Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)
By George Piscsalko
"Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
Jan 1, 2017
-
St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test Program
By Jeffrey A. Gebhard
As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes
Jan 1, 2009
-
Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA Finalist
By Bill Shea, Gordon King
"For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood
Jan 1, 2012
-
Deep Mixing Field Trials for Land Remediation: Some 3-Year Results from the SMiRT Project
By Ziyad Abunada, David O’Connor, Fei Jin, Abir Al-Tabbaa
"In-situ remediation of contaminated land with deep mixing can enable a multi-technique remedial strategy on the same site combining low permeability barriers, permeable reactive barriers, stabilisati
Jan 1, 2015
-
Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special Application
By Andhra Pradesh, Nagarajkumar B. V
As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad
Sep 1, 2022
-
The Power of Committee Research: The DFI Rock Socket Project
By Anne Lemnitzer
Experimental data are the cornerstone of scientific research, providing empirical evidence to validate hypotheses, test theories, inform decision-making and help develop innovative design and analysis
Nov 1, 2023
-
Hammer-Grout Piles At The Bronx-Whitestone Bridge
By Ameir Altaee
Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho
Jan 1, 2010
-
A Collaborative Approach To The Design And Delivery Of The Most Heavily Loaded Piles Ever Constructed In The Uk
By Morris J. D, Baldwin Z., Wiltcher P. M
21 Moorfields is an oversite development in central London spanning Moorgate tube station. It required the installation of both the highest loaded bearing piles and the highest top loaded static pile
-
Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of Structures
By A. A. Gupte
Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use
Jan 1, 1989
-
Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002
By Colin Curtis
The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an
Jan 1, 2002
-
The Use of Advanced Electronic Features in Foundation Equipment Help or Hype for the User?
By Manfred Schoepf
"Construction projects using the most advanced technologies and organizational structures demand intelligent construction machinery. In this process, automation technology plays an increasingly import
Jan 1, 2015
-
Ground Improvement By Jet Grouting For A Natural Gas Combined Cycle Power Plant In Turkey
By Alp Gokalp
The aim of this article is to present an application of jet grouting technique in stiff clays for foundations of the natural gas combined cycle power plant, under construction in Aliaga, Turkey. The p
Jan 1, 2002
-
Case Study Of Three Bidirectional Static Load Tests For Bored Piles At Sabana Costa Rica
By Mauricio Coto
Three bidirectional static load tests (BDSLT) were executed on bored concrete piles, as part of the permanent foundations for two buildings sites located at the Sabana, San Jose, Costa Rica, separated
-
Pile Foundation, Retaining Structures For Deep Excavation And Anti-Buoyancy Anchors In Shanghai Soft Soils
By Sun Gengsheng
Geotechnical properties of soils, usual types of pile foundations, pile capacity, calculation of settlements of pile foundations, usual types of retaining structures for deep excavation, stability ana
Jan 1, 1991
-
Woodrow Wilson Bridge Cofferdams
By Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2005
-
TRD Soil Mixing at Herbert Hoover Dike
By George Burke
"Many soil mixing methods have evolved over the years, but the Trench Cutting Re-mixing Deep method (TRD) was developed in Japan, circa 1993, to construct continuous uniform cutoff walls, without the
Jan 1, 2009
-
Stone Columns At Trenton Water Treatment Facility - Suitable Alternative To Remove And Replace For Mat Foundation
By Darrell Wilder
The Trenton Water Treatment Facility in Trenton, New Jersey, is expanding to upgrade existing facilities and to meet the increasing demands of the public. The facility sits uncomfortably between the
Jan 1, 2008
-
Injecting Sustainability into Deep Soil Mixing Projects
By Paul R. Lear
Sustainability continues to be an important aspect of remediation and infrastructure projects. Deep soil mixing (DSM), a common construction and remedial technology, can easily incorporate the followi
Sep 8, 2021
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)
By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2015
-
Drilled Shaft In Strong Rock-Design, Validation, And Construction Of The Beauharnois Canal Bridge, Autoroute 30 Montréal
By Ivan Hee
The 2.5km long bridge over the Beauharnois Canal and St. Lawrence Seaway is a major structure in the new Autoroute 30 project near Montreal. Foundations for the bridge consist of footings on bedrock,
Jan 1, 2011