    Blast Vibration Monitoring & Calibration in the 21st Century

    By W. J. Birch, R. Farnfield

    Nuisance caused by perceived high vibration levels as a result of blasting on quarries and opencast coal mine is now the number one environmental concern of residents living adjacent to such operation

    Jan 1, 2014

  • ISEE
    How to Control Blast Vibrations in an Urban

    By R E. Langston, S M. Gazioglu

    A preconstruction inventory program was conducted to determine the existing conditions of residential, non-residential and all other structures within 2,000 feet of the blasting limits for a highway e

    Jan 1, 1980

  • ISEE
    Low-Rise Building Damage from Low-Amplitude Ground Motions

    By Roger E. Scholl

    Data on off-site low-rise building damage from underground nuclear testing at the Nevada Test Site (NTS) of the United States Atomic Energy Commission (AEC) [The AEC has been called the United States

    Jan 1, 1976

  • ISEE
    Predicting Tunnel Overbreak

    By P. R. Mohanty, Kaushik Dey

    Blast-induced tunnel overbreak prediction in the past has been based on peak particle velocity measured far from the blast site with necessary extrapolation. This has often resulted in suggesting high

    Jan 1, 2004

  • ISEE
    Measuring Blast Fragmentation by Analyzing Shovel Bucket Contents

    By Hairong Zeng, Shahram Tafazoli, Edmond Chow

    Blast fragmentation is one of the main parameters for optimizing mineral processing, but reliable data is difficult to acquire, resulting in unpredictable performance and efficiency. Crusher and grind

    Jan 1, 2011

  • ISEE
    Prototype of MEMS-based Accelerometric Network for Continuous Monitoring of Blasting Efficiency and Seismic Velocities

    By M. Szumny, P. Mertuszka, K. Fuławka

    Mining-induced seismicity is one of the adverse side effects of mining with the use of explosives at great depths. Disturbance of the primary stress state by the development of the network of excavati

    Jan 1, 2024

  • ISEE
    Journal: How to Improve Safety, Create Value, and Maximize Profit in the ‘New Economy’

    By William Hissem

    The topics in the title line of this article are desirable and applicable to entire industries that exist outside the realm of the ISEE’s readership. But the issues I will discuss herein are specific

    Jan 1, 2014

  • ISEE
    Constructing Laboratory Caverns in Hard Rock Under High Stress

    By Christopher Laughton

    A new underground laboratory is under construction at the recently closed Homestake Gold Mine, Lead South Dakota, United States of America. The Deep Underground Science and Engineering Laboratory is d

    Jan 1, 2011

  • ISEE
    Controlled Drilling and Blasting at Yucca Mountain - Design Implementation, Confirmation

    By Edward Fitch

    The DOE is evaluating Yucca Mountain, Nevada as a potential site for disposal of high level nuclear waste. Yucca Mountain is located approximately 160 km northwest of Las Vegas on the western edge of

    Jan 1, 2000

  • ISEE
    The Thermal Basis for Explosive Decomposition with Heat due to External heating or reactive ground

    By Alastair Torrance, Gary Cavanough

    Over the past two years a research project has been performed on reactive and hot ground. A key finding is that host materials including carbonates and coal are inhibitors to the reaction of sulphide

    Jan 21, 2025

  • ISEE
    A Study on the Attenuation Characteristics of Electronic Blasting Vibrations for Different Types Blast Designs According to Korean Open-Pit Blasting Standards for Proposing the Blast Vibration Equation

    By Park Yun-Seok, Jung Seung-Won, Hwang Nam-Sun, Song Jin-hyuk, Kim Young-ho

    This study proposes a new blasting vibration estimation formula that reflects the vibration reduction characteristics of electronic detonators, which are not considered in the current MOLIT blasting v

    Jan 21, 2025

  • ISEE
    Signature Hole Method for Ground Vibration and Airblast in Mine Blasting; Convolution or Superposition?

    By B T. Lusk, John J. Silva Castro

    The signature hole method uses a convolution operation to predict the waveform of a production blast based on the record of a waveform produced by a single blast hole. Convolution is a mathematical op

    Jan 1, 2014

  • ISEE
    Identification & traceability of civil explosives in Europe

    By Ashley Haslett

    A European Directive on Identification & Traceability of explosives came into effect on the 4th of April 2008. This directive is intended to establish a harmonised system for the unique identification

    Jan 1, 2010

  • ISEE
    Blasting in the Lower Shaft Station of Atomic Energy of Canada Limited's Underground Research Laboratory

    By P A. Lang, J G. Ayotte, R W. Humphries

    Atomic Energy of Canada Limited (AECL) has the responsibility for research, and development of technologies, for the safe and permanent disposal of Canada's nuclear fuel wastes. As part of this compre

    Jan 1, 1986

  • ISEE
    Innovative Online Technology Enabling Optimization in Blasting Operations

    By Jim Peterson, Ricardo Freire, Mason Biernat

    Variable nature of rock and face conditions, varying execution and changing nature of blasting are making ongoing optimization challenging. Intelligent planning and on-going analytics are required to

    Jan 1, 2019

  • ISEE
    Underground Remote Firing System

    By Tom Paynter

    In an underground mining environment, the primary method of firing a blast is using a combination of an electric detonator and a detonating cord to initiate the Nonelectric detonators. This method has

    Jan 1, 2017

  • ISEE
    Blast Modeling for Facility Security Management

    By Shonn K. McNeill, Joshua Micah Hoffman

    Security engineering is similar to other forms of engineering – the design is guided by the loads, materials, and desired function. For facility design, the load is the threat. Facilities that are de

    Jan 1, 2019

  • ISEE
    Comparison of Traditional Signature Hole Technique and Monte Carlo Approach

    By Braden Lusk

    Vibrations as a result of blasting practices in mining engineering are a complex phenomenon controlled by many variables. Mine blast vibration modeling and prediction is becoming more important as a c

    Jan 1, 2013

  • ISEE
    "Journal: 100 Years / A TREATISE ON ORE AND STONE MINING by Sir Clement Le Neve FosterCharles Griffin & Company, London 6th edition, 1910"

    By Robert Hopler

    BH Note: This price list stresses the point that the number six strength cap should be used with all high explosives. It’s interesting that duPont chose to continue to supply the lesser strength caps

    Jan 1, 2011

  • ISEE
    A Rational Method for Predicting Damage to Historical Structures Subjected to Blasting Vibrations

    By Kenneth Medearis

    The accurate prediction of possible damage to historic structures subjected to blasting-related ground motions is not infrequently the dominant factor in whether or not a mining or quarrying operation

    Jan 1, 1993