Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Using GIS To Identify High Value Areas In Large Coal Resources
By J. Kern, T. F. Torries
Identifying high value areas of unmined coal when large quantities of coal are available relative to annual markets is difficult because of the uncertainty of when the coal is to be mined. A GIS based
Jan 1, 1999
-
Hybrid finite-/discrete-element modelling of progressive failure in massive rock slopes
By H. Willenberg, J. S. Coggan
ABSTRACT: Although individually both continuum and discontinuum numerical analyses provide useful means to analyze rock slope stability problems, complex failures typically involve mechanisms related
Jan 1, 2003
-
Talc Problems Encountered in the Mining and Milling of Kanichee Nickel-Copper Ore
By F. M. Makarinsky
"SynopsisThe Kanichee open pit mine and milling complex is situated approximately four air miles north-west of Ternagami, Northern Ontario, in Strathy Township. Mining and milling production commenced
Jan 1, 1975
-
Manila Aqueduct (Philippines) — The Construction of the Umiray-Angat Tunnel Project — A Success of Organisation and Technology Against a Unique Combination of the Most Adverse Conditions Ever Encountered in Tunneling
By Remo Grandori
The Umiray Angat 13,2 km long tunnel in Philippines have been bored through extremely variable and difficult ground conditions including a number of special events. In particular the following adve
Jan 1, 2001
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case Study
By James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Recovery of Tin from Tinhouse Scruff Metal
A modified liquation technique was developed for recovering tin from tinhouse scruff metal or hardhead containing about 10 per cent iron and 15 per cent occluded flux, palm oil, and moisture. This was
Jan 1, 1969
-
Tailings Disposal at Kidd Creek Mines Ltd.
By T. J. Yeomans
"The Kidd Creek metallurgical site is situated twenty-six kilometres east of Timmins, Ontario. The site consists of a 4.5 niillion tonne per year concentrator, a 127,000 tonne per year electrolytic zi
Jan 1, 1986
-
OFR-61-74 Research On The Transmission Of Electromagnetic Signals Between Mine Workings And The Surface
By Richard G. Geyer
One aspect of a program to improve the chances of survival following coal mine disasters is the development of a communications sys tem which will allow surviving miners to make their circumstances kn
Jan 1, 1974
-
Washington D.C. Annual Meeting - February, 1882
Jan 1, 1882
-
Continuous Training – Insurance for Sustainable Operation
By Richard Phiri, Mike Milupi, Jackson Kapobe, Anton Lemmer, Charles Mazala
Sustainability of plant operations in a rapidly changing mining environment requires a well-trained workforce to ensure smooth running of operations. To ensure availability of trained labor, Mopani Co
Jan 1, 2019
-
An Integration Of Long-Term Mine Planning, Tailings And Reclamation Plans
Oil sands processing generates huge volumes of slurry, known as tailings, that is being stored in tailings ponds. The volume of produced tailings is a very important factor in oil sands surface mine p
Feb 27, 2013
-
Lithospheric Footprints of Giant Orogenic Gold Systems
By R J. Goldfarb, A B. Christie, D I. Groves
Small orogenic gold deposits have the same deposit-scale geological and geochemical features as those that characterise giant orogenic gold systems (>16 Moz Au). Therefore, a broader-scale approach
Jan 1, 2005
-
The Development And Application Of A HCFeMn Furnace Simulation Model For Assmang Ltd
By B. R. Broekman, K. J. R. Ford
Over the last decade significant development and use has been made of a simulation model that describes the HCFeMn smelting operations in Assmang Ltd. This spreadsheet based, semi-empirical, predictiv
Jan 1, 2004
-
Quality Control For Installation Of Augered Cast-In-Place Piles
By Francis J. Arland
The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh
Jan 1, 1997
-
Nickel-Past and Present
By Robert C. Stanley
The prominence of her mineral resources makes Canada a most fitting place in which to hold the Second Empire Mining and Metallurgical Congress, since in all probability the Dominion has more diversifi
Jan 1, 1927
-
Footwall Stability and Final Pit Design in the PT. Adaro Coal Mine, Indonesia
By Takashi Sasaoka
The PT. Adaro Coal Mine targeted in this research is located in South Kalimantan, Indonesia. The coal production of this mine is increasing year, with about 35 M tons of coal produced in 2006. Th
Jan 1, 2008
-
Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues
By Alain E. Holeyman
After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi
Jan 1, 2006
-
Green Recycling of EEE: Special and Precious Metal Recovery from EEE
By C. E. M. Meskers
Electronic and Electric Equipment contains a range of components made of a wide variation of metals, plastics and other substances. Up to 60 elements can be found in complex electronic equipment: base
Jan 1, 2009
-
Challenges & Improvements in Milling at Omai Gold Mines
By Gregg Vickell
"High tonnage, low grade gold mines such as Omai’s afford economies of scale that are unto their own insufficient to sustain profitability at today’s depressed gold price. Complimenting profitability
Jan 1, 1999
-
Hydrologic Assessment Of Waste Rock Stockpiles: A Case Study From Ajo Mine, Arizona
By A. L. Williamson, G. Savci
Hydrologic assessments of existing and proposed waste rock stockpiles (WRS) are typically required for application of operating and closure permits at mine sites. The results of these assessments can
Jan 1, 2002