Search Documents

  • AUSIMM
    The Dugald River Zinc-Lead Deposit, Northwest Queensland, Australia

    By Johnson I. R, Muir M. D

    The Dugald River zinc-lead deposit is located 60 km northwest of Cloncurry. It was discovered prior to 1881, and since 1937, has been the subject of several drilling programmcs which have outlined a r

    Jan 1, 1982

  • AUSIMM
    Reduction of Pelletized Australian Iron Ores

    Hydrogen and carbon monoxide reduction data were obtained on pelletized materials of the type currently being prepared commercially in Australia.Pellets, approximately 1 cm diameter, made from Deepdal

    Jan 1, 1971

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis (57c66dec-079b-41a9-bafc-ab363857a914)

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • NIOSH
    RI 3610 Beneficiation Of Alunite ? Introduction (0bc4c843-f77c-4802-a3e8-7e9cfe26205c)

    By Alton Gabriel

    During the fall of 1940, J. R. Thoenen of the Mining Division, Bureau of Mines, accompanied by the senior author, surveyed the more important domestic alunite deposits. Although the study was designed

    Jan 1, 1942

  • NIOSH
    RI 3610 Beneficiation Of Alunite ? Introduction

    By Alton Gabriel

    During the fall of 1940, J. R. Thoenen of the Mining Division, Bureau of Mines, accompanied by the senior author, surveyed the more important domestic alunite deposits. Although the study was designed

    Jan 1, 1942

  • CIM
    Establishing a vegetative cover on base metal tailings-experience at Buchans, Newfoundland

    By Paul J. O'brien, George N. Neary

    "The base metal mine at Buchans, Newfoundland, has been producing since 1928. For many years, mill tailings were disposed of by dumping into a nearby natural watercourse via which they were transporte

    Jan 1, 1981

  • CIM
    150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebration

    By H. J. McQueen

    ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA

    May 1, 2011

  • NIOSH
    RI 7202 Comparison Of Trip Lights And Reflectors

    By R. H. Oitto

    To determine whether reflectors could substitute for the trip lights referred to in the Federal Mine Safety Code, the Bureau of Mines studied trip safety devices under simulated haulageway conditions.

    Jan 1, 1968

  • AIME
    Minerals Beneficiation - Countercurrent Decantation: When and Why

    By E. J. Roberts

    Hydrometallurgical operations and many processes in the chemical industry require the separation of dissolved material from solids. One of the decisions which has to be made in designing a plant for s

    Jan 1, 1961

  • AUSIMM
    Excellence in Professional Training for the Mining Industry - A Challenge for Tertiary Institutions

    The theme of the conference is "excellence", an epithet of special significance in tertiary education. It appears in the mission statements, goals and plans to achieve them of most, and quite possi

    Jan 1, 1989

  • AUSIMM
    Breakage Characteristics for Ores for Ball Mill Modelling

    By Whiten W. J

    An investigation on the breakage characteristics of closely sized orc samples at different levels of input energy was carried out to determine an appearance function for possible use in ball mill mode

    Jan 1, 1983

  • NIOSH
    Demonstration Of Remote Mine Seal Construction

    By M. A. Trevits, T. A. Gray, L. M. Crayne, P. Glogowski

    Mine seals can he remotely constructed in underground coal mines through vertical boreholes when direct access to a fire is impossible or considered to he too dangerous. This method has great merit be

  • CIM
    Data integration for information technology infrastructure in mining

    By S. Dessureault, J. Porter, M. Woodhall

    Information and communication technology (ICT) is seen as a key source of future productivity improvements in mines. The information technology infrastructure (ITI) necessary to achieve these producti

    Jan 1, 2004

  • SME
    Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking

    By Bhaskar B. Thapa

    The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet

    Jan 1, 2008

  • IOM3
    High-temperature mine climate simulation model for predicting the effect of mine fire

    By P. Mousset-Jones, G. Danko

    Variations of the temperature and steam/moisture content of the air with distance and time are modelled for a single airway. The input for the simulation is an air temperature that varies with time, t

    May 1, 1991

  • AUSIMM
    Presidential Address (f9446de2-f07b-4880-8e2a-dc5f91667a36)

    Mr. BRADFORD said :-On assuming this chair, which has been occupied by so many gentlemen of conspicuous ability; my first words must be an expression of the gratitude I feel for the honour you have do

    Jan 1, 1926

  • AUSIMM
    Acid Processes for Alumina Extraction

    The C.S.I.R.O. acid alumina process employs the essential steps of digestion, hydrolysis and calcination to produce pure alumina from ores too high in silica or too low in grade for the Bayer process.

    Jan 1, 1964

  • AUSIMM
    Ventilating the 1,480 Ft Level Drive at the South Mine, Broken Hill

    The problem of ventilating an advancing drive which finally reached 5,550 ft from the fresh air base in rock with virgin temperature of 83°F was solved economically by the use of two 15 h.p. elec

    Jan 1, 1965

  • DFI
    Site Solutions For The Pisa Tower Remediation - 1 - Introduction

    By Paolo Heiniger

    The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter

    Jan 1, 2000