Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Study Of The Impact Of Mining Under Massive Roof At Datong Coal Mines, China (7e96e5f6-0b09-4bad-866d-2ffcd02d33be)By Song Yong Jin
The Jurassic coals at Datong are characterised by their strong, massive sandstone and conglomerate roofs which fail suddenly over large areas, crushing pillars and creating destructive windblasts, col
Jan 1, 1992
-
Gateroad Support in the Czech and Polish Coal Mining Industry - Present State and Future DevelopmentsBy Stanislaw Prusek
The present state of Czech and Polish coal mining industry is presented at the beginning of the article. This paper will inform the reader of the general data concerning hard coal reserves? number of
Jan 1, 2011
-
Eclipse System Bolting In The Illinois BasinBy Alan Campoli
Approximately 100 million fully grouted rebar roof bolts are installed each year in the United States, 80% are B-Series (5/8 inch fully grouted rebar in a one-inch borehole). The lesser used more expe
Jan 1, 2004
-
Why Dead Load Suspension Design for Roadway Roof Support Is Fundamentally Flawed Within a Pro?Active Strata Management SystemBy Russell C. Frith
Risk-based roadway roof support design is now a critical part of the Australian Coal Industry. Safe and efficient mining demands that roof support be tailored to the prevailing geotechnical conditions
Jan 1, 2011
-
Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois MineBy Kenny D. Basnett
An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with
Jan 1, 2011
-
Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)By Winton J. Gale
The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o
Jan 1, 1992
-
A New Combination Friction-Suspension Support System Scott Cable SlingsBy James J. Scott
Over the past two years research, development ad field tests have been conducted on a new product called the "Scott Cable Sling". This work resulted in the awarding of U.S. Patent No. 4265571 on May 5
Jan 1, 1981
-
Integrity Factor Approach to Assess the Stability of Room-and-Pillar MinesBy Kanaan Hanna
The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied
Jan 1, 1988
-
Coal Mine Primary Support Selection: Tension Versus Non Tensioned Roof Bolt SystemsBy Kot Unrug
The selection of tensioned versus non-tensioned roof bolts, for primary coal mine roof support, has been debated for well over 25 years. The wide spread use of fully grouted rebar marked the beginning
Jan 1, 2004
-
Investigation And Analyses Of Sudden Outbursts Of Gas During Driving Of Mine Roadways (7ec61323-5f2c-44cc-b7ed-dc20f9515d9b)By Uros Bajzelj
When driving mine roadways in the vicinity of tectonic disturbances and fault zones, sudden outbursts of gas, along with ejections of fine coal, occur. Substantial dynamic changes occur around the roa
Jan 1, 1992
-
Electromagnetic Seam Wave Mapping Of Roof Rock Conditions Across A Longwall PanelBy Larry Stolarczyk
The mining industry would benefit greatly by imaging geologic conditions well in advance of mining. In layered deposits such as coal, trona, quartz, and potash, natural waveguides form and enable elec
Jan 1, 1999
-
lnterpanel Barriers for Deep Western U.S. Longwall MiningBy Leo Gilbride
Western U.S. longwall operators face increasing challenges with optimizing ground control and productivity as mines reach greater depths and coal bursting hazards increase. Some western U.S. mines, ma
Jan 1, 2004
-
Topography and Coal Seam Initial Stress Estimation: a Sensitivity StudyBy Jeffrey K. Whyatt
Estimation of the initial vertical stress carried in a coal seam is an important first step in virtually all methods of evaluating the required size of pillars in coal mines. Such estimates are a triv
Jan 1, 2011
-
Time-Dependent Analysis Of Underground Opening StabilityBy Changshou Sun
Excessive deformation occurred in the underground openings of Jinchuan Nickel Mine, the largest nonferrous underground mine in China. Developed in weak rock formations at great depth, the underground
Jan 1, 1999
-
Intersection Stability and Tensioned BoltingBy Yunqing Zhang
Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt
Jan 1, 2003
-
Design and Field Testing of a Mobile Roof Support for Retreat Mining,By Robert R. Thompson
Retreat pillar mining is highly productive but dangerous. The primary danger during pillar removal is premature caving of the roof. Because the safety of the miners is dependent on successfully contro
Jan 1, 1986
-
Application of the Coal Mining Roof Rating System in South African CollieriesThis paper describes the experiences with the application of the Coal Mining Roof Rating (CMRR) System to South African strata conditions. Roof classification studies using the CMRR system were undert
Jan 1, 2001
-
International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall PanelsBy J. D. Cole
In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C
Jan 1, 1990
-
A Retrospective Assessment of Ground Control Research and Applications in the Coal IndustryBy Daniel W. H. Su
This paper presents a retrospective assessment of ground control research and its successful application by CONSOL Energy over the past 25 years. Recognizing the need to improve the understanding of c
Jan 1, 2011
-
Geological Sensing - The Key To Increasing Miner SafetyBy J. R. M. Hill
The U.S. Bureau of Mines is involved in research to improve geological sensing (or geo-sensing) techniques. This paper presents results from field trials of two research projects concerned with new te
Jan 1, 1992