Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Selecting Optimal Operating Conditions for Knelson Concentrators

    By G K. N Subasinghe

    Metallurgists operating Knelson Concentrators (KC) often rely on manufacturerÆs recommendations for selecting operating parameters, such as fluidising water flow rate and cycle time. Recent studies ha

    Jan 1, 2006

  • AUSIMM
    Mineral Resource Modelling and Reconciliation in Ultra Deep Underground Gold Mines

    By R C. A Minnitt

    The Witwatersrand Supergroup is host to the world’s largest gold deposits. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are either known, estima

    Aug 22, 2011

  • AUSIMM
    Hydroseparation Concentrates and Automated Precious Metal Searches Used to Characterise Process Products from Selected Mines

    By R Lastra, Y Choi, C Hamilton, P Kondos

    Hydroseparation (http://www.cnt-mc.com) was used to concentrate sized fractions (from <38 ¦m to 150 ¦m) of various ore products ahead of carbon-in-pulp (CIP)-treatment. The resulting size-by-size c

    Jan 1, 2008

  • AUSIMM
    Classification System Efficiency - A Comprehensive Closed-Circuit Grinding Optimisation Metric

    By R E. McIvor, K M. Bartholomew

    Classification system efficiency (CSE) is a simple, powerful metric that provides a comprehensive measure of classification system performance. CSE directly quantifies the amount of coarse solids in t

    Sep 26, 2013

  • AUSIMM
    Improving Extraction Efficiency from Witwatersrand Gold Tailings using Flotation and Ultra-Fine Grinding of Concentrates

    By D Capstick, M B. Ebell

    This paper describes the test work, process design, commissioning and operation of a processing system at the Ergo gold operation that improves the extraction efficiency from gold tailings material. T

    Sep 26, 2013

  • AUSIMM
    Balancing Competing Water Resource Demands and Mining in a Coastal Environment

    The mining of mineral sands in coastal aquifers is often constrained by other land use conflicts and inappropriate controls imposed through a lack of understanding of environmental interactions and

    Jan 1, 1988

  • AUSIMM
    Mill Operators’ conferences – a 40-year retrospective and a vision for the future

    By P D. Munro

    On the occasion of the 14th Mill Operators’ Conference and marking 40 years since the first one was held in Mount Isa in 1978, it is fitting to review the history of the Conference and its development

    Aug 29, 2018

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Setting new standards at Kanmantoo – effective grade control procedures

    By M Reid, H Arbon

    Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an

    Sep 20, 2017

  • AUSIMM
    Signals of Mine Closure - A Strategic Approach for Retrenchment - A Case Study of Porgera Gold Mine, Papua New Guinea

    The issue of retrenchment is a topic of considerable relevance for the Papua New Guinea (PNG) mining, petroleum and gas industries. The unique environments in which Porgera Joint Venture (PJV) and oth

    Jan 1, 2009

  • AUSIMM
    The Waihi Goldfield

    SOME 70 miles south-east of the of Auckland lies the town of Waihi-the centre of the Waihi goldfield, at present the mining pride of New Zealand. That the glory of most mining camps is evanescent form

    Jan 1, 1911

  • AUSIMM
    The Domains Concept – 20 Years on Retrospective, Obstacles and Opportunities for Effective Life-of-Mine Implementation

    By B E. McCarthy

    Red Dome Mine was a highly complex gold copper operation developed over a number of phases between mid-1986 to October 1997. With only three years of production ahead at any time, a proactive practica

    Jul 16, 2014

  • AUSIMM
    Nova-Bollinger reconciliation and risk

    By C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th

    Mar 22, 2022

  • AUSIMM
    Petroleum's Contribution to the Economic Progress of Australia

    Any Australian who knows of the poverty of the early settlers in the first few years following the arrival of Captain Arthur Phillip with his "first fleet" at Botany Bay must feel proud of the progres

    Jan 1, 1962

  • AUSIMM
    Social licence to operate – circular economy

    By L Schürmann, R Kendall

    Social licence to operate is becoming part of a mining company’s DNA in the same way as health and safety. Consequently, mining companies are receiving increasing pressure from their shareholders to e

    Jun 22, 2022

  • AUSIMM
    Coal - Paper No. 12 Coking With A Seven Cubic Foot Capacity Coke Oven

    A new test coke oven of seven cubic foot capacity is described. The oven was designed to simulate conditions in a central section of a battery oven and a special feature is the achievement of unidi

    Jan 1, 1969

  • AUSIMM
    Five years of cover performance monitoring and modelling for a store and release cover at Century Mine

    By T Rohde, P Defferrard

    In 2010 a store and release cover (the cover) was constructed on the south waste rock dump (SWRD) at Century mine. This also included aerial seeding of province native trees and shrub seeds. The purpo

    Jul 23, 2018

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • AUSIMM
    Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design Approach

    The long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther

    Dec 6, 2010

  • AUSIMM
    The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case study

    By D A. Williams, P J. Chapman

    The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus

    Jul 23, 2018