Instrumented Load Tests On Closed-And Open-Ended Piles
By Junhwan Lee
Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p
Jan 1, 2003
-
A Case Study Supporting The Need For A Rational Method For Design And Installation Of Vibratory Driven Piles
By Franklin M. Grynkewicz
The subject of bearing pile performance installed by vibratory hammers has been a matter of increasing study and continued controversy. A recent case study from a major bridge replacement project is d
Jan 1, 1991
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation
By Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
An Unusual Permanent Shoring Job
By Gordon Demetrick
3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi
Jan 1, 1987
-
Bearing Capacity Of Pile By Curve-Fitting Method ? Synopsis
By Z. Q. Zhou
It is the first worke in design of pile foundation to determine the carring capacity of single pile, and a static loading on site is considered to be the lost derect and reliable way. All values P and
Jan 1, 2010
-
Rock Socketed Drilled Shafts in Electrical Substations
By Brock Wallis, Steve Davidow
The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses
Jan 1, 2018
-
Hyperbolic P-Y Model For Static And Cyclic Lateral Loading Derived From Full-Scale Lateral Load Testing In Cemented Loess Soils
By Steven Dapp
A new hyperbolic model for generating P-Y curves is developed for use in lateral analyses of cemented soils (a ?C-F? soil with both cohesive intercept and friction angle), and includes degradation of
Jan 1, 2011
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case Study
By M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
Piling Design and Construction Codes and Standards for Buildings A United States Perspective
By Rudolph P. Frizzi
"Abstract Pile design for building structures in the United States is typically performed by: 1) investigating and assigning engineering parameters to the respective ground bearing materials, 2) calcu
Jan 1, 2014
-
Static Uplift and Lateral Load Testing of Piles for a New Power Plant
By José L. M. Clemente, John R. Davie
"Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi
Jan 1, 2014
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results
By Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West Yorkshire
By J. A. Elliot
Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou
Jan 1, 1989
-
Performance Of Three Unique Shoring Sections For Block 75 Shoring
By Chris Sammon
The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet
Jan 1, 2010
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results
By Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
Cut-Off Walls For Diamond Mining In The Arctic
By Wolfgang G. Brunner
A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to
Jan 1, 2003
-
Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of Iraq
By H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Continuous Grouting In Embedding Of Sheet Piles
By Jouko L. Lehtonen
Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m
Jan 1, 2006
-
Lateral Load Response Of Two Identical Bridge Column-Foundation Systems In Warm And Cold Conditions
By Muhannad T. Suleiman
Temperatures below freezing significantly enhance the soil shear strength and stiffness and to a lesser extent increase the compressive strength of concrete as well as the yield and ultimate strength
Jan 1, 2006
-
Underpinning The Existing No. 1 Subway Line At The World Trade Center
By Richard Crockford
The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne
Jan 1, 2008
-
I-470 Mine Remediation
By Sheryl D. Gallagher
The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the