Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Resin-Grouted Cables For Longwall Tailgate Support Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines (USBM) is conducting research to provide alternatives for traditional secondary support methods. These cost-saving methods are proving to afford safer installation, improve en

    Jan 1, 1994

  • SME-ICGCM
    Surface Flooding-Considerations For Mining Facilities Site Selection

    By Daniel S. Mazzei

    This paper will be a general discussion of surface flooding considerations as they affect mining facilities site selection, based primarily on experience with several such problems with which MSHA&apo

    Jan 1, 1982

  • SME-ICGCM
    Site Characterization For Ultra-Close Multi-Seam Mining

    By Yingxin Zhou

    Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl

    Jan 1, 1990

  • SME-ICGCM
    Application of Tensioned Cable Bolts for Supplemental Support

    By Ben Mirabile, Alan Campoli, Rodney Poland

    "The majority of U.S. underground coal mines use some form of cable bolt as supplemental support to a primary roof bolting system. Many coal operators employ the high load capacity of non-tensioned ca

    Jan 1, 2010

  • SME-ICGCM
    lnterpanel Barriers for Deep Western U.S. Longwall Mining

    By Leo Gilbride

    Western U.S. longwall operators face increasing challenges with optimizing ground control and productivity as mines reach greater depths and coal bursting hazards increase. Some western U.S. mines, ma

    Jan 1, 2004

  • SME-ICGCM
    Application Of Tailing Sand And Water As Backfill Material In Metal Mines (1992)

    By Sun Henghu

    This paper analyses problems associated with cement based technique in metal mines, and provides a new mining technique of packing the tailing sand and water into solidified material. In the new techn

    Jan 1, 1992

  • SME-ICGCM
    Application in Design for Close Proximity Multi-Seem Mining

    Virtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl

    Jan 1, 1987

  • SME-ICGCM
    AMCMRR- An Analytical Model for Coal Mine Roof Reinforcement

    By Mark G. Colwell, Russell Frith

    "An Analytical Model for Coal Mine Roof Reinforcement (AMCMRR) has been developed. AMCMRR utilizes a Factor of Safety (FOS) approach, which is commonly used in all forms of engineering. The starting p

    Jan 1, 2010

  • SME-ICGCM
    Analysis of Panel Stability for Post-Mining Slurry Injection

    By Tim Ross

    Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces

    Jan 1, 1998

  • SME-ICGCM
    Machine Design Parameters For High Seam Truss Bolting Applications

    By G. Bucelluni

    An essential element of truss bolt installation requires machines to angle a hole in the top of approximately 39° to 45° from its vertical axis. Parameter which inherently effect the drill position ar

    Jan 1, 1982

  • SME-ICGCM
    Stereological Sampling And Analysis For Characterizing Discontinuous Rock Masses

    By J. K. Owens

    As part of a larger research effort focused on ground control, the U.S. Bureau of Mines is currently evaluating the effectiveness of using stereological analysis for characterizing mine roof strata. I

    Jan 1, 1994

  • SME-ICGCM
    Flexible Support Design For Gateroads Of Retreating Longwall Panels

    By Erdal Unal

    In gate roads where supports are subjected to dynamic loading four times due to retreating longwall panels, it is a real challenge to replace the rigid arches with flexible reinforcement systems and y

    Jan 1, 1993

  • SME-ICGCM
    Improved Design Of Coal Pillars For U.S. Mining Conditions

    By Z. T. Bieniawski

    This paper presents the results of a survey of room and pillar dimensions and design practice in U.S. coal mines aimed at improving the design procedures in room and pillar mining. A review is given o

    Jan 1, 1981

  • SME-ICGCM
    Seam Structure - An Important Criterion for Coal Pillar Design

    By Kot F. v. Unrug

    In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m

    Jan 1, 2005

  • SME-ICGCM
    Entry Stability Monitoring & Analysis For Longwall & Continuous Mining Systems

    By Wm. Mark Hart

    Under a specific geological condition, roof supporting method, and pillar-entry system, an entry convergence concept may be the most effective means that can be used to effectively indicate the longwa

    Jan 1, 1995

  • SME-ICGCM
    An Analytical Approach For The Estimation Of Pillar Strength

    A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co

    Jan 1, 1990

  • SME-ICGCM
    SDPS Update: Easy Calculation of the Edge Effect Offset for Complex Extraction Panels

    By Joshua Hescock, Zach Agioutantis

    "The Surface Deformation Prediction System (SDPS) has been developed as an engineering tool for the prediction of subsidence deformation indices through the implementation of an influence function. SD

    Jan 1, 2017

  • SME-ICGCM
    A Study Of Floor Heave In The Mines Of The Southern Coalfield Of New South Wales By Two Dimensional Finite Element Modelling

    By A. K. Bhattacharyya

    The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. Apar

    Jan 1, 1992

  • SME-ICGCM
    Tekcrete Fast®: Fiber-Reinforced, Rapid-Setting Sprayed Concrete for Rib and Surface Control

    By Stephen C. Tadolini, Minova USA Inc., Peter S. Mills, David R. Burkhard

    "Fiber-reinforced spayed concrete has been used for several years in civil and tunneling operations. Research conducted to reduce cure times and increase compressive and flexural strengths resulted in

    Jan 1, 2017

  • SME-ICGCM
    Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case Study

    By Li Yang, Andre Cezar Zingano, Alberto Fronza

    "Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f

    Jan 1, 2017