Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Trends in Drilling and Blasting (8aa24a46-8326-4148-8007-63f421ba2d8b)By Alan Bauer
During the past several years, the trend to large-diameter blastholes in both open pits and underground mines along with the continuing developments in slurried explosives and delay systems has kept t
Jan 1, 1978
-
Journal: Safety Talk / Highwall Safety from a Blaster’s PerspectiveBy W. Reisz
The fear of heights is a natural defense against performing a dangerous and unnatural act such as standing on the edge of a hundred foot wall. Yet through familiarity, a casual attitude often exists.
Jan 1, 2009
-
Rock Fragmentation in a Crusher Simulated through Calibrated Impact LoadsBy S. Huang, K. Xia
The down-stream size reduction processes such as crushing, grinding and milling, represent major expenditure of energy. The present study is aimed at linking the fragmentation characteristics of the r
Jan 1, 2015
-
Improving Productivity in Pillar Blasting – HZL, Sindesar Khurd MineBy Deepankar Das, Gulshan Kumar Sadhwani, Jyoti Prakash Sahoo
Sindesar Khurd Mine (SKM), the largest underground mine in the Hindustan Zinc Limited portfolio, is located approximately 60 kilometers (37 miles) north of Udaipur. In the 2018 financial year SKM achi
Jan 1, 2019
-
Are Electronic Initiation Systems the Unique Answer to Solve Blasting Issues?By Jesus A. Pascual de Blas
After 30 years of development and introduction, electronic initiation systems are now well established in blasting applications, both mining, quarrying and civil works. In terms of blast technology, i
Jan 1, 2019
-
Blast Modification to Improve Bench Width Reliability at the EKATI Fox PitBy D Anonby
The Fox Pit at EKATI Diamond Mine is designed with 11 m wide benches excavated using a double benching technique leaving 30 m high faces. Blasting tests were conducted to increase the percentage of be
Jan 1, 2007
-
A Reanalysis of Fragmentation Data from the Red Dog MineBy Finn Ouchterlony
"Recently detailed fragmentation data from blasts fired with electronic delay detonators (EDDs) in the Red Dog mine in Alaska were presented. They include a comparison with pyrotechnic detonators ford
Jan 1, 2012
-
Tigerwin - a Windows PC Code from Computing Explosives Performance and Thermodynamic PropertiesBy Per-Anders Persson
TIGERWIN, now on CD, is a user-friendly personal computer code (running under Windows) which determines the detonation and expansion state of an explosive from its known chemical composition. TIGERWIN
Jan 1, 2000
-
Wight Pit High Grade Wall SlashBy Art Frye, Lee Pratt, Gaichang Zhao, Greg Newman
This paper will discuss the Wight Pit wall slash at the Mount Polley open-pit copper-gold mine that scavenged a high grade block of ore from two double-benches of the pit wall. The Wight Pit orebody,
Jan 1, 2011
-
Blasting Techniques for Pit Wall Control at Inco Limited's Thompson Open PitBy Nan Lee, Stephen H. Chung, Peter Lienberger
INCO Limited's Thompson Open Pit has researched extensively into improved blasting techniques towards increased productivity as well as optimum pit wall protection. Blasting with excessive amounts of
Jan 1, 1992
-
Low Density Bulk Emulsion Applied in Perimeter Holes in Underground Development Heading BlastsBy Anne Caroline Costacurta Polli, Jose Rojas Cáceres, Roberto Mahler de Morais, Thais Costa Silva
The technology and the knowledge about the behavior of explosives and detonation accessories allowed to create new products for different situations by the restrictions imposed by the market. In a Bra
Jan 21, 2025
-
Modeling of Explosive Loading of Sand with a Coupled Euler-Lagrange CodeBy Leslie C. Taylor, Anthony L. Kee
Computational modeling of explosively loaded saturated sand on a suspended plate is an inherently complex problem. In this study a computational method is used to predict the dynamic pressure load/imp
Jan 1, 2005
-
Dilution and Ore-Loss Optimization in Underground MinesBy Sami Kara, Marsel Nabium
This paper provides an overview of the solution applied in underground Silver mine in Russia. The paper reviews the dilution problem throughout the entire mining process, and provides a rational appro
Feb 1, 2020
-
Emulsion Breakers for Waste ExplosivesBy Maja Franjic, Ian Tolliday, Chris Collins, James Wiltshire
Ammonium Nitrate Emulsions (ANE) are a large segment of the explosives market for the mining industry. These emulsions are generally designed to be very stable but when breakdown does occur, removal o
Jan 21, 2025
-
Dilution and Ore-Loss Optimization in Underground MinesBy Sami Kara, Marsel Nabium
As a mining project is developed from conceptual to production phases, there exists a variety of uncertainties and difficulties that affect the operation’s designs and economic values. A notable desig
-
Influence of Fragmentation on the Loading and Haulage Operations: A Stochastic ApproachBy Francisco Leite, Tomi Kouvonen, Bianca Saraiva, Vinicius Miranda, Auã Oliveira
One of the main challenges facing mining engineers is to draw up a plan that can be implemented in a timely manner, taking into account the operational variability of the mine’s production processes.
Feb 6, 2023
-
Review of Mine to Mill Approach for Underground MiningBy Lauren Shields
This paper discusses the application of current fragmentation models for underground blasting, establishes a conceptual fragmentation model for underground operations, and discusses the applicability
Feb 1, 2020
-
Precision Presplitting: Explosive Load Variations with SpacingBy Calvin Konya, Anthony Konya
Presplitting is a form of blasting that when executed properly will create a smooth wall that will minimize secondary conditioning. In recent years, presplitting has become a popular technique to be u
Jan 1, 2017
-
Trim Blasting Designs in the Morenci MineBy Karl Christopherson, Vanessa de Viterbo
Trim blasting is an integral part of the mining processes at the Morenci Mine, a Freeport-McMoRan Copper & Gold Inc. property. Trim blasting near high-walls or Finals blasting requires a tighter distr
Jan 1, 2011
-
Summer Internship Project at an Underground Gold MineBy Tristan Worsey
This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo
Jan 1, 2010