Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Stability Control of Clusters of Deep Openings Around Shaft Bottom and Theory of Rock Deformation

    By Yanfa Gao

    Clusters of underground openings were developed around the shaft bottom of Tangshan Mine. They were deep and located in soft rock strata. After development, those openings have been subjected to consi

    Jan 1, 2002

  • SME-ICGCM
    Injection Techniques for Cost-effective Stabilization of Brittle and Faulted Strata Zones

    By Martin Bolesta

    The use of strata injection as a means of stabilizing brittle and heavily stressed ground as well as faulted zones is now state-of-the art technology. Users are obliged to select the right combination

    Jan 1, 2001

  • SME-ICGCM
    Application Of Sliding Roof Bar Powered Support For Thick-Seam Coal Mining

    By Zhang Liandong

    Roof control in thick-seam mining has long been a difficult problem in mine design and coal mining. In the early 1980's, through ground control instrumentation and investigation the rules of r

    Jan 1, 1990

  • SME-ICGCM
    Design Considerations For Cable Truss Secondary Supports In Roadways Of Underground Collieries

    The purpose and current practice of cable trusses in underground coal mines is briefly outlined and details of various cable truss designs are presented. The main part of the paper describes the in-si

    Jan 1, 1992

  • SME-ICGCM
    A Method To Determine Expander Spacing For Steel Pipelines In Mining Districts

    By Axel Preusse

    In the Ruhr district, pipelines of public and private infrastructure are made of cast iron, steel, plastics or asbestos cement. Legal framework, technical regulations and normative standards define wh

    Jan 1, 2004

  • SME-ICGCM
    Design and Field Testing of a Mobile Roof Support for Retreat Mining,

    By Robert R. Thompson

    Retreat pillar mining is highly productive but dangerous. The primary danger during pillar removal is premature caving of the roof. Because the safety of the miners is dependent on successfully contro

    Jan 1, 1986

  • SME-ICGCM
    A New Rock Mass Failure Criteria Based On Rate Of Movement

    By Hamid Maleki

    A new failure criteria is proposed for assessment of roof stability in underground sedimentary rocks. Unlike other stability assessment techniques, this method is simple and practical, having improved

    Jan 1, 1990

  • SME-ICGCM
    New Methods and Technologies of Roofbolting in Australia Coal Mines

    By Mictck Rataj

    Methods of rock reinforcement in Australian coal mines are being advanced progressively through the better understanding of rock failure mechanisms around roadways and the-development of improved bolt

    Jan 1, 1997

  • SME-ICGCM
    Drivage System In Retreat Longwall Gateroad

    By Kikuo Matsui

    In a difficult economic environment, the coal mines in Japan have been making extensive efforts in order to survive by rationalizing the mining operations. Introduction of a new longwall mining system

    Jan 1, 1995

  • SME-ICGCM
    Safety and Productivity Innovations in Mechanized Bolting

    By Gregory Hinshaw

    Underground mine bolting machines have evolved since inception in the 1940's due to the need for increased safety and productivity. However, major design innovations historically came from change

    Jan 1, 1998

  • SME-ICGCM
    New Tools For Roof Support Evaluation And Design (64c31d00-3878-45a5-a962-d673afed7598)

    By Steve Signer

    Researchers at the National Institute for Occupational Safety and Health (NIOSH) have developed several new tools for evaluating roof support performance. A miniature data acquisition system (MIDAS) w

    Jan 1, 2003

  • SME-ICGCM
    Development of Geotechnical Procedures for the Analysis of Mine Seismicity and Pillar Designs

    By Hamid Maleki

    Mining in the Book Cliffs Coal Field of Utah has historically been associated with seismicity because of high-stress environments and the presence of stiff, competent rocks. Recognizing the geotechnic

    Jan 1, 2003

  • SME-ICGCM
    Worldwide Implementation Of Continuous Miner System - Integrating Ground Control With Technology

    By Thomas W. McClain

    This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Eac

    Jan 1, 2001

  • SME-ICGCM
    Evaluating Anchorage Mechanisms Of Fully Encapsulated Rock Bolts

    By Clare Offner

    In 1998, the Australian Coal Association Research Program (ACARP) awarded funding to the School of Mining Engineering at the University of New South Wales to establish a rockbolt testing facility to r

    Jan 1, 2000

  • SME-ICGCM
    Progress In The Knowledge Of Granite Cutting With Diamond Wire (bf80b832-f557-4b46-b5c9-31193e67bf2d)

    By A. Bortolussi

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contribution h

    Jan 1, 1992

  • SME-ICGCM
    A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground

    By Kevin W. Harris

    Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif

    Jan 1, 2014

  • SME-ICGCM
    Investigation of Acoustic Emission Sensors for Ground Control Hazard Recognition in Underground Mines

    By Gary Buchan

    "Mine-wide ground control stability is essential to any mining operation to prevent catastrophic failure of underground structures. The ability to recognize or indicate the potential for ground contro

    Jan 1, 2018

  • SME-ICGCM
    The Search For A Method To Provide Warning Of Coal And Gas Outbursts

    By Fred Leighton

    Outbursts, or the sudden and sometimes catastrophic expulsion of coal and gas into the working area of a coal mine, are a little understood and growing problem. The AE/MS (Acoustic Emission/Microseism

    Jan 1, 1982

  • SME-ICGCM
    Stress Analysis and Support Design for Longwall Mine-Through Entries (A Case Study)

    By Keith Heasley

    An eastern longwall mine was required to mine through a set of three entries located midway down the length of a panel. Of course, the mine desired to design a successful support system for the mine-t

    Jan 1, 2003

  • SME-ICGCM
    Roof Control With Polyurethane For Recovery Of Kitt Energy?s 1000-Foot Longwall

    By J. G. Stewart

    Polyurethane injection for the consolidation and control of broken strata is a common practice in the deep mines in Europe. The technology has gained wide acceptance in the coal mines of America since

    Jan 1, 1984