Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Geotechnical Exploration for a Lake Mead Intake

    By Richard F. Coon

    Six potential locations along the west shore of Lake Mead were evaluated to site anew water intake pumping station for the SNWA. The evaluations were based upon geotechnical exploration results and c

    Jan 1, 1997

  • SME
    Discussion - Mineral resource objectives of the Continental Scientific Drilling Committee’s dedicated drill holes and add-on science to solve mineral deposit problems

    By C. Meyer, J. J. Eidel

    C. W. Hunt I wish to register strong disagreement with the choices of drilling sites chosen by the Continental Scientific Drilling Committee, while endorsing the stated objectives. Of special signifi

    Jan 6, 1987

  • SME
    Foamed Grout Controls Underground Coal-Mine Fire

    By Joseph J. Feiler

    Fires in underground coal mines are persistent problems anywhere in the world that coal is mined. Coal fires pose safety and health hazards in the form of mine subsidence, loss of energy reserves, de

    Jan 1, 2000

  • SME
    Diversity of Spontaneous Vegetation on Post-Industrial Sites - Importance in Reclamation Process

    By G. Wozniak, R. Rostanski, H. Pfanz, G. Aschan, E. Sierka

    "Industrial wasteland is a typical element of the landscape of all the industrialised regions in Europe. There are many examples from Poland as well as from other European countries that post-industri

    Jan 1, 2005

  • SME
    TBM Tunneling At The Ashlu Hydropower Project, Squamish, BC

    By Serge Moalli

    The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4

  • SME
    Innovative Mining Systems For Low-Cost Production In Very Thick Alluvial Deposits

    By G. Goellner

    The thick alluvial sand and gravel deposits along the base of the San Gabriel mountain range in Southern California area have been mined for construction aggregates for over 100 years. Encroachment of

    Jan 1, 2004

  • SME
    Evaluation Of Materials And Technologies Used In Mine Shafts Reclamation In Former Uranium Ore Mines In Eastern Germany - Development Of A Technical Guideline

    By F. Schreiter

    The Ore Mountains in Germany have a history of more than 850 years of underground mining activity. This has created a situation where thousands of old mine shafts and adits are due for rehabilitation.

    Feb 27, 2013

  • SME
    Microtunnels vs. EPB Risk-Based Selection

    By Michelle L. Ramos

    INTRODUCTION The Ballard Siphon was built in 1935 and consists of two 91.4 cm (36-inch) diameter wood-stave pipes. These pipes convey sewer flowsunder the Ship Canal from northwest Seattle and the Ba

  • SME
    Floodplain Aggregate Mining In Western Oregon (2ca5f679-fd59-4011-96c0-926073fa7dc9)

    By E. F. Schnitzer, S. R. Mamoyac, P. J. Wampler

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion and, in several cases, breaches between the gravel pit an

    Jan 1, 1999

  • SME
    Floodplain Aggregate Mining In Western Oregon (b3a583d5-3e7a-4dd2-84c0-16936e808842)

    By E. F. Schnitzer, P. J. Wampler

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion and, in several cases, breaches between the gravel pit an

    Jan 1, 1999

  • SME
    Assessment Of Potential Groundwater Flow Within Sub-Permafrost Groundwater At Red Dog Mine, Alaska

    By J. Kulas, J. Weaver, K. Hagley

    An assessment of potential groundwater movement beneath the tailing impoundment at the Red Dog Mine was performed, and has indicated a unique aquifer situation within sub-permafrost groundwater at the

    Jan 1, 2002

  • SME
    Deterministic And Stochastic Water Balance Modeling Of The Gilt Edge Mine Superfund Site, South Dakota

    By K. Wangerud, B. S. Caruso

    A water balance model with deterministic and stochastic components was developed and used for the Gilt Edge Mine Superfund Site, South Dakota, to evaluate risks of contaminated runoff discharging to s

    Jan 1, 2002

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    Reclamation And Remediation Of The Abandoned Belle Eldridge Mine Near Deadwood, South Dakota

    By A. D. Davis, C. J. Webb, C. S. Johnson, J. L. Porter

    The abandoned Belle Eldridge Mine near Deadwood, South Dakota, is on land controlled by the U.S. Bureau of Land Management (BLM) property. The mine produced primarily lead and zinc during the first h

    Jan 1, 2002

  • SME
    Financing Mining Projects KfW IPEX-Bank’s Approach in Assessing Credit Risks Relating to Questions of Sustainability

    By P. Klaus

    "KfW IPEX-Bank is the commercial arm of KfW Bankengruppe, responsible for international project and export finance.KfW was one of the first banks in Germany to promulgate environmental guidelines for

    Jan 1, 2005

  • SME
    Analysis of Fall-Related Imminent Danger Orders in the Metal/Nonmetal Mining Sector Mining, Metallurgy and Exploration

    By Mahiyar Nasarwanji, Jonathan K. Hrica, Jonisha P. Pollard, Lydia M. Kocher, Brianna M. Eiter

    Within the metal/nonmetal mining sector, fall-related incidents account for a large proportion of fatal and non-fatal injuries. However, the events and contributing factors leading up to these inciden

  • SME
    Use Of Ripping To Alleviate Excessive Compaction On Reclaimed Surface Mined Land (f1616ada-9235-4f95-bdf4-a09302103e5e)

    By J. C. Yingling, R. J. Sweigard, P. W. Conrad, J. M. Ringe, D. H. Graves

    Much of the land reclaimed since enactment of the 1977 Surface Mining Control and Reclamation Act is over-compacted. Research has shown that excessive compaction in replaced growing media is detrimen

    Jan 1, 2002

  • SME
    The Search For Asbestos Within The Peter Mitchell Taconite Iron Ore Mine, Near Babbitt, Minnesota

    By Malcolm Ross

    Asbestos crystallizes within rock formations undergoing intense deformation characterized by folding, faulting, shearing, and dilation. Some of these conditions have prevailed during formation of the

    Jan 1, 2007

  • SME
    Pneumatic Backfilling - A Method For Controlling Abandoned Mine Subsidence

    By Steve Jones

    Minor subsidence damage to the Burgettstown Junior-Senior High School building and grounds near Burgettstown, Washington County, Pennsylvania, prompted an investigation of the site in early 1985 by th

    Jan 1, 1986

  • SME
    The mineralogy of marine Fe-Mn oxides and consequences for the extraction of metals

    By Thomas Kuhn, Carsten Ruehlemann, Christina Heller, Anna Wegorzewski

    The commercial extraction of metals from manganese nodules on an industrial scale requires more than 50% of the investment necessary to realize manganese nodule mining. This is mainly due to the fact

    Sep 1, 2014