Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Mathematical Modelling of Rock Fragmentation by High Pressure Arc Discharges

    The mathematical modelling of rock fragmentation by blasting is one of the most difficult and challenging problems of applied mathematics. Not only is complex mathematics required but there is incom

    Jan 1, 1990

  • AUSIMM
    Production Blasting Practice at Hamersley Iron Pty. Limited

    By Kaleta S, McTavish LP, Turner RD

    Primary production blasting at Hamers- ley Iron began with seven inch holes at Tom Price in 1966 and has developed since then to large multiple row shots of 381 mm holes at Tom Price and 311 mm at

    Jan 1, 1978

  • AUSIMM
    Ventilation At Depth At North Broken Hill Limited

    Autocompression and virgin rock tempera ture have a marked influence on the ventilation of the lower levels at North Broken Hill Limited N.S.W. To maintain comfortable working temp- eratures without

    Jan 1, 1977

  • AUSIMM
    The Mechanism of Xanthate Adsorption on Pyrite

    By Fuerstenau DW

    The flotation of pyrite in ethyl xanthate solutions is presented along with electrokinetic results. The results have been analysed in view of recently published thermodynamic calculations as well a

    Jan 1, 1993

  • AUSIMM
    In-Seam Seismic Methods for the Prediction of Outburst in Coal Seams.

    By King D

    Recent field experiments in the United Kingdom (Buchanan, 1979) have shown that the in-seam technique is capable of detecting a 1m fault in a 3m seam, at a range of 280m and with a resolution of ¦4

    Jan 1, 1980

  • AUSIMM
    Mining Through Underground Workings in Fimiston Open Pit Kalgoorlie Consolidated Gold Mines (KCGM)

    By T Jones, K Karunaratna

    The Kalgoorlie Consolidated Gold Mines (KCGM) Fimiston Open Pit is located on the eastern boundary of the Kalgoorlie-Boulder City and is mining an area traditionally known as the Golden Mile. The pit

    Jan 1, 2003

  • AUSIMM
    The Auscoke Project

    The Auscoke project has reached-a stage where a pilot plant nominally able to produce 100 t.p.d. of coked briquettes is being brought on stream during Nov. 1971 . The targets for this stage of the

    Jan 1, 1972

  • AUSIMM
    Paleoplacer Potential in the Mid-Proterozoic of the Northern Territory-A Study of the Westmoreland Conglomerate

    By Wygralk A, Hallenstein CP

    On a world scale, many Mid-Proterozoic fluvial sediments are prospective for low grade, large-tonnage gold deposits. A significant area of the Northern Territory is covered by such Mid-Proterozoic

    Jan 1, 1984

  • AUSIMM
    Towards Larger Flotation Machines

    Economic and technical reasons forced the mining industry all over the world to increase the unit size of mineral processing equipment. in large flotation cells, this development leads to problems

    Jan 1, 1978

  • AUSIMM
    Recoverable Resource Estimation Using Bivariate Uniform Conditioning at the Lihir Gold Mine

    By A Tomsett, R Kidd, Z Casley

    Bivariate recoverable resource estimation aims at predicting the recovered metal for a secondary variable when a cut-off is applied to a primary variable. The choice of a consistent geostatistical mod

    Jan 1, 2009

  • AUSIMM
    Mine Dewatering at Mount Lyell, the 1980Æs and Beyond

    Mining operations have been carried out at Mt. Lyell for the past century. Until the 1970's the location of the mines in relation to the surface topography has enabled the mines to drain their

    Jan 1, 1982

  • AUSIMM
    Carbon distribution behaviour between molten iron and CaO-Al2O3-FeOSiO2- MgO slag at 1873 K

    By G H. Park, Y J. Jun, J H. Park

    The carbon solubility of the CaO-Al2O3-FeO-SiO2-MgO slag, the main system formed in the Ruhrstahl-Heraeus (RH) vacuum degasser, was measured at 1873 K to understand the effect of slag compositions on

    Jun 19, 2024

  • AUSIMM
    Filtering Techniques Adopted to Ensure that Rosebery Concentrates Meet Transportable Moisture Limit Requirements

    The Transportable Moisture Limits, as ,measured by the procedures laid down in The IMCO Code of Safe Practices for Bulk Cargoes, determine the target moisture contents for the concentrates produced

    Jan 1, 1978

  • AUSIMM
    Burden Movement Experiments Using the Hybrid Stress Blasting Model (HSBM)

    By G Chitombo, M Ruest

    In surface mining, studies of the kinematics of blasted rocks using high speed film/video image analysis have allowed the estimation of the starting time, direction and magnitude of visible movement o

    Jan 1, 2007

  • AUSIMM
    Education for the Mineral Industry: The Demand for Professional Staff

    The Australasian Institute of Mining and Metallurgy and the Australian Mining Industry Council are concerned that a sufficient number of able young people receive an adequate level of professional

    Jan 1, 1981

  • AUSIMM
    The Geology of the Collinsville Coal Measures

    By Crapp C. E

    The Collinsville Coal Measures consist mainly of arenaceous sediments but indude eleven named coal seams. The Formation outcrops around the northern end of tbe Bowen Basin where it attains a thickness

    Jan 1, 1960

  • AUSIMM
    A Fundamental Principle for Automatic Sampler Correctness

    A new concept central to the search for sample correctness is presented. In spite of its simplicity, this concept has already unknowingly formed the implicit basis of already established, current limi

    Jan 1, 2005

  • AUSIMM
    The Negotiated Compressed Process (NCP) (An Alternative Approach to Contracting Practices)

    By Benson R. P

    Building a new tunnel to accommodate CN North America's needs or double stacked container traffic for the next 100 years represents new and unprecedented challenges. Innovative approaches to cont

    Jan 1, 1993

  • AUSIMM
    Decision Analysis in the Mining Industry

    By Bond W. F, Sharry P. V, Onley P. G

    The use of Decision Analysis is becoming more widespread in industry as a whole, and there is considerable scope for its application in the mining industry. Wherever decisions have to be made, whene

    Jan 1, 1996

  • AUSIMM
    Computerised Deposit Modelling, Volumetrics, and Production Scheduling

    By Davey CJ

    An integrated computer software system has been developed by Fluor Australia for modelling, mine planning and production scheduling of single or multi-strata deposits. Modelling of both quantitative

    Jan 1, 1983