Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Pilot Plant Pressure Oxidation of Refractory Gold-Silver Concentrate from Eldorado Gold Corporation’s Certej Project in Romania

    By J. Stiksma, J. Dennett, R. Kalanchey, J. Ji, M. Collins, T. Chan, R. Berezowsky

    A pilot plant campaign has been conducted by Sherritt Technologies in support of Eldorado Gold Corporation’s evaluation of pressure oxidation technology for the treatment of refractory gold concentrat

    Jan 1, 2014

  • CIM
    The Earth Moving Equipment Safety Round Table Design Evaluation for Equipment Procurement Process

    Diverse and considerable energies are associated with mobile equipment operated and maintained on mine sites. Loss of control of these energies is a common cause of injury on mine sites and this is we

    Aug 1, 2013

  • CIM
    Gold analyses - myths, frauds and truths

    By G. W. Poling, G. W. Hawthorn

    """Unassayable gold and platinum group metals"" have come into vogue in the 70sand 80s in certain jurisdictions as a means of perpetrating fraud. Usual arguments are that a particular ore is not amena

    Jan 1, 1989

  • CIM
    New Afton Project

    By David Nicholls

    ?Overview of New Afton ?Reserves and Resources ?Geology and Mineralization ?Exploration ?Capital Project Development to Date ?Mine Development ?Processing ?Construction ?LOM ?Health, Safety,

    May 1, 2010

  • CIM
    Satellite Communication - An essential Tool for the Mining Industry

    An essential tool for every step ? Early field survey ? Handheld satellite phones ? Portable satellite phones ? Exploration and Drilling ? Handheld satellite phones ? Portable satellite phones

    May 1, 2006

  • CIM
    Facing the future with an engine and its fuel considered as a system

    By K. D. Eng, W. T. Tierney

    "During the past century, the development of vehicular transportation has benefitted tremendously from the performance improvement in engines in a situation where low-cost, plentiful fuel supplies wer

    Jan 1, 1982

  • CIM
    HPGR Trade-Off Studies and How to Avoid Them

    By C. T. Morley

    The steadily increasing interest in high pressure grinding rolls (HPGR) as a legitimate alternative comminution technology for hard rock applications has led to a proportional increase in the demand f

    Jan 1, 2012

  • CIM
    Characteristics of Modern Copper Flotation Circuits

    As part of the Australian Mineral Industries Research Association (AMIRA) P9 project, methods of characterising both the ore and the machines in flotation circuits have matured considerably over the p

    Jan 1, 2007

  • CIM
    Density and Porosity Concepts for Asbestos and , Other Minerals

    By M. Cossette, P. C. A?tcin

    At present there is considerable confusion in the asbestos industry with regard to density and porosity measurements of asbestos. In order to clarify the situation, various notions of porosity and den

    Jan 1, 1972

  • CIM
    Design of Agitators for Storage and Surge Tanks with High Yield Stress Fluids

    By J. Jung, W. Keller, N. Rohn

    In hydrometallurgical minerals processing slurries are often processed at very small grind sizes and high solids concentrations. This normally results in flow anomalies of such slurries. Due to flow l

    Jan 1, 2014

  • CIM
    The Separation of the Bitumen from Alberta Bituminous Sands

    By K. A. Clark

    A meeting between representatives of the Scientific and Industrial Research Council of Alberta and the Deputy Minister of Mines for Canada was held at Edmonton in May, 1929, for the purpose of formula

    Jan 1, 1929

  • CIM
    Design and Field Implementation of Alternate Stable Mining Geometries for Set-Up Rooms in Longwall Mining

    By Yoginder P. Chugh

    This paper discusses an ongoing field study in southern Illinois (USA) that focuses on: 1) Identifying mechanisms of instability in the set-up rooms (SR) and their T-junctions with headgate and tailga

    Aug 1, 2013

  • CIM
    The Ecstall Story: The Open-Pit Mine

    By George C. Coupland

    "THE PRELIMINARY EVALUATION of the orebodies was computerized for tonnages and grades on a 20- by 20-ft grid. The evaluation was based on drill-core intersections over 40-ft vertical projections coinc

    Jan 1, 1974

  • CIM
    Leach Residue Filtration at the Hudbay Zinc Pressure Leach Plant

    By S. Shairp

    "After cooling and thickening, slurry from the second stage of the Hudbay zinc pressure leach circuit is filtered and washed on a belt filter prior to disposal. At times, the belt filter can be a bott

    Jan 1, 2012

  • CIM
    Control of sodium-rich brine inflows at Central Canada Potash - Part 1: .Rehabilitation, diamond drilling, grouting and backfilling

    By E. M. De Souza, A. M. Coode

    "When Canadian potash was brought into production in the 1960s substantial research was carried out to develop the technology needed to cope with the unique conditions in Saskatchewan mines. The inten

    Jan 1, 1990

  • CIM
    Numerical and Experimental Investigation of Failure Mechanism of Rock Using Extended Digital Image Correlation (X-DIC) Technique

    By S. Bhattacharjee

    "Rock failure process is generally recorded or measured using conventional sensors like strain gauges, seismic, micro-seismic, acoustic, electromagnetic and other techniques. The above sensors are eit

    Jan 1, 2015

  • CIM
    Mine ventilation for an underground salt mine

    By D. A. Nelson, Wedding. R. E.

    "A planned production increase of 1.25 million tonnes per year at Domtar's salt mine in Goderich, Ontario required an increase in the underground mine ventilation system from 320,000 to 700,000 s

    Jan 1, 1983

  • CIM
    New Development in Liner Design for Large Autogenous Mills (e956eb23-d616-474d-9dc9-d4512f8d61a8)

    By L. Furtenbach, T. Möller

    "Grinding mills are the heart of the mineral processing plant, and are production-critical machines which are required to achieve high availability. Liner wear life and a liner design that promotes ea

    Jan 1, 2012

  • CIM
    Planning and operational cutoff grades based on computerized net present value and net cash flow

    By Arnold R. Pasieka, George V. Sotirow

    "The object of this paper is to outline a computerized net cash flow approach for practical cutoff grade determinations. A cutoff grade carries not only geological but also economic value, in which co

    Jan 1, 1985

  • CIM
    METSIM® as a mass balancing tool for platinum-group metal concentrators

    By M. Greyling, C. Panaou, M. Bellino

    Commonly the most frequent method of calculating the overall mass balance of a multi mineral platinum-group metal (PGM) concentrator circuit in Southern Africa has been through the use of spreadsheets

    Jan 1, 2005