Process Control at P.T. Freeport Indonesia's Milling OperationsBy Andrew J. Neale, Chelvan Veloo
P.T. Freeport Indonesia currently operate a 600,000 t/d mining and 125,000 t/d milling operation in the remote highlands of Irian Jaya, Indonesia. The isolated location and generally difficult working
Jan 1, 1997
-
Hydrometallurgical Conversion Of Stibnite To Antimonous Oxide Via Antimony TrichlorideBy John L. Shafer
A process for the conversion of stibnite (Sb2Sj) concentrates, crude antimony oxide, or metal to a pure cubic antimonous oxide (senarmontite) has been developed on a laboratory scale. The conversion o
Jan 1, 1975
-
Process Automation Improvements At Cleveland Cliffs (e40786cc-dc29-4876-83da-79e4eda557b8)By D. W. Hendrickson
Cliffs views the process as extending from mine planning to cargo loading including auxiliary systems such as material handling and plant utilities. Process automation is recognized as an area that ca
Jan 1, 1998
-
Thunderbird CollieriesBy Thomas R. Hightower
The Thunderbird plant was erected in Sullivan County in Indiana during 1958-1959. It was first put in operation in March of 1959. At the present time the source of the raw coal is from the Indiana No.
Jan 1, 1961
-
APPENDIX: Review of Economic Analysis TechniquesBy Dan Nilsson
INTRODUCTION A company must have an objective, and that usually is to earn money. In some countries an objective can also be to reduce unemployment in an area or to develop nonindustrialized areas. G
Jan 1, 1982
-
Fluidized Bed Chlorination Of RutileBy Julian Glasser
Starting with rutile, containing more than 55% TiO2 and of the proper particle size, the commercial production of titanium tetrachloride via fluidized bed chlorination is relatively very simple and ec
Jan 1, 1962
-
Calculations For Remote Seal DP Pressure Transmitters Configured To Measure Specific GravityBy Paul H. Muller
The configuration of remote seal DP cells for specific gravity measurement is described and the calculations for calibration are presented. The error induced by ambient temperature change is investiga
Jan 1, 1984
-
Robinson: An Integrated OperationBy M. R. Grundy
The Robinson project is based on the porphyry copper and gold deposits in the Robinson Mining District, near Ely in Eastern Nevada. The district was mined from the late nineteenth century to 1978 by K
Jan 1, 1994
-
Ground Freezing For Mine Shaft SinkingBy P. C. Schmall
Ground freezing has been used for the sinking of deep mine shafts for more than 140 years. While advances in refrigeration technology have refined the overall freezing operation, the basic ground free
Jan 1, 2010
-
The Analysis And Simulation Of Once-Through CrushersBy R. S. C. Rogers
A mathematical model is proposed as a general formulation for the analysis and simulation of once-through crushing machines. Methods are described which can be used to estimate parameters of the propo
Jan 1, 1984
-
Portable Rock Strength Tester And Economic Benefits Of Rapid TestingBy Z. J. Hladysz
The Hladysz Rock Tester was developed at the South Dakota School of Mines as a portable rock strength tester. The hand held device is placed against a rock surface and struck by a hammer. The impacted
Jan 1, 1984
-
Operations Research To Operations PlanBy D. Gatzemeier
The Jewett mine is a surface mine in central Texas, producing about 8,000,000 tons/year of lignite. The mine covers 46,000 acres of land. Approximately 430 people are employed by Northwestern Resource
Jan 1, 1993
-
Interpreting Entry Stability and Geologic Hazards Utilizing BorescopesBy T. Klemetti, W. H. Su, M. A. Van Dyke
Entry stability in coal mines is dependent on geologic conditions and engineering controls. Most engineering controls in ground control are predictable and standardized for typical geologic conditions
Jan 1, 2019
-
Pneumatic Conveying In Open Pit Mines - Application Of Pneumatic Conveying To Open Pit MiningBy W. J. Aitken
The pneumatic conveying of relatively large abrasive materials by dilute-phase conveying techniques has been applied in the underground mining industry for many years especially for backfilling mines
Jan 1, 1981
-
Developments And Innovations In Bacterial Oxidation Of Refractory Ores (PRIPRINT 91-75)By P. C. van Aswegen
The Bacterial Oxidation (BIOX®) process for the pre-treatment of refractory ores for gold recovery developed by Genmin, the mining division of Gencor, has been operating successfully at the Fairview m
Jan 1, 1991
-
Analytic Models For Determining Capacity And Discharge Rates For Feeders And Surge Bins In Mine Conveyor NetworksBy Anil Kumar
In underground mine production units that employ discrete-vehicle face haulage, feeders are used in the belt network so that vehicles can unload rapidly without transmitting to the conveyor network th
Jan 1, 1994
-
NIOSH Tools For Hearing Loss Prevention ProgramsBy A. S. Azman
The mining workforce experiences high rates of hazardous noise exposure and hearing loss. However, previous studies have identified specific behavioral and attitudinal barriers that keep miners from e
Jan 1, 2010
-
Gravity Concentration At Campbell MineBy Brad Hewitt
Since Campbell Mine began processing ore, there has been a gravity gold recovery circuit. From 1947 to 1982, gravity gold was concentrated through the combination of jigs and mercury amalgamation. In
Jan 1, 1996
-
Development of the BX04 Impeller System for Bio-Oxidation ReactorsBy W. Baguley, L. P. H. Greenhalgh, R. P. Riley
The traditional impeller system for aeration and suspension of slurries, e.g. in bacterial oxidation plants, is the vertical flat blade turbine (VFBT) . This type of impeller is energy-intensive, whi
Jan 1, 1992
-
Computerized Critical Path Scheduling Of Longwall MovesBy Dale K. Nash
The authors have developed a com¬puter-assisted critical path planning and scheduling model to help reduce time required to move longwall mining units. The model includes time constraints and limited
Jan 1, 1983