Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Burr Project Potash Mine Development

    Burr Mineral Resource has: ?Grade / Thickness / Tonnage ?Dry Caprock ?Low Carnallite ?Low Clay / Insolubles ?Flat & Continuous Deposit ?Proper depth

    May 1, 2009

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    Performance of Large Low- and High-Aspect Ratio SAG Mills at Gold Fields’ Ghanaian and Australian Mines

    By Michael I. Brittan, Craig M. Sams

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations using very large SAG mills fitted with variable speed drives. Low-aspectratio si

    Jan 1, 2006

  • CIM
    Residence time distributions modelling for mineral processes evaluation

    By C. Bazin, D. Hodouin

    "A flexible model involving perfect mixers, stagnant zones, plug flow, material bypassing and recycling zones has been developed for interpreting mixing phenomena in mineral processes. The mixing prop

    Jan 1, 1988

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    Dust Control, Brenda Mines Limited, Peachland B.C.

    By J. W. Austin

    "Introduction The Brenda dust collection system was originally designed to handle air at the 5000 ft. elevation with less than 1 grain of dust per cubic feet of air handled. The temperature variation

    Jan 1, 1976

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • CIM
    The Cinola Project, Process and Environment

    By C. J. A. Davie

    "SUMMARY A practical application of nitric acid oxidation of sulphides, based on the principles of the Arseno process, has been developed for the Cinola ore. Development of the process has been based

    Jan 1, 1989

  • CIM
    The Development of the Coal Industry 1n Canada, from 1920 to 1935

    By F. W. Gray

    IN 1922, the writer communicated to the Institute a paper entitled The Development of the Coal Industry in Canada (1), which summarized the considerations set out in a series of papers (2) concerned w

    Jan 1, 1936

  • CIM
    Dynamic hydraulic shovel simulator for improved machine performance

    By S. Frimpong

    Hydraulic shovels are widely used for primary production in surface mining operations. Variability in material diggability, unstructured mining environments and limited space and operator inefficiency

    Jan 1, 2005

  • CIM
    The Greenhills surface coal mining project

    By Clifford Britch

    "Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine

    Jan 1, 1981

  • CIM
    Matching laboratory and plant performance - a case study of the Elura lead circuit, Pasminco Australia Limited

    By M. C. Pietrobon

    "A common problem in assessing the applicability of laboratory flotation data is determining how closely conditions during laboratory testing of the ore matches those that occur in a plant. Typical la

    Jan 1, 2002

  • CIM
    In situ testing in underground backfilled stopes

    By Malcolm Scoble, Jean-Marc Robert, Luciano Piciacchia

    "An approach to the in situ testing of mine backfills is outlined. It has been developed to provide a measure of the effective strength and stiffness of such materials after placement in stopes. This

    Jan 1, 1987

  • CIM
    Promises, Promises: Students, Industry and The New Labour Market

    Geology grads mine heated job market Salaries up 44 per cent in three years ?[Geology student] passed up a $100,000-a-year job at a mining company last December when he finished his degree in geol

    May 1, 2008

  • CIM
    Developments in the Hydrometallurgical Processing of Nickel Laterites

    By F. McCarthy, W. Zhang, R. McDonald

    "The processing of nickel laterites has been a topic of major interest at CSIRO for almost twenty years. During this period CSIRO has collaborated with other researchers and industry in developing a b

    Jan 1, 2017

  • CIM
    Mining at Depth under Weak Rockmass São Bento Mineração S/A Santa Bárbara, MG Brazil

    By Barnard Foo

    Topics of Discussion ?Location ?Production & Mining Operation ?Mineralization ?Mining Method ?Rock Mechanics Issues ?Ground Control Problems ?Numerical Analysis ?RockmassBehaviour ?Conclus

    Feb 1, 2008

  • CIM
    Changes in grade, volume and contained gold during the mining life-cycle of gold placer deposits

    By J. D. Bliss, G. J. Orris, W. O. Menzie

    "Analysis of gold placer data from gold placers throughout the world suggests that gold grades and volumes cannot be used to distinguish between most types of gold placers. Only the alluvial plain and

    Jan 1, 1987

  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007

  • CIM
    The Pinehouse Limestone Project

    By Doug Smith, Gary Taylor, Paul Ogryzlo

    "Uranium mining and processing typically requires large quantities of high-grade reactive quicklime for the neutralization and clean-up of contaminated mine water and mill process waste streams. Curre

    Jan 1, 2003

  • CIM
    Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands Interactions

    By Samuel Frimpong

    The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the

    May 1, 2004