Double Rotary Head Piling Systems (Cased CFA)By Franz-Werner Gerressen
In the changing construction environment clients are searching for new technology to complete their projects in shorter times. Manufacturers are therefore developing solutions to speed up established
Jan 1, 2009
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Caisson Foundations For Mississippi River Bridges In The New Orleans AreaBy William B. Conway
This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du
Jan 1, 2013
-
Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
Removal of the Former San Francisco-Oakland Bay Bridge Foundation Caisson E3 by Mechanical Means and ExplosivesBy Michael Gebman, Jack Gerwick
"With the opening of the new San Francisco-Oakland Bay Bridge East Span, the former bridge and its caisson foundations are being demolished. Caisson foundations are in the path of a future shipping ch
Jan 1, 2016
-
A Seepage Control Cutoff in an Extreme Saline EnvironmentBy Kevin Green, Iván Contreras, Aaron Grosser, Jon Ausdemore, Rachel Leier, Amr Ragy
"Construction of a new tailings dam was required to increase tailings storage capacity at a trona mine near Green River, Wyoming. The new dam was founded on overburden soils underlain by both fracture
Jan 1, 2016
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Using Rigid Inclusions, Helical Piles And Micropiles To Revitalize 1600 Smallman Street.By Melinda J. Hummel, Zachary T. Smith, Nathaniel Witter, Nina F. Carney
The revitalization of Pittsburgh’s historic Strip District has led to the redevelopment of existing properties and the development of new properties. At one time, the Strip was home to wholesale marke
-
London One New Change - Energy Piles® And Open Loop Wells Used For Ground Source Heating And CoolingBy Peter Smith
One New Change is a landmark retail / commercial development in the City of London. Integral to the structure is the three double storey basement from which the building is serviced. The building cons
Jan 1, 2010
-
Case Histories On The Applications Of Colloidal Silica For Permeation GroutingBy Davide Grassi, Joel Joaquin Cortez, Giovanni Spagnoli, Nick Chittenden
Grouting is a technique used to improve the engineering properties of soils and rocks. Grouting techniques are classified under different criteria: injection method used, type of grout material inject
May 1, 2022
-
Ground Improvement for Reclaimed LandfillsBy Steven E. Darnell, William W. Haasz, Brandon T. Buschmeier, Frederic Masse
"Landfills often cover expansive areas in locations where large building facilities or infrastructure is in high in demand after the land has been reclaimed. Most landfills have soil or fill propertie
Jan 1, 2017
-
TTMJ – The New System for Slurry (Diaphragm) Wall JointsBy Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley
"TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-
Jan 1, 2017
-
Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck BridgeBy Timothy C. Siegel, Paul J. Axtell
The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.
Jan 1, 2017
-
Flood Protection System for Infrastructures: Methodology and Instrumentation TestingBy Gisele R. Passalacqua, Taylor Malangone, Subhash Mahali
New York City is a busy metropolis with 8 million people. New York has the largest public transportation system with 6 million riders a day throughout the subway system. Keeping this infrastructure in
Sep 8, 2021
-
Deep Foundations for Top-Down Construction of High-Rise ProjectBy Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin
A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const
Jan 1, 2019
-
Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction ApproachBy M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek
"The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB
Jan 1, 2016
-
Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement ProjectBy Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain
"Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r
Jan 1, 2016
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And ConstructionBy David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019
-
Design of Grillage and Helical Pile Foundation for Limited Access Transmission LineBy Benjamin Jennings, Jason Herron
In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis
Jan 1, 2017