Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Effect of Dolomitic Lime on Magnetic Taconite PelletsBy John C. Nigro
Bench scale and pilot plant research was conducted using dolomites (CaO,MgO) lime as the basic additive in the preparation of self-fluxed pellets from a typical magnetic taconite concentrate (5.57 S_2
Jan 1, 1972
-
Heap Leach Modeling – A Review of Approaches to Metal Production ForecastingBy J. O. Marsden, M. M. Botz
"Heap leaching is responsible for approximately 21 percent — 3.9 million metric tonnes — of copper production and 9 percent — 270 metric tonnes or 8.7 million ounces — of gold production worldwide. Gi
Jan 1, 2017
-
Using Computerized Mine-Wide Monitoring For Ground ControlThe last decade has seen the use of powerful computerized Mine-Wide Monitoring (MWM) systems for detecting hazardous conditions in underground coal mines. Recently, the U.S. Bureau of Mines and Jim Wa
Jan 1, 1994
-
Oversize Reduction Project At The Iron Ore Company Of Canada (ME)The Iron Ore Company of Canada (IOC) is the largest manufacturer of iron ore pellets in Canada and its customer base covers North American, European and Asian steel producers. The company operates a m
Jan 1, 2011
-
Reverse Osmosis System For Longwall Coal Mining - IntroductionBy D. Bradbury
Sufco coal mine, a subsidiary of Arch Western Bituminous Group, recently purchased a reverse osmosis (RO) system. The systems intent was to remove impurities in the water being mixed with the hydraul
Jan 1, 2011
-
Advance Exploration by Stochastic Inversion of Tunnel Seismic Waves - A Numerical StudyBy Tamara Nestorovic, Luan T. Nguyen
"With the aim to mitigate excavation risks and reduce the costs caused by tunnel boring machine (TBM) stoppage when tunneling under uncertain soil conditions, prediction ahead of the tunnel face has b
Jan 1, 2016
-
Turbulent models for pollutant transport in openpit mines under stable boundary layer - SME Transactions 2015By R. V. Ramani, K. V. Raj, S. Bandopadhyay
The air flow problems in openpit mines are complex. Computational fluid dynamics (CFD) models can provide detailed information regarding air flow pattern, velocity distribution, temperature, and pollu
Jan 1, 2015
-
Continuous Miners With Integral Roof BoltersBy Tedd B. Bodimer
Why complicate an already complex machine such as a continuous miner by adding roof drills? Immediate permanent roof support is an immediate thought of the mining engineer just as elimination of frequ
Jan 1, 1981
-
A Review Of Reverse Circulation Air Lift Methods For Big Hole DrillingBy James H. Allen
The air lift method of pumping water is discussed. A review of several large diameter hole drilling projects that used reverse circulation air lift techniques is presented. Proposals are made for re
Jan 1, 1976
-
A Scale Model Experimental Study for Estimating the Productivity of Bulk Push Dozer Operations in Hard Rock Mining - Mining, Metallurgy & Exploration (2022)By MEHMET KIZIL, PETER KNIGHTS, ROYAL REA
A 1/20 scale experimental dozer push test rig was designed and constructed to quantify the expected production rates (loose cubic metres per hour) for dozers operating in hard rock bulk push applicati
Nov 23, 2021
-
Mining In British Columbia; 2011 Was An Active Year For The ProvinceBy Jim Britton
Sustained elevated metal and coal prices in 2011 continued to drive mining projects across British Columbia. The province is the top producer of copper, exporter of coal and the only producer of molyb
Jan 1, 2012
-
Mills For Remote SitesBy Christopher J. Farrow
This paper describes the grinding circuits installed at two remote sites in northern Canada. One is Cominco's Polaris Project at Little Cornwallis Island; a barge-mounted lead/zinc concentrator.
Jan 1, 1983
-
29. Golden Grove Discovery Case Histories ? IntroductionThe Golden Grove Project area is located 220 km (137 miles) east of Geraldton in Western Australia (Fig. 1). The project is a joint venture involving Amax Exploration (Australia) Inc. (Amax), Electrol
Jan 1, 1991
-
Bypass Tunnel Shafts—Shotcrete Lining - RETC2023By Paul Madsen, Bade Sozer, Thomas Hennings, Eileen Test
The Rondout Bypass Tunnel in New York has two access shafts. The upper sections of the shafts are lined with steel pipe to resist a substantial net internal water head . Initial design included a ¾-in
Jun 13, 2023
-
The Geology and Mining Operations at Pacific Asbestos Corporation Copperopolis, CaliforniaBy G. W. Leney
Introduction and Historical Background The office and mining operations of Pacific Asbestos Corporation are located near Copperopolis, California in the foothills of the Sierras about fifty miles eas
Jan 1, 1972
-
The Evolution Of Coke Plant Design - Today - TomorrowBy Peter Riba
Up until ten years ago the industry had arrived at a relatively conventional, and consistent design of coke ovens. Through the years the designers and builders were not being heavily taxed to come up
Jan 1, 1980
-
The Development Of Coal-Water Slurries As Boiler FuelBy C. B. Henderson
The development of slurries of coal and water as a boiler fuel replacing No. 6 fuel oil has been actively pursued at the Atlantic Research Corporation since 1976. Funding for this effort has been prov
Jan 1, 1982
-
Construction Phase Services for Australian and North American SEM Tunneling - NAT2024By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim
Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s
Jun 23, 2024
-
Stabilizing Flowing Sands on the Millwoods Double Barrel Replacement Project - Uniting Academia and the “Real World” from Field to Lab to FieldBy James J. Brady, Kenneth L. Faught, Chadi El Mohtar, Chaoshi Hu
"During construction of a 9.5-ft. diameter sanitary sewer tunnel, the City of Edmonton encountered a large pocket of flowing sand that flooded their TBM and caused significant surface subsidence, stop
Jan 1, 2016
-
Rock Mechanics Study Of A Longwall PanelBy Lewis V. Wade
This paper summarizes the results of the rock mechanics monitoring program performed as part of Old Ben Coal Company's longwall coal mining demonstration project conducted in cooperation with the
Jan 1, 1977