  • DFI
    Rectification Measures And Restoration Of Distressed Pump Foundations

    By V K. Panwar, Sampat Raj

    At a Fertilizer plant located in the southern part of India, 74 numbers of pump foundations have shown non-uniform settlements causing the tilting of pump foundations under self-weight primarily due t

    Nov 1, 2022

  • DFI
    Design for Installation of Suction Piles in Sand Deposits for Mooring of Floating Offshore Structures

    By Chul Soo Park, Juhyung Lee, Duhyun Baek

    "In this study the preliminary design of suction pile as the supporting system of the concrete floating structures was performed at the offshore pilot project area in Korea. The suction pile of the fl

    Jan 1, 2017

  • DFI
    Foundation Stabilization of the Morris Island Lighthouse

    "The Morris Island Lighthouse (MIL) is located between the jetties leading to the Charleston Harbor and Folly Beach, S.C. The present structure is the third lighthouse to occupy this location. The fir

    Jan 1, 2017

  • DFI
    Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense Sands

    By Nabil F. Ismael, Khalid Farraj

    "The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa

    Jan 1, 2017

  • DFI
    Analysis of Water Leakage in Downstream Dam Toe of Komani Dam

    By Arjan Jovani, Arjan Beqiraj, Përparim Alikaj, Altin Karriqi

    "Koman dam is one of most important high dams in Drin River Cascade. Safety of these dam is very important not only in power production but also in social and environmental aspects connected with vita

    Jan 1, 2016

  • DFI
    High Capacity Hollow Core Bar Piles

    By Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel

    "A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry

    Jan 1, 2017

  • DFI
    Pile Inspector's Guide To Hammers ? Introduction

    The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding

    Jan 1, 1995

  • DFI
    A Review Low Strain Integrity Testing Practices In India And Complexities Involved In Evaluation Of Test Results

    By RavikiranVaidya, Vishal Dhamecha

    Low Strain Pile Integrity Testing has been used in India since 1990’s and several have tried to demonstrate the utility and benefits of this method. However, use of this technology was limited till 19

    Sep 1, 2022

  • DFI
    Introducing VCE's: Support Of Excavation Without Tie-Backs

    By Rick Deschamps

    A reoccurring problem with support of excavations in urban areas involves the placement of external support components like anchors or nails in right-a-ways, subway and utility setbacks, in areas occu

    Jan 1, 2008

  • DFI
    2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure Interaction

    By Yahia M. Al-Smadi

    Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t

    Jan 1, 2010

  • DFI
    Foundations Of Self Drilling Micropiles In 4G And 5G Network Telecom Masts In India

    By Annika Gram, Teddy Johansson, Lutfi Ay

    Micropiles transfer tension or compression forces as well as cyclic loads into the ground via skin friction. The Self Drilling Micropiles (SDM) can be utilized for permanent applications. The hollow b

    Nov 1, 2022

  • DFI
    Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)

    By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa

    "Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low

    Jan 1, 2015

  • DFI
    Performance Of Open And Close-End Screw Piles In Bearing Layer

    By Faisal Shalzad, Adnan Anwar Malik, Tadashi Maejima, Jiro Kuwano

    Single helix screw piles carry most of the structural load through end-bearing if the helix is embedded in the dense bearing layer. The tip condition of the central shaft of the screw pile can be clos

    Oct 1, 2022

  • DFI
    Field Test of Electroosmosis with the Injection of Saline Solution of Taipei Silty Clay

    By Chang-Yu Ou, Shao-Chi Chien, Hsuan-Hsiang Chang

    "A field test was performed to investigate the applicability of electroosmosis with the injection of saline solution of Taipei silty clay. The calcium chloride solution and sodium silicate solution we

    Jan 1, 2005

  • DFI
    New Orleans Levee Improvement Project: An OPA Contender

    By Filippo Leoni, Wesley Schmutzler

    "The LPV-111 East Back Levee Improvement Project lies along the Gulf Intracoastal Waterway (GIWW) in Orleans Parish of New Orleans, La., and is an essential component of the New Orleans Hurricane Prot

    Jan 1, 2013

  • DFI
    Very Deep Foundations in Rock: The New Challenge in the Foundation Industry.

    By Paolo Cavalcoli, Federico Pagliacci

    "As opposed to the static functional recovery of existing structures, the construction of infrastructures in an urban environment, when combined with complex geological situations, often involves buil

    Jan 1, 2015

  • DFI
    Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected Applications

    By Michael E. Ameel

    The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co

    Jan 1, 2010

  • DFI
    Alameda Corridor-East: San Gabriel Trench Project

    By David Peterson, Terry Tucker, Rafael Serrano

    "The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin

    Jan 1, 2017

  • DFI
    Comparison of Load Test Results between ACIP Piles Installed in Sand in Pre-Drilled Holes versus Conventional Installation

    By Tracy Brettmann, Shailendra Endley, Jason Leary, Shashank Valluru

    "Augered Cast-in-Place (ACIP) piles have long been used for deep foundation support in sands due to their high capacity and speed of installation. Very little information exists on the effects on capa

    Jan 1, 2017

  • DFI
    Philadelphia Dock Story—Pile Challenges at Delaware River

    By Craig H. Olson

    "A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at

    Jan 1, 2008