Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Behavior of Settlement Reducing Piles under Static and Seismic Loadings

    By Marwa Nabil, Alaa A. Ata

    "Recent developments in the analysis of piled rafts has incorporated the load sharing of the raft and the piles to support the superstructure. In the piled-raft system, piles are cast monolithically w

    Jan 1, 2016

  • DFI
    Inspector?s Guide To Augered Cast-In-Place Piles - Second Edition - Title ? Table Of Contents - 1.0 General

    This manual is limited to Augered Cast-in-Place (ACIP) piles constructed using a hollow stem continuous flight auger. 1.1SCOPE AND LIMITATIONS The intent of this manual is to provide guidelines

    Jan 1, 2010

  • DFI
    Inspector?s Guide to Augered Cast-in-Place Piles

    By Matthew E. Meyer

    The intent of this manual is to provide guidelines for observing and documenting the installation of ACIP piles. The manual may also serve as a guide for the training of inspection personnel. It is ex

    Jan 1, 2010

  • DFI
    Stability Assessment of a Deadman Anchor Pile Close to the Bulkhead Wall

    By WenJun Dong

    This paper presents the stability assessment of the steel pipe piles that are used to support a deadman beam to anchor an adjacent bulkhead wall. Finite element analyses are performed to assess the st

    Sep 8, 2021

  • DFI
    Automated Pile Load Test Monitoring

    By Joel L. Volterra

    Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site

    Jan 1, 2008

  • DFI
    Cyclic Degradation on Wind Turbine Foundations in Cohesive Soils

    By Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim

    Wind turbines are subjected to complex form of cyclic loadings with variable amplitudes and frequencies. The cyclic loading and the accumulation of plastic strains with the number of cycles will resu

    Sep 8, 2021

  • DFI
    Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl Tests

    By Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD

    The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval

    Oct 1, 2022

  • DFI
    Augered Pile World Record Depth within a Soil Mix Basement

    By Andres M. Baquerizo, Jeremiah J. Filjones, Nicholas Feldt

    The Estates at Acqualina located in Sunny Isles Beach, FL, is comprised of two, ocean-front, 50-story, luxury towers with podiums and villas. With city regulations now requesting that above-grade floo

    Jan 1, 2019

  • DFI
    Case History – San Francisco 49ers NFL Stadium Pile Foundations Santa Clara, California

    By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi

    "The stadium development consists of construction of a 68,500-seat, open-air NFL football stadium for the San Francisco 49ers. The main structure will consist of a 7-story above grade steel structure

    Jan 1, 2015

  • DFI
    Verification Of Drilled Shaft Resistance By The Post Grouting Method

    By Suthan Pooranampillai

    Verification of drilled shaft resistance is primarily obtained through the use of different load testing methods. Procedures utilized include conventional top down static loading, the Osterberg load c

    Jan 1, 2010

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    DFI Collaborates on Risk-Based Panels

    By Derrick Dasenbrock

    Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co

    Sep 1, 2023

  • DFI
    Trump International Is OPA Winner

    "Standing 92 stories high and just over 1,362 ft tall, Chicago’s Trump International Hotel and Tower is perfectly positioned at the center of one of the world’s most impressive skylines.The Tower serv

    Jan 1, 2009

  • DFI
    Case Study: Feather River West Levee Program Cutoff Walls

    By Kyle R. Lackner, Jared P. Williams

    "The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat

    Jan 1, 2016

  • DFI
    Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge

    By Brian J. Olson, Kevin Haiar

    Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re

    Sep 8, 2021

  • DFI
    Limiting Damage To Historic Structures In New York City, 1981 To Present

    By Andrew J. Ciancia

    The construction of the Pennsylvania Station in Manhattan, the Beaux-Arts masterpiece, was completed in 1910. In financial ruin, the Pennsylvania Railroad Company sold the station in the 1960?s and t

    Jan 1, 2008

  • DFI
    Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale Effects

    By Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami

    "Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha

    Jan 1, 2015

  • DFI
    Numerical Analysis in Assisting Crane Pad Design and Underground Utilities Evaluation

    By Yazen Khasawneh, Yao Zhang

    Upgrading and maintenance programs were proposed at a power generating plant in Indiana. To perform construction activities associated with the proposed upgrading and maintenance, a LR11350 crawler cr

    Jan 1, 2019

  • DFI
  • DFI
    State of the Art Ground Improvement Technique for a Residential Complex: Case Study

    By Madan Kumar Annam, Hari Krishna Y, I. V. Anirudhan

    "For completion of projects in time with positive results, improvements of productivity and effective project management procedures have become extremely important. This paper discusses a milestone pr

    Jan 1, 2015