Search Documents

  • ISEE
    Arlanda Link - A New Railway Beneath Arlanda Airport in Stockholm, Sweden, - A Technical Blasting Challenge

    By Donald Jonson

    The Arlanda Link project is for the time being the most interesting project in Sweden, concerning rock and blasting technology. The total amount of rock excavated beneath Arlanda airport comprises 800

    Jan 1, 1997

  • NIOSH
    Arm And Shoulder Muscle Activity Are Greater With Steering Wheel Vs. Seat Mounted Controls - Introduction

    By N. Grosland, G. Kopp, T. Hunstad, D. Wilder, M. Contratto, S. Rahmatalla, T. Xia

    Chronic whole-body vibration exposure, as expected in large construction and mining vehicles, has been associated with neck and back pain and injury.1 While work has been done towards gaining a bette

    Jan 6, 2006

  • SME
    ARMCO Autometrics Particle Size Measurement And Control

    By Albin E. Anderson

    The PSM System has been available to the mining industry for nine years. During this time, many of the more than 160 Systems sold have been put to practical use and have provided the owners a handsome

    Jan 1, 1979

  • DFI
    Army Corps Mega Projects Benefits From Innovative Foundations

    By Dale Berner, Michael O’Sullivan

    "This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr

    Jan 1, 2017

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • SAIMM
    Arnot?s Readiness to Prevent a Pike River Disaster

    By R. Weber

    Methane explosions in underground coal mines are a major concern across the mining industry. After the Pike River disaster, Arnot Coal became even more aware of the explosion risk. To determine whethe

    Jan 1, 2014

  • CIM
    Arntfield Mine

    By E. A. Hart, J. E. Gill

    "The property of Arntfield Mining Corporation, formerly Arntfield Gold Mines, Limited, covers an area of 2,110 acres and lies in Beauchastel township, western Quebec. The Francoeur mine lies to the we

    Jan 1, 1954

  • AIME
    Around the World With a Coal-Mining Engineer

    By John C. Cosgrove

    IT was just five minutes past midnight, on Wednesday, Jan. 5, 1938, that Mrs. Cosgrove and I sailed from New York City. Our trip was to completely circle the globe, to cover over 40,000 miles and stop

    Jan 1, 1939

  • ABM
    Arquitetura Usiminas Para Apoio Ao Desenvolvimento De Sistemas Em Ambiente Java

    By David Bassanelli Sampaio

    Com a crescente demanda por sistemas distribuídos e multiplataformas, houve uma larga proliferação de métodos, linguagens e tecnologias com o objetivo de atender aos mais diversos requisitos desse amb

    Oct 30, 2017

  • CIM
    Arrested Cupellation: A Step Change in Fast in-Line Fire Assay That Enables Gold Analysis at Low Concentration

    By B. Hohenstein, B. McBain, B. de Jong

    "The automated fire assay system (Fast In-line Fire Assay or FIFA) has not found acceptance in the Au mining industry as the lower measurable limit of 0.20 ppm did not allow Au tailings to be measured

    Jan 1, 2017

  • AUSIMM
    ArriumÆs Iron Baron Hematite Beneficiation Plant - A Success from Start to Finish

    By M Bannear, C Stanton

    Since 2008, Arrium has been developing and commissioning a new low-grade hematite ore benefication plant (or OBP) at its Iron Baron mine site.The Iron Baron mine, which was closed in the 1990s, could

    Aug 12, 2013

  • SME
    Arrowhead Tunnels: Assessing Groundwater Control Measures in a Fractured Hard Rock Medium

    By Daniel Tempelis, Tom Freeman, Eric Fordham, John Shamma, Steven Duke

    The Arrowhead Tunnels in southern California are being completed by MWD under stringent groundwater in?ow limits established by the U.S. Forest Service. Pre-excavation grouting, new TBMs and a bolted,

    Jan 1, 2003

  • TMS
    Arsenic ? The Technological Motivator For The Chelopech Copper/Gold Mine

    By Gavin Beer

    The Chelopech Copper/Gold Mine, located in west-central Bulgaria, has been in operation since 1953 producing a low-grade copper/gold concentrate containing up to six percent arsenic by weight. The pe

    Jan 1, 2005

  • AIME
    Arsenic And Antimony

    By K. C. Li

    ARSENIC and antimony are always grouped together by chemists, since they are both members of group V of the periodic table of elements and exhibit a general similarity in the formation of compounds. M

    Jan 1, 1953

  • TMS
    Arsenic And Antimony Capacities In Ni-Cu Mattes And Slags

    By Jonkion M. Font, Ramana G. Reddy

    A thermodynamic model for a priori predictions of arsenic and antimony impurity capacity in Ni-Cu mattes and slags was developed based on the Reddy-Blander (RB) capacity model. The As and Sb capacitie

    Jan 1, 2014

  • SME
    Arsenic and Antimony in Oxidized Concentrate Particles

    By S. Strömberg, A. Jokilaakso

    Two complex copper concentrates and one arsenical nickel concentrate were oxidized in simulated flash smelting conditions using a laminar-flow furnace. The concentrates contained tetrahedrite as Sb-be

    Jan 1, 1998

  • TMS
    Arsenic And Antimony Removal From Copper Concentrates By Digestion With Nahs-Naoh

    By Felipe Daroch, Maria C. Ruiz, Rafael Padilla

    Copper concentrates with high arsenic contents must be pretreated before conventional smelting to prevent environmental pollution with arsenic compounds. In this work, experimental results concerning

    Jan 1, 2015

  • AUSIMM
    Arsenic and the Revegetation of Tailings Dams

    By D Craw

    A glasshouse experiment was set up to investigate arsenic uptake in rye corn grown in different arsenic rich substrates. Sods of material were taken from various locations and planted with rye corn se

    Jan 1, 2007

  • CIM
    Arsenic Challenge and Control in Zijin Copper Smelter

    By X. J. Guo, Q. K. Wang, S. P. Zhong

    With depletion of traditional clean copper reserves and fast expansion of the global copper demand and smelting capacity in the past decade, more and more copper smelters have to treat copper concentr

    Jan 1, 2019

  • CIM
    Arsenic Codeposition during the Initial Phases of Nucleation and Growth on Stainless Steel in Normal Copper Electrowinning Conditions

    By E. Fiset, T. Hennebel, F. Verbruggen, A. Prévoteau, K. Rabaey

    Arsenic (As), bismuth (Bi) and antimony (Sb) are known to affect the quality of copper deposits in copper electrowinning operations. The codeposition of As was previously believed to occur only at cur

    Jan 1, 2019