Search Documents

  • CIM
    The Colomac Project

    By V. N. Bryant

    "1.0 SYNOPSISThe Colomac property, located 137 miles by air northwest of Yellowknife in Canada's NWT. will recover gold from 10,000 tons per day of open pit ore.The decision to proceed with the projec

    Jan 1, 1990

  • SME
    Managing Impacts of Deep-Sea Resource Exploitation - The Midas Project

    By Philip Weaver

    The MIDAS project is funded by the European Commission (DG Research) and began on the 1st November 2013. The project will investigate the environmental impact of deep-sea mineral and energy extraction

    Sep 1, 2014

  • SME
    Collaborative Strategic Research Initiatives: Their Benefits and Best Practice Approaches for Establishing the Same

    By Daniel Brutto

    "Environmental considerations are a key driver within marine mining consenting processes across different national and international legislative regimes and are critical in shaping the global public p

    Sep 1, 2014

  • SME-ICGCM
    Development of a mechanistic model for prediction of maximum subsidence and subsidence profile due to longwall mining

    By Richard D. Begley

    This paper summarizes the development of a mechanistic model to predict longwall mining induced surface subsidence. The model was originally developed from data acquired from a recent field study cond

    Jan 1, 1989

  • SAIMM
    Dynamic Support Rationale and Systems

    By U. Singh, E. T. Brown, J. Coxon

    The rapid fracturing and deformation that occurs around excavations during rock bursts demand that support and reinforcement systems have both deformability and damping capabilities. The energy deman

    Jan 1, 2003

  • AUSIMM
    Spontaneous Combustion and Simulation of Mine Fires and Their Effects on Mine Ventilation Systems

    By H W. Wu, D Humphreys

    The structure of a comprehensive research project into mine fires study applying the Ventgraph mine fire simulation software, preplanning of escape scenarios and general interaction with rescue respon

    Jan 1, 2005

  • AUSIMM
    Nyrstar Port Pirie Redevelopment

    By B Kretschmer, G Bartel, B de Villiers, W Watt

    "The Nyrstar Port Pirie Smelter, located on the eastern shore of the Upper Spencer Gulf in South Australia 230km north of Adelaide, began operation in 1889 to process lead concentrate from the Broken

    Sep 7, 2015

  • ISEE
    Shotplus - Blast Designs in a Windows Environment

    By Brad H. A Brown, J Paul Tidman

    To design a blast, one must give consideration to safety, economics, geometry, geology, production needs, and a variety of other requirements. To compare designs requires the time to develop alternati

    Jan 1, 1997

  • NIOSH
    Variation In The Vibration Emission Of Rotary Hammer Drills Under Simulated Work-Site Conditions - Introduction

    By Neil J. Mansfield

    Tool manufacturers are required to provide declarations of vibration emission values in order to sell their tools within Europe. To ensure that users can compare results obtained from different manufa

    Jan 6, 2006

  • SME
    New Chances From Old Shafts - Risk Management In Abandoned Mine Sites In Germany ? Introduction

    By J. Kretschmann

    Around the world, mining has been done for thousands of years for the benefit of humankind. The winning process in mining operations ends with the depletion of the deposit or its closure if the operat

    Jan 1, 2012

  • AUSIMM
    Pit-Lake Water Quality in Coal Deposits, Southland, New Zealand

    By D Craw, J Pope, B Peake

    Southland contains over 70 per cent of New ZealandÆs recoverable coal resources, and an investigation into the potential effects of coal mining on SouthlandÆs water resources is therefore of interest.

    Jan 1, 2006

  • CIM
    Pilot Scale Testing of a Lead-Zinc Ore Aljustrel Project

    By Jeffiey B. Austin, Maurice Tagami

    "The ores of the Iberian Pynte Belt are typically massive sulphide ores with very fine grained mineral textures. EuroZinc Mining Corporation is currently evaluating one of the massive sulphide deposit

    Jan 1, 2000

  • AUSIMM
    Energy Efficient Ball Mill Circuit - Equipment Sizing Considerations

    By W Valery, A Jankovic

    The ball mill in closed circuit with hydrocyclones is an industry standard, and well known methodologies exist for equipment sizing, selection and design. However, the potential to improve the capacit

    Jul 15, 2013

  • DFI
    Micropile Foundations For Support Of New Bridge Structures Over Abandoned Mine

    By Timothy J. Myers

    Expansion and the economic growth in the southwestern region of Missouri necessitated the expansion of State Route 249 and the construction of a new interchange to provide service to the Joplin, Misso

    Jan 1, 2009

  • AIME
  • CIM
    Restauration Du Site Minier Poirier (Joutel) - Expériences Acquises Et Suivi Des Travaux

    By Richard Maurice

    RÉSUMÉ La restauration du site minier Poirier, à Joutel s?est déroulée entre 1998 et 2001. Le principal élément des travaux a été la restauration du parc à résidus et des zones d?épanchement qui tot

    Nov 1, 2002

  • AUSIMM
    A Simulation Approach for the Comparison of In-Pit Crushing and Conveying and Truck-Shovel Mining Methods

    In-pit crushing and conveying (IPCC) is being increasingly considered as an alternative to traditional truck-shovel mining methods. The move towards IPCC is driven by a number of factors including the

    Dec 6, 2010

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • NIOSH
    BOM Bureau of Mines Publications and Articles, 1992-1993

    By Compiled by Staff

    "INTRODUCTIONThe U.S. Bureau of Mines (USBM) was established in the public interest to conclude inquiries and scientific and technologic investigations on mining and the preparation, treatment, and ut

    Jan 1, 1994

  • SAIMM
    Slope modification of open pit wall using a genetic algorithm?case study: southern wall of the 6th Golbini Jajarmbauxite mine - Synopsis

    By K. Goshtasbi

    In this paper a genetic algorithm is used in a heavily jointed rock mass in order to investigate the critical circular slip surface and modification of slope surface. This method was applied to the so

    Jan 1, 2008