Search Documents

  • ISEE
    Journal: Make a Good Impression / Pre-blast Surveys

    By Sandra Penttinen

    There are several ways to get a positive reaction from neighbors to blasting projects. When you need to enter structures to conduct a pre-blast inspection, the impression you make on the structure own

    Jan 1, 2006

  • IOM3
    Environmental aspects of coalbed methane extraction, with emphasis on water treatment and disposal

    By L. B. Clarke

    The optimal maintenance and control of the air flow and pressure distribution in a mine network are achieved by the correct positioning of the mine fans and regulators within the mine ventilation circ

    Jul 1, 1996

  • SAIMM
    Twin Process Filtration

    [ ]

    Jan 1, 2009

  • AUSIMM
    The Risdon Sulfuric Acid Plant of the Electrolytic Zinc Company of Australasia Limited

    The acid plant consists of the following units: 1. Glover tower. 6. Mills-Packard type chambers. 3. Reaction towers. 6. Gay-Lussac towers.The sulphur dioxide bearing gases, used in the manufacture of

    Jan 1, 1934

  • IOM3
    Bohmke reef: platinum-group element mineralization associated with C1d chromitite of the Great Dyke, Zimbabwe

    By S. J. Parry, D. M. Evans, D. L. Buchanan

    The reef is a PGE-enriched sulphidic zone, stratigraphically associated with and overlapping the C1d chromitite layer, that was formed by magmatic processes at the 1e-1d subunit boundary. Two distinct

    Apr 1, 1996

  • SAIMM
    The Mechanism, Optimization And Effects Of Preconditioning

    By A. Z. Toper

    This is a sampling of the papers presented at the conference, the proceedings can be bought from the SAIMM An extensive research programme to address the issue of rockburst control has been underta

    Jan 1, 2000

  • CIM
    Recent Developments of Laser-Induced Breakdown Spectroscopy for Real-Time Measurement and Control of Mineral Processing

    By Alain Blouin, Mohamad Sabsabi, Aissa Harhira, Paul Bouchard, Greg Lithgow

    "The objective of this study was to demonstrate the application of Laser-Induced Breakdown Spectroscopy (LIBS) to the continuous analysis of online monitoring of Al, Mg, Ni, Mn, Si and Fe in nickel or

    Jan 1, 2016

  • CIM
    Implementing Safe Production at Kittilä Mine

    The information in this document has been prepared as at February 16, 2011. Certain statements contained in this document constitute ?forward-looking statements? within the meaning of the United State

    May 1, 2011

  • IIMP
    Modelo prefabricado para salidas de emergencias en minas subterráneas

    By Roberto Bria

    El presente texto describe el módulo prefabricado para las salidas de emergencia. En este sentido, el sistema modular prefabricado busca facilitar y agilizar la instalación de salidas de emergencia de

    Sep 21, 2013

  • SME
    Roof Bolter Rocker Pad Deflector Systems

    By Arnold Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby

    Jan 1, 2009

  • SAIMM
    A Methodology for Determining the Erosion Profile of the Freeze Lining in Submerged Arc Furnace

    By H. Dong

    This paper presents a heat conduction model to determine the erosion profile of freeze linings in a ferronickel submerged arc furnace. Kirchhoff transformation was adopted to simplify the nonlinear eq

    Jan 1, 2014

  • SME
    Second Avenue Subway—Tunneling Beneath Manhattan

    By Geoffrey Fosbrook, Donald Phillips, Anil Parikh

    The Second Avenue Subway is a $16.8 billion project planned by the Metropolitan Transportation Authority (MTA) in New York City. It will reduce overcrowding and delays on the Lexington Avenue Line, im

    Jan 1, 2005

  • SAIMM
    The Prediction Of Underground Drilling Noise

    By G. S. Harper

    Noise in general and drilling noise in particular have received increasing attention within the South African mining industry during the last 10?15 years. The Mine Health and Safety Committee1, during

    Jan 1, 2006

  • AUSIMM
    Optimisation of a Semi-autogenous Grinding Mill through Trajectory and Power Modelling

    By P Toor

    Mill filling is an important operational parameter in a SAG mill circuit and by its control and optimisation it can produce significant improvements in production capacity and energy efficiency. Howev

    Sep 7, 2015

  • AUSIMM
    New Zealand as an Exploration Destination: 2000 Update

    This paper provides an update to a paper by the author on an overseas explorer's perception of New Zealand, presented at the 1997 New Zealand Minerals & Mining Conference. New Zealand has one

    Jan 1, 2000

  • CIM
    Architecture of Gold Mineralization at Anomaly A of the Clarence Stream Deposits, Southern New Brunswick

    By A. J. Hynes, Lutes. G. G., Ravenelle. J. -F.

    "The Anomaly A area of the Clarence Stream gold deposits in southwestern New Brunswick contains mineralized structures that bear geometrical relationships to regional folding events. The four minerali

    Jan 1, 2008

  • SAIMM
    Some Practical Aspects Of The Use Of Lognormal Models For Confidence Limits And Block Distributions In South African Gold Mines (fb46b25c-eb38-486d-ae41-a92c3f6edf12)

    By D. G. Krige

    For the purpose of determining confidence limits for ore grade estimates, an extensive simulated database was used, which included 1728 ore blocks with ?actual? grades and the corresponding estimates

    Jan 1, 2004

  • AUSIMM
    Detrital Gold in North Westland

    Detrital gold in the Greymouth-Hokitika area has been won from: (a) gravel of the Pliocene Old Man Group, (b) glacial outwash gravel of Middle and Late Quaternary age, (c) raised shoreline deposits of

    Jan 1, 1996

  • AIME
    The Geology, Mining, And Preparation Of Barite In Washington County, Missouri.*

    By A. A. Steel

    (Spokane Meeting, September, 1909.) DURING. the summer of 1905 I was employed by the U. S. Geological Survey to investigate the geology, Mining, and preparation of barite in most. of the fields of th

    Feb 1, 1910

  • AUSIMM
    Philosophy of Slope Design: A Case Study of Geotechnical Investigations at Macraes Flat Gold Mine

    Site specific geotechnical data, deposit characteristics and method of mining are key factors when assessing an appropriate slope design philosophy. Mining geotechnics should be viewed as an iterative

    Jan 1, 1992