Search Documents

  • NIOSH
    OFR-79-80 Improved Spontaneous Combustion Protection For Underground Metal Mines

    By Ralph B. Stevens

    The objective of this 20-month program was to define the relationships between mine ventilation, temperature, humidity, ore properties, material's used in mine operations, etc., and the spontaneo

    Jan 1, 1979

  • NIOSH
    OFR-42-87 Effects Of Stockoile Storage On Topsoil Characteristics In Arid Climate

    By Lawrence J. Froisland

    To aid in minimizing adverse environmental impacts of mining and mineral processing, the Bureau of Mines studied changes in soil characteristics in topsoil stockpiled during mining operations. Topsoil

    Jan 1, 1987

  • DFI
    Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2003

  • AUSIMM
    Nature Conservation and the Minerals Industry

    This paper examines the reform of mining legislation over recent years, the establishment of new Crown land management agencies, and the role of the Crown and environmental groups in nature conservati

    Jan 1, 1995

  • SAIMM
    The Youga Gold Project - A West African Project Financing Case Study (98dba44f-d023-4a1b-aa5b-2a4dc1105351)

    By J. Forwood

    The Youga gold mine in Burkina Faso, West Africa, is scheduled to produce first gold in the third quarter of calendar 2007. The project is expected to produce 540 000 oz of gold over 6.5 years, from

    Jan 1, 2007

  • AUSIMM
    The Dissolution of Gold in Cyanide Solutions-An Electrochemical Study

    By Koch D. F A

    An electrochemical study of the dissolution of gold in aerated cyanide solution shows that the dissolution rate is determined by the nature of the surface. A passive film (probably a basic cyanide) fo

    Jan 1, 1964

  • NIOSH
    RI 7387 Seismic Effects Associated With An Underwater Explosive Research Facility

    By Joseph L. Condon

    Fifteen shots of three explosives with charge weights of 0.52, 1.1, 3.1, and 5.1 kilograms were fired in a pond to study the seismic effects of detonating explosives in water. Shock pressures and bubb

    Jan 1, 1970

  • SME
    Design and Startup of Cortez Gold Mine’s Pipeline Mill

    By Randy N. Powell

    The Pipeline gold ore body was discovered in Lander County, NV in March 1991. Construction of the new mine and mill did not start until early March 1996. The $289-million project was placed on a fas

    Jan 1, 1999

  • SME
    Improved Methodology For Contact Angle Measurements On Coal (Heterogeneous) Surfaces

    By J. Drelich, M. Pawlik

    An improved experimental procedure to measure contact angle has been consolidated with coal surface preparation involving polishing with abrasive paper, alumina powder, and a cloth, followed by ultras

    Jan 1, 1999

  • NIOSH
    OFR-11-78 Rapid Monitoring Of Coal Refuse Embankments

    By Lawrence H. Roth

    Past failures of coal refuse embankments have resulted in more intensified efforts in inspections of coal refuse sites. Inspections, however, are mainly qualitative and time consuming. In August 1975

    Jan 1, 1977

  • DFI
    Securing Rail Infrastructure in Romania

    By Andreas Brandner

    "At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors

    Jan 1, 2017

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - Springer

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • AUSIMM
    The Calc-silicate-hosted Watershed Tungsten Deposit, Far North Queensland, Australia

    By J Williamson, M Griessmann

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Watershed tungsten deposit is located in the Hodgkinson Province of north Queensland, A

    Mar 18, 2015

  • CIM
    In-track assessment of premium and intermediate grade rail steels

    By K. J. Griffin, G. W. Rosval

    "In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi

    Jan 1, 1988

  • NIOSH
    IC 8869 Critical And Strategic Minerals In Alaska - Cobalt, The Platinum-Group Metals, And Chromite

    By James C. Barker

    A uniquely mineralized area extends from northwestern Canada through Alaska into eastern Siberia. Some of the metals found there are relatively rare in the conterminous United Stales. Among these are

    Jan 1, 1981

  • SAIMM
    Optimization of shuttle car utilization atan underground coal mine

    By P. R. Segopolo

    "The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc

    Jan 1, 2015

  • DFI
    Downtown Seattle Transit Project - International District Station

    By Richard K. Sandaas

    Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th

    Jan 1, 1990

  • AUSIMM
    The Development of Processes for the Treatment of Crude Ore, Accumulated Dumps of Tailing and Slime at Broken Hill, New South Wales

    The following paper on the development of processes for the treatment of crude ore, accumulated dumps of tailing and slime at Broken Hill, has been prepared by a committee of the Broken Hill Branch of

    Jan 1, 1930

  • NIOSH
    IC 9498 - Proceedings Of The International Workshop On Rock Mass Classification In Underground Mining

    Rock mass classification is widely used throughout the underground mining industry—in both coal and hard-rock mines. It is used in all stages of the mining process, from site characterization to produ

    Jan 5, 2007