The Use of Polysulfide as an Alternative Sulfidising Reagent for the CPS Flotation of Oxide Copper OresBy G Tsatouhas, R Newell, K Y. Wong
A sulfide ion selective electrode was used to control sulfidiser addition in the flotation testing of a synthetic and a naturally occurring ore containing malachite in order to compare the behaviour o
Jan 1, 2005
-
The Marvel Loch Crusher Product Sampling SystemThe Marvel Loch Operations (MLO) plant was treating ores from up to six MLO sources and in addition needed to blend externally sourced ores with its own ores. This presented a metallurgical accounting
Mar 1, 2010
-
Geotechnical strata characterisation using geophysics and its application for coal mine designBy T Medhurst
Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g
Nov 30, 2018
-
Research on supporting technology for production level roadways of block caving in Pulang Copper MineBy X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu
Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the
Nov 30, 2018
-
The Ernest Henry Mine Project - "The Mining Cycle"By T Amiconi
Ernest Henry Mining commenced operations on its copper-gold project in August 1997, some two months ahead of schedule and ten per cent ($35 million) under budget. The mine is located in the highly pro
Jan 1, 1998
-
Viscosity measurement of FeO-SiO2 based slags under controlled oxygen partial pressuresBy S-C Shim, H-R Lee, Y Kang, H Shin
Since iron oxide and silicon oxide are major gangue components in various types of ore, FeO-SiO2 base slag, ie fayalite slag, has been often encountered in pyrometallurgical processes of non-ferrous m
Jun 19, 2024
-
Study on the dehydroxylation process of an ultrafine goethitic oreBy M Camarda, A Pirson, F Vasconcelos, J Mesquita
ArcelorMittal Prijedor is a goethitic iron ore mine located in the north-west of Bosnia and Herzegovina, which mainly supplies ArcelorMittal’s European subsidiaries. Annual production of the asset sta
Sep 18, 2023
-
Prospects for Alternative Leaching System for Gold: A ReviewA survey of leaching systems for the dissolution of gold has been undertaken and their advantages and disadvantages evaluated both from their effectiveness at leaching and their compatibility with c
Jan 1, 1982
-
Investigation of silica reduction effects on HPGR operation condition in case of iron ore increasing specific surface areaBy M Saghaeian, M Zare, V Sheikhzadeh, R Hejazi
High-Pressure Grinding Roll (HPGR) is one of the efficient methods for increasing the specific surface area (SSA) of iron ore concentrate for pellet feed production. HPGR grinding mechanism implies th
Aug 24, 2022
-
Capital Expenditure Modelling for Strategic Mine SchedulingBy L Blackwell
Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea
Nov 24, 2014
-
The Effects of Considering the Spatial Bulk Density Variability in Mineral Resources and ReservesBy J F. C L Costa, J C. Koppe, C Diedrich
Currently mineral resources evaluation is firstly expressed in terms of volume. Next the resources are transformed into tonnes by using an average bulk density applied to the whole deposit or, in some
Sep 26, 2011
-
Twenty-five Years of Mine Filling: Developments and DirectionsThe sixth international symposium on mining with fill nearly coincides with the 25th anniversary of the Jubilee Symposium on Mine Filling. That symposium, held in August 1973 in Mount Isa, in part to
Jan 1, 1998
-
Three-Dimensional Modelling of Highwall StabilityThis paper describes the application of a three-dimensional finite element modelling tool to help assess the stability of a highwall at a Central Queensland mine following the weakening of its base
Jan 1, 1995
-
Blasting related indices as the key to underground blasting improvements in a challenging rock massBy J Jackson, E Sellers
Blasting related indices were developed to quantify variation in rock strength and structure for each stope, and for each lift of each stope, as part of a Mine to Mill study at an underground open sto
Oct 16, 2017
-
Managing the Margin at Norseman, Western Australia – A Case StudyBy B P. Micke
Central Norseman Gold Corporation was established in 1935 and has been mining on the Norseman field in Western Australia since then. It is Australia’s longest continuously operating gold mining operat
Mar 24, 2014
-
Long-Term Water Management - The Forgotten Legacy of Mine ClosureBy G Byrne
Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i
Nov 26, 2013
-
Improving Blasting by a Team Approach at the Henty Gold MineBy R Wedmaier
Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û
Jan 1, 2001
-
Ore Quality Control for Process OptimisationBy Sehic O. A
Geology can be the root of evil or a source of bliss; there is a choice; to ignore geology is at a mine's peril.Risk can be minimised and profitability maximised by the application of a detailed
Jan 1, 1993
-
Aeration Design for Gold Ore LeachingOxygen is required for the leaching of gold ores in cyanide solutions. The source of this oxygen demand and the effect of dissolved oxygen concentration on the rate of the process are briefly reviewed
Jan 1, 1984
-
The Deep Parts of the Kiirunavaara Apatite-Magnetite Orebody in Kiruna, Northern Sweden and the Impact of Future Mining on the Township of KirunaThe Kiirunavaara apatite-magnetite orebody is about 4 km long and approximately 100 m thick sheet-like body, which lies roughly in a north-south direction and dips from the horizontal plane along its
Jan 1, 2006