Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • CIM
    Stabilization of Arsenic in the Mining and Metallurgical Industries ? A Review

    By Sengpasith Houngaloune

    Arsenic, which is a toxic and carcinogenic element, causes serious environmental problems throughout the world. It is also known as a major contaminant in the non-ferrous mining and extractive metallu

    Aug 1, 2013

  • CIM
    Improved Hydrogen Cyanide Detection with Laser-Based Line-of-Sight Gas Detectors

    By Klaus Tietz, Hamish Adam, John Selby, Ian Glazier, Brian Sinfield

    "Room-temperature tunable diode laser (TDL) analyzers are gaining in acceptance for highly critical safety monitoring applications in a variety of industries. This paper describes the testing, evaluat

    Jan 1, 2011

  • CIM
    Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotive

    By A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté

    "A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr

    Jan 1, 2004

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Mineral Process Plant Monitoring at Greens Creek: By Looking at the Minerals Themselves

    By R. Haecker, S. Bajic, R. Thorpe, A. Palko, M. Kalstrom

    "Historically, mineral processors have used inferential data like plant instrumentation, assays, and grind sizes to monitor the performance of their plants. The ability to monitor the minerals themsel

    Jan 1, 2014

  • CIM
    A Touch of Froth: How Bubble-Particle Aggregates Take the Strain

    By Marco A. Vera

    "This paper investigates the froth function in flotation and the associated upgrading process. Flotation literature has revealed that one of the main functions of the froth phase is the cleaning of bu

    Jan 1, 2003

  • CIM
    Haile Gold Mine Metallurgy and Flowsheet Review

    By P. Tittes, M. Deal, M. Spicher, S. McDaniel, J. Wickens

    "Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through se

    Jan 1, 2013

  • CIM
    Environmental and ventilation benefits for underground mining operations using fuel cell powered production equipment (0d6b8fbf-8199-4422-8088-a542f4b15d8b)

    By D. Eastick, S. Hardcastle

    "Over the last few years, a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell-powered equipment into underground mines to replaced diesel engine-powered equipm

    Jan 1, 2007

  • CIM
    Environmental planning in mine waste management — The Huckleberry Mines experience (CIM BULLETIN)

    By H. F. Letient, D. C. Johnson

    At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to

    Jan 1, 2004

  • CIM
    Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air Purification

    By Hiroaki Sakurai

    Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p

    Oct 1, 2003

  • CIM
    Activated Carbon’s Use in Gold Adsorption and Recovery (Presented with Consideration to the Operator’s Point-of-View) Scotia International of Nevada, Inc

    By Michael Drozd

    "The operation of an activated charcoal system has five separate unit operations. These unit operations have common points for CIP, CIL and CIS system, which vary widely in application.The unit operat

    Jan 1, 2008

  • CIM
    Evaluation of Environmentally Friendly Collectors for Xanthate Replacement

    By J. Dong

    "Xanthate is a sulfide collector that has been widely used in flotation for almost a century. It is inexpensive, easy to synthesize and apply, and produces good metallurgy in the right applications. H

    Jan 1, 2011

  • CIM
    Developments in at-Face/in-Pit Processing Technologies

    By Martin Stoklossa

    Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho

    May 1, 2008

  • CIM
    A Moveable Mineral Processing Miniplant

    By P. Wells, P. Quinn

    "A moveable flotation miniplant was designed and constructed at the research laboratory of Inco Technical Services Ltd. to address the need for flowsheet development with a limited amount of ore (such

    Jan 1, 2003

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    Modelling and Resource Estimation of a Thin-Layered Lignite Deposit

    By Ioannis K. Kapageridis

    The lignite deposits of the Kozani-Ptolemais-Amyntaio basin in western Macedonia (North-West Greece) present a difficult modelling problem. Each deposit consists of several thin lignite layers ranging

    Oct 1, 2009

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Enrichment of Low Grade Iron Ore for Better Resource Utilisation

    By L. Parthasarathy, S. K. Pan, M. P. Srivastava

    "Total iron ore reserves in India, as reported by the Indian Bureau of mines, are 23.6 billion tons. Hematite iron ore reserves constitute about 45 % of the total reserve. If we go by the National Ste

    Jan 1, 2008