Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e
-
Rock Socketed Drilled Shafts in Electrical SubstationsBy Brock Wallis, Steve Davidow
The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses
Jan 1, 2018
-
Scale effect on the geometrical and mechanical properties of rock jointsBy N. Fardin, O. Stephansson, L. Jing
A pair of silicon rubber replicas of size 250 mm by 250 mm, from a natural rock joint, was used to produce several high strength concrete fracture replicas of different sizes, from 50 mm by 50 mm to 2
Jan 1, 2003
-
Evaluation Of The NEPA Process For Estimating Water Quality Impacts At Hardrock Mine SitesBy Kimberley MacHardy, Ann Maest, Greg Lawson, James Kuipers
Although water quality predictions are often made in Environmental Impact Statements (EIS's) as part of the National Environmental Policy Act (NEPA), comparisons between predicted and actual wate
Jan 1, 2005
-
Capital Cost Estimating for Mineral Processing PlantsBy R. J. Balfour, T. L. Papucciyan
"INTRODUCTIONCapital Cost considerations are basic to feasibility in the achievement of success for Mineral Processing Projects as much as or more than in many other industries. Capital cost is an imp
Jan 1, 1972
-
Wireless Access To Live Data From Mining Operations - Anywhere & AnytimeBy R. Heersink, C. H. Wells
Innovations in communications and real-time information systems are providing industry opportunities to improve profitability. Real-time operating data is collected from equipment across a site or ev
Jan 1, 2002
-
Simtars New Mobile Gas Laboratory For Emergency ResponseBy D. Brady
The need for onsite gas monitoring during, or following, a major incident at an underground coal mine has long been recognised. Recommendations from inquiries following Queensland mine disasters have
Jan 1, 2012
-
Numerical modelling for the design of shortwall powered support units on the 2 seam at Matla CoalBy J. W. Latilla, J. J. van Wijk
In late 1997 a request was received to assist with determining the powered support unit (shield) load capacities for the planned 2 seam short wall. This project had a number of aspects which made it a
Jan 1, 2003
-
Heavy Minerals Activity On The Rise WorldwideBy William R. Yernberg
The Fifth International Heavy Minerals Conference (HMC) was held Oct. 16-19, 2005, at the Marriott Sawgrass Resort in Ponte Vedra, FL. With SME as sponsor, the 2005 conference marked the first time th
Jan 1, 2006
-
Port Authority Of Alleghany County North Shore Connector Project Tunnels And Station Shell Case History Contracts 003 And 006By Paul Zick
The Port Authority of Allegheny County North Shore Connector (NSC) Project involves TBM excavation of twin 690 m (2,240 lf) precast segment lined light rail tunnels through soil and rock under the All
-
IC 8656 Comparative Porphyry Copper Mining And Processing Costs-Alaska And ArizonaBy R. G. Bottge
To better understand those factors which increase mining costs in Alaska, a Bureau of Mines study was conducted to compare the estimated costs of operating a 100,000-tpd open pit copper mine located o
Jan 1, 1974
-
IC 8266 Review And Evaluation Of Silver-Production Techniques (5d2c3b2e-2b2b-4ecf-854c-456c5dbcdfba)By C. H. Schack
Extractive metallurgy techniques currently employed to recover silver from primary ores and secondary scrap were reviewed and evaluated to identify and delineate metallurgical problems whose resolutio
Jan 1, 1965
-
The Application of Electronic Detonators to Improve Blast Vibration Predictions at Limestone QuarriesBy R. Farnfield, W. Birch
Arguably, some of the most restrictive statutory blast vibration requirements attached to mineral extraction operations can be found in the United Kingdom. Such limitations are, as a rule for the UK,
Jan 1, 2006
-
Mine-Wide Monitoring Applications In Ground Control ResearchBy David Conover
Technological advancements in electronic sensors and mine-wide monitoring systems have improved remote monitoring and analysis of underground mining information. The effective use of . these systems f
Jan 1, 1990
-
Hyperbolic P-Y Model For Static And Cyclic Lateral Loading Derived From Full-Scale Lateral Load Testing In Cemented Loess SoilsBy Steven Dapp
A new hyperbolic model for generating P-Y curves is developed for use in lateral analyses of cemented soils (a ?C-F? soil with both cohesive intercept and friction angle), and includes degradation of
Jan 1, 2011
-
Ecosystem Restoration Within The Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South DakotaBy J. Jonas, J. M. Harrington, K. Wangerud, S. D. Fundingsland, J. G. Harrington
EPA NRMRL Mine Waste Technology Program and Region VIII Superfund office are jointly conducting an in-situ technology demonstration at the Anchor Hill Pit Lake, Gilt Edge Mine Superfund site. The goal
Jan 1, 2004
-
Increasing Availability through Advanced Gearless Drive TechnologyBy C. Dirscherl, M. Combes
"Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy
Jan 1, 2014
-
Effects of DA as a Grinding Aid on Selective Grinding of Low-Grade BauxiteEffects of DA as a Grinding Aid on Selective Grinding of Low-Grade Bauxite Effects of DA (a copolymer of acrylic acid and acrylamide) as a grinding aid on selective grinding of low-grade bauxite were
Sep 13, 2010
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case StudyBy M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
Quantity Estimation of Concentrate in DamsAt the treatment plant of the Broken Hill South Limited, Broken Hill, the zinc concentrates, with water, are pumped out to a more or less level area, and stored in dams to dry by drainage and evaporat
Jan 1, 1925