The value proposition of circulating fluidized-bed technology for the utility power sector
By N. J. Castilla, R. Giglio
"Circulating fluidized-bed (CFB) combustion technology has been around for over 40 years, but over the last 6 years it has been commercially demonstrated at the 500 MWe scale at the Lagisza plant loca
Jan 1, 2015
-
Application of a Localized Direct Conditioning Mineral Resource Modelling Technique for Medium- and Long-Term Planning of Underground Mining Operations
At the exploration stage for new mining projects or for medium- and long-term areas of existing mines (typical of South African gold mines), drilling data is on a relatively large grid. This grid is n
Jan 1, 2014
-
Non-Linear System Identification Of An Autocatalytic Reactor Using Least Squares Support Vector Machines
Paper written on project work carried out in partial fulfilment of B.Sc. Eng. (Extractive Metallurgy)degree The concepts behind support vector machines are very interesting both in theory and in pr
Jan 1, 2003
-
New Generation Contact Shoes Influence On The Process - 1. Introduction
By Christian Roche
Our study is focused on the sub-assembly con-tact shoes, pressure rings and pressure bellows. We were keen to mainly study [ ] 1.The contact shoe design 2.The most efficient pressure to ensure an
Jan 1, 2007
-
Effluent Reduction Projects Sulphuric Acid Plant - Background Information
By M. Jele
? Sulphuric acid plant in umbogintwini. ? Double absorption plant, capacity of 550MTPD. ? Build by simon curve during the year 1973. ? Side stream plants such as: ? Liquid SO2 Plant, ? Li
Jan 1, 2009
-
Increasing efficiency of conveyor belt transporting system 4 Belt Lonmin - Synopsis
By G. G. le Roux
The purpose of the investigation was to assess various options for increasing the efficiency of the conveyor belt transporting system used at 4 Belt Shaft at Lonmin?s Marikana operations. The reason f
Jan 1, 2008
-
Thought Processes During The Project Initiation Phase
By H. Griesel
The overall supply of platinum is forecast to rise more than the demand, and market deficit will narrow somewhat, but is still substantial at about 480 000 ounces. Because of this deficit, the price o
Jan 1, 2004
-
Underwind And Overwind Protection Systems With Enhanced Self-Sufficiency (030db833-15eb-45bc-a368-bd664b61eafa)
By N. D. L. Burger
Underwind and overwind protection system concepts for mine hoist shafts were developed in conjunction with and for the Safety in Mines Research Advisory Committee (SIMRAC). End-of-wind operation of mi
Jan 1, 2004
-
An investigation of mechanisms involved in backfill-rock mass behaviour in narrow vein mining - Synopsis
By F. P. Hassani
Today, mine backfilling has become an integral part of mining operations, both from a local and overall ground control point of view, and as regards mining techniques and environmental considerations.
Jan 1, 2008
-
The Fabric Of Coal-Mine Refuse As Backfilling Material And Its Relation To Grain-Size Distribution Parameters
By M. G. Senyur
This study aims at investigating the structural characteristics of backfilling material. In this regard, spatial arrangement of solid particles and associated voids in a unit mass of coal mine refuse
Jan 1, 1998
-
The Corrosivity Regions Of Southern Africa ? Long Term Trends And Implications For Materials Selection - 1. Introduction
By John E. Leitch
The cost of corrosion as measured by such cost components as the renovation or replacement of coated steel, or the use of expensive coating systems on steel, is considerable. Extrapolating from figur
Jan 1, 2006
-
2D DEM Verification: Load Behaviour And Forces On A Lifter Bar
By M. A. van Nierop
The Discrete Element Method (DEM) is a model that is used to simulate the motion of the media in a grinding mill. The sum of the energy that is lost in inter-media and media-wall collisions represents
Jan 1, 1999
-
Rheological Characterisation Of Mineral Slurries Using Balanced Beam Tube Viscometry
By P. T. Slatter
The efficient and accurate design of pipe and pumping plant for non-Newtonian mineral slurries remains a problem. The objective of this paper is to present the development of the Balanced Beam Tube Vi
Jan 1, 1998
-
Reconstruction time of a mine through reliability analysis and genetic algorithms - Synopsis
By M. Kumral
A mining system consists of many sub-systems such as drilling, blasting, loading, hauling, ventilation, hoisting and supporting. During mining operation, these sub-systems may experience various probl
Jan 1, 2009
-
Metallurgy From Above ? A Google Earth Perspective
By Q. C. Reynolds
Keywords: Pyrometallurgy, plant, photography, GIS, satellite images, Google Earth Google Earth is a piece of software able to display an interactive three-dimensional map of the world, combining a
Jan 1, 2006
-
Bateman Mega DMS Modules- Successes And Challenges - Introduction
By N September, R Abate
Bateman Modular (previously Van Eck and Lurie) has been building and supplying the mining industry with modular DMS plants for the last 30 years. These DMS modules range in capacity from 1 tph to 200
Jan 1, 2006
-
Evaluation Of A Limit Equilibrium Model To Simulate Crush Pillar Behaviour - Synopsis
By M. du Plessis
This paper describes the evaluation of a limit equilibrium model to simulate the behaviour of crush pillars in platinum mines. An analytical model was derived to calculate the residual average pillar
Jan 1, 2011
-
Ore Pass Rehabilitation - Case Studies From Impala Platinum Limited
By L. J. Gardner
Ore pass systems play a critical role in moving broken rock from the workplace to surface, and the integrity of the ore pass excavations is crucial. Over the life of the mine, ore pass integrity deter
Jan 1, 2006
-
A Review of Work-Integrated Learning in South African Mining Engineering Universities
By L. A. Maseko
"As part of the mining engineering curriculum, students are required to be placed in industry for vacation work or work-integrated learning (WIL). In this paper we review work-based placement as done
Dec 1, 2018
-
Double-header trains at Great Noligwa mine - Synopsis
By L. van Dyk
The project was aimed at evaluating the double-header trains implemented at Great Noligwa mine, looking at the changes from the old conventional trains to the new trains, and identifying possible impr
Jan 1, 2008