Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Groundwater Control For Two-Pass Soft Ground Tunneling
By Cary Hirner, David Stacey, William A. Rochford
Design considerations and construction techniques were implemented to address groundwater infiltration from a confined aquifer during the excavation and lining of the Cady Marsh Flood Relief Tunnel. T
Jan 1, 2007
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow Tunnel
By K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Design, Construction And Start-Up Of The Ilo Smelter Modernization Project
By H. Walqui, C. Noriega
Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000
Jan 1, 2007
-
Minerals Processing 1991
Microorganisms are finding more use in the mineral industry, with extensive research efforts being reported in 1991. Most of these research efforts were presented in two major meetings, the SME Annual
Jan 1, 1992
-
Disc Cutter Performance in Boulder-Laden Ground ? Introduction
By D. S. Kieffer
Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl
Jan 1, 2008
-
Data Evaluation for Sustainable Development Indicators
By S. Möllerherm
"The evaluation of data and information provided by the existing traditional indicators in sustainability assessments is most important. Therefore the Institute of Mining Engineering I from the RWTH A
Jan 1, 2005
-
Evaluating Underground Mining Hazards By Fuzzy FMEA
By S. K. Oraee
Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he
Jan 1, 2011
-
Mojave Sustainability Project – Model For Community Partnerships
By Neville Slade, Doug Shumway, Dayan Anderson, Joe Siefke, Curtis James
The Mojave Desert is a particularly fragile ecosystem that faces several significant impacts. These include rapid housing development, overdrafted water supplies and loss of wildlife habitat — all a
Jan 1, 2005
-
An Innovation In Machine Tunneling
By J. Donovan Jacobs
Many improvements in the art of underground excavation have appeared during the past two decades. These improvements have been both in methods and in machinery and have resulted in more economical con
Jan 1, 1974
-
Tunnelling Under Glaciers - Construction Update: Galore Creek Mine Access Tunnel, British Columbia, Canada
By Dean Brox
The Galore Creek Mine project is one of the newest major mining projects under development in Canada. The project is located in a very remote area of northwestern British Columbia and is being develop
Jan 1, 2008
-
Design of Large and Shallow Caverns of New York Second Avenue Subway
By Verya Nasri
The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f
Jan 1, 2008
-
In Situ Stress Measurement In A Jointed Basalt: The Suitability Of Five Overcoring Techniques
By T. A. Rundle, K. Kim, W. M. McCabe, E. C. Gregory
Overcoring tests were conducted at the Near-Surface Test Facility(NSTF) to assess the suitability of five techniques (U.S. Bureau of Mines borehole deformation gauge (BDG), Commonwealth Scientific and
Jan 1, 1983
-
Utilization of Strain Measurements on Shielded Tunnel Boring Machines
By Brad Murray
Evaluating the performance of a shielded tunnel boring machine (TBM) can be difficult because the ground cannot be observed directly and in relation to the TBM attitude within the excavation. It is di
Jan 1, 2008
-
Steel Fiber Microsilica Shotcrete With Remote Controlled Equipment
By Galyn Rippentropp, Finn Erik Overlie
INTRODUCTION The wet shotcreting system utilizing steelfiber microsilica shotcrete with remote controlled equipment (The Robocon System) was developed in Norway 7-8 years ago. Norway was the natura
Jan 1, 1987
-
Tying Acceleration And GPS Location Information Together To Create A Mine Management Tool (46eb7fa8-c025-4c28-b865-1393c124ce32)
By J. Walden, S. Rhoades, R. E. Miller, R. Gibbs, P. Boman
Accelerometers and pressure transducers mounted in suspension components can be used to monitor the ride of haulage trucks. Presently, it is difficult to tell what caused a jolt to the truck using eit
Jan 1, 1999
-
New York City’s Harbor Siphons Water Tunnel
By Colin Lawrence, Michael S. Schultz
Due to the planned deepening of the NY Harbor, NYCEDC/NYCDEP is planning to replace two existing water lines between Brooklyn and Staten Island with one deeper water pipe. The crossing, just north of
Jan 1, 2007
-
Design And Construction Service Tunnels On Palm Jumeirah Island
By Ben Hayes, Michael Ryjevski
The Palm Jumeirah is the smallest of the three Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira). It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emira
Jan 1, 2007
-
Small Diameter Tunneling?Pipe Jacking Under Leipzig Main Train Station
By Klaus Rieker
The main train station of Leipzig in Germany is currently being upgraded from a head station to a partially thru station. In order to achieve this, significant ground improvements are necessary. Soil
Jan 1, 2008
-
Warm Springs Ponds: Superfund Success
By Harry E. Hughes
A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that
Jan 1, 1996
-
Foreign coal is a threat, but US producers are finding ways to compete
By Steve Kral
Competition from foreign coal producers could displace as much as 9 Mt/a (10 million stpy) of US coal bound for power plants located near waterways. But, according to a Maryland-based coal consultant,
Jan 1, 1986