Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Washing of Calcine to Remove Soluble Salts at Great Boulder Gold Mines LimitedIn the- past, at Great Boulder Gold Mines Ltd,, ,' s.. number of attempts ' ha'tre been made to remove water ' `solublo copper and' iron sa'lt's from calcined pyri
Jan 1, 1964
-
Plant Control and Data Logging in the Loy Yang Open CutThe Plant Control and Data Logging System for the Loy Yang Open Cut (LYOC) is part of a control and communications network designed to provide a high level of surveillance of open cut plant and fac
Jan 1, 1982
-
The Campamento Gold/Silver Deposit, Southern Mexico - Telescoping of Epithermal Mineralisation Over Early-Formed Porphyry-Style AlterationBy T Christopher
The Campamento Au/Ag deposit, discovered by Linear Gold in 2004, is located in Chiapas State, southern Mexico. The deposit is hosted by a sequence of Pleistocene-Pliocene andesitic volcanic rocks that
Jan 1, 2008
-
Tectonics of the Pacific Ocean Basin Using Gravity Anomalies Recovered From Seasat Altimeter DataDeformation of the lithosphere by tectonic forces is investigated from both observational and theoretical standpoints. Global and regional geophysical data bases, coupled with the means for their r
Jan 1, 1987
-
The Origin and Evolution of Australian Coal and Notes on Classification and RankINDEX OF CONTENTSIntroduction.Systems of classification of coals.RankClassification of Australian coals.Defects of systems in use in other countries.Indexing by Fuel Ratio.Classification by Ultimate C
Jan 1, 1948
-
Achieving High Performance in the Australian Mineral Resources IndustryThe competitiveness and future growth of the Australian mineral resources industry face a number of challenges. The paper addresses key factors likely to influence the attainment of high performance
Jan 1, 1997
-
Use of Dynamic Simulation as an Optimisation and Risk Management Tool in Process and Logistics OperationsBy C Glassock, P Bodon, M Elias
Computer simulation is a well-accepted tool for modelling the behaviour of large or complex operating systems. Less common is the use of simulation as a design aid, but FluorÆs simulation group regula
Jan 1, 2003
-
Dust Control in Open Cut Using a Bucket Wheel Excavator SystemThe main objectives of this paper are to identify the main sources of coal dust and to investigate measures for minimisation of dust generated at these sources at the Bukit Asam open cut mine, on th
Jan 1, 1994
-
Report from DelftThis report on the 5th International Conference on Underground Space and Earth Sheltered Structures, which was held at the University of Technology, Delft, the Netherlands, on 2 to 5 August 1992, was
Jan 1, 1993
-
Engineering of a Modern Coal Preparation PlantThe detailed engineering of a coal preparation plant is important from the point of view of optimum constructibility, operational security, ease of maintenance, operating costs, meeting environment
Jan 1, 1982
-
Architectural Design and Treatment of Surface Area and BuildingsIn considering the architectural design of the group of buildings which make the surface workings of a mine, the variety of function of the buildings is the most outstanding feature. It falls to the a
Jan 1, 1957
-
Managing Market Uncertainties in Project DevelopmentIn planning its production and investment activities the mining industry has generally paid too little attention to perceptive analysis of its market environment. The nature of world economic diffi
Jan 1, 1983
-
The Significance of Bentonite Type in Relation to Pellestising OperationsBy Adamiak Z. P
A study has been made of the influence of bentonite type on the wet strengths, dry strengths and drying rates of pressed iron ore pellets. Measurements of the influence of bentonite on the kinetic
Jan 1, 1973
-
Long-Term Performance and Cost Benefit Analysis of Passive Acid Mine Drainage Treatment Systems Installed in the Appalachian Coal Region of the Eastern United StatesBy J S. Simmons, J G. Skousen
This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalised according to construction cost, projected s
Jan 1, 2003
-
Rock and Pebble Milling at Kambalda Nickel OperationsThe reasons for selecting two stage pebble milling in preference to conventional methods of grinding are discussed. Commissioning of the first section was completed in October, 1969. Improvements in
Jan 1, 1975
-
Improvements in Fine Coal Recovery at the Moura Mine of Theiss Dampier Mitsui Coal Pty. Ltd.By Rosentreter N
Difficulties with froth flotation recovery and vacuum de- watering equipment for the treatment of fine coal have been investigated. Mechanical alterations to cyclone desliming banks, and flotation
Jan 1, 1978
-
Parameters in Rotary Drill Bit Life at Elura Mine, N.S.W.A paper presenting the results of studies carried out on rotary drill bit life at EluraMine N.S.W.Contributing parameters, including dataon drill operation and geology are compared to the performance
Jan 1, 1985
-
Rare Earths Production and Marketing OpportunitiesThe rare earths market is relatively small and slow growing. Three applications using mainly cerics rare earths : catalysts, glass-ceramics and metallurgy are volume market. Inside this slow movin
Jan 1, 1986
-
Mathematical Economic Methods in Projecting Planning and Managing of Mining IndustryEconomic mathematical methods have been developed and applied in the design, planning, development and managing stages in the mining industry. Economic and technological efficiency is achieved wit
Jan 1, 1977
-
Prediction of Geomechanic Situations and Planning of Mining Operations at Coal Mines of Kuzbass, USSRThe complicated mining-geological conditions in the Kuzbass have led to some difficult mining situations in the past. Now, with historical data, supplemented by geomechanical information and measureme
Jan 1, 1991