQ research project

    By D Reid, J Vinod, M Rahman, A Fourie, T Vo, J Ayala, A Russell

    This paper reports on an industry and Australian Research Council funded research project, TAILLIQ, that is a joint initiative between four Australian Universities. The paper discusses the accuracy wi

    Jul 1, 2021

  • AUSIMM
    Computer Assisted Ore Reserve Calculations at Western Mining Corporation Ltd's Kambalda Nickel Operations

    By Reichman J. P

    Extensive use is made of a small scale computer (IBM 1130), in the calculations of ore reserves for Western Mining Corporation's nickel mine at Kambalda, W.A. All surface drilling data such a

    Jan 1, 1973

  • AUSIMM
    Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry Mining

    By J Siliézar

    The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa – Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with a

    Jul 11, 2011

  • AUSIMM
    Advanced Ventilation Control – An Analysis of Innovation and Environmental Sustainability

    By V S. Mutton, M J. Shearer

    "The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G

    Aug 31, 2015

  • AUSIMM
    The State of Sampling Practice in the South African Minerals Industry

    The state of sampling practice in South African minerals industry must be appreciated in the context of the changes that the country has recently lived through. These include the entrepreneurship and

    Mar 1, 2010

  • AUSIMM
    Equilibrium distribution of Pb between copper metal and slags

    By C Chen, T Kan

    The distribution ratio of Pb (LPb s/m) between three types of slags (FeOx–SiO2, CaO–FeOx and FeOx– CaO–SiO2) and molten copper after equilibrium was measured at 1300°C and oxygen partial pressure (pO2

    Jun 19, 2024