Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design & Development of the Barmac Rotopactor
By Bryan A. Bartley
"Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla
Jan 1, 1985
-
Investigations of Conveyor Belts Condition in the Institute of Mining Engineering at Wroclaw University of Technology
By R. Blazej
Machinery Systems Division (MSD) in the Institute of Mining Engineering at Wroclaw University of Technology specializes in belt conveying systems analyzing, calculating and design. Within the division
Aug 1, 2013
-
Deep shaft hoisting at LaRonde —The Penna shaft hoisting plant
By B. McLaughlin
Agnico-Eagle started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1800 t/d from a 2240 m deep shaft. Exploration success led to the installation of a hoisting plant capabl
Jan 1, 2004
-
Energy Conservation at Falconbridge Nickel Mines Limited
By D. M. Doyle
"In this paper I will summarized the Falconbridge Nickel Mines1) energy costs and consumption data by fuel, process, cost centre and estimate our future costs and consumption patterns 2) detail the di
Jan 1, 1978
-
Pebble Grinding At Bethlehem Copper Corporation
By E. A. Lowe, J. W. Smith, C. W. Overton
"The operations of Bethlehem Copper are situated in the south-central interior of British Columbia at an elevation of 4900 feet above sea level. Main road and rail transportation systems pass through
Jan 1, 1975
-
An Alternative Approach to Estimating the Composition of Existing Waste Rock Facilities
By Matthew P. Wickham
The use of existing mine records in conjunction with an appropriate classification scheme can be used successfully to identify and characterize the composition of existing waste rock facilities where
May 1, 2002
-
Green Supply Chain Management: A Future Need For Mining And Mineral Industry
By D. P. Tripathy
A supply chain encompasses all the activities associated with the flow and transformation of goods from the raw materials stage(extraction), through to the end user. Supply chain management (SCM) is t
May 1, 2006
-
The Systematic Reclamation of Gold Mine Tailings
By Jean-Claude LeRoy, Herman Keller
"INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part
Jan 1, 1975
-
Jolu Gold Mine Low Cost Gold Recovery Configuration
By J. Kazakoff
"The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This
Jan 1, 1990
-
The Recovery of Copper from Copper Oxide Ore using Heap Leaching, Solvent Extraction and Electrowinning
By R. H. Walton
"In recent years the recovery of copper from low grade oxide ores has received widespread attention. The cost of treating such ores using conventional technology, such as milling and flotation, is fre
Jan 1, 1990
-
Bench and Pilot Scale Test Programs to Specify Autogenous Grinding Circuits
By C. J. Farrow, M. J. Smith
"Bechtel has managed a number of test programs to establish autogenous grinding circuits and size mills for a variety of ores.This paper outlines the procedures whereby bench scale and pilot plant tes
Jan 1, 1982
-
Automated Mine Scheduling: What is it and will it help me?
By Fraser Rowe
This paper discusses the philosophies, strategies, goals and pitfalls in automating a mine schedule. The intention of the paper is to give an open and honest view of who could benefit from moving to a
Oct 1, 2009
-
Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration Plant
By S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam
At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale
Jan 1, 2016
-
Overview of maintenance practices at Louvicourt mine
By R. Hamilton
"Louvicourt mine began operation in 1994. It is located in northwestern Quebec, 20 km east of Val d’Or. The mine is owned by Aur Resources (30%), which operates the mine, Teck/Cominco (25%) and Novico
Jan 1, 2003
-
Analyse Des Écoulements De L?eau En Conditions Non Saturées Dans Les Haldes À Stériles
By Michel Aubertin
Les haldes à stériles contenant des minéraux sulfureux réactifs constituent un milieu favorable à la production du drainage minier acide (DMA). Au sein de ces haldes, les processus physiques, géochimi
Nov 1, 2002
-
The Nanisivik Mill
By A. C. T. Bigg
"The mineral potential of the Nanisivik area was discovered as far back as 1910 when a prospector of the Geological Survey of Canada, on an expedition under Captain J. G.Bernier, recorded a deposit of
Jan 1, 1980
-
Characterization of Reference Gold Catalysts
By Susumu Tsubota
Three types of reference gold catalysts, i.e., 3wt%Au/TiO2 (Au-Ti: Type A), and 0.3wt%Au/Fe2O3 on alumina beads (AUS: Type B), and 5wt%Au/Fe2O3 (Au-Fe: Type C), were produced in a test plant scale by
Oct 1, 2003
-
Thermal rock fragmentation — Applications in narrow-vein extraction (abb2f77e-ef62-4687-9449-c7f2069ea82d)
By D. Brisebois, J. M. Fecteau, S. Poirier
"This paper focusses on new developments regarding thermal rock fragmentation applications. The technology consists of a strong burner powered by diesel fuel and air. The thermal reaction that is crea
Jan 1, 2003
-
Communications in Plant Design
By J. C. Loretto
"OPENING REMARKS Yesterday and today we have heard some very interesting papers on operating matters and some of you are probably wondering what we are now doing talking about Communications in Plant
Jan 1, 1973
-
Experimental Investigation of a Heap Leaching Process on Montauban Gold Tailings
By J. Dionne
"Next to the actual mine of Les Explorations Muscocho Ltée in Montauban, Quebéc, you could find a total of 364 000 tons of flotation tailings assaying 1.4 Au g/t et 82 g Ag/t to the south of the munic
Jan 1, 1987