Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Dynamic Pile Testing - The Caltrans Results - Dynamic Pile Testing - Who Needs It?

    By G. G. Goble

    Dynamic pile testing is now over 20 years old as a routinely applied tool for evaluating driven pile installation. The first test on a cast-in-place pile was performed more that 15 years ago. The rese

    Jan 1, 1993

  • DFI
    A Case Study on the Effects of Using Surcharge Fill as a Complement to Ground Improvement with Dry Deep Mixing

    By Stefan Larsson, Sebastian Adevik, Sadek Baker, Razvan Ignat

    "Abstract Uncertain strength, deformation and flow properties in dry deep mixing columns often lead to conservative choices concerning design values where the design is regularly complemented with a s

    Jan 1, 2014

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • DFI
    Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NY

    By Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht

    The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou

    Jan 1, 2018

  • DFI
    Repair Of Deep Foundations - Summary

    By Dennis W. Boehm

    The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current

    Jan 1, 1999

  • DFI
    Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, Massachusetts

    By Harry Schnabel

    A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi

    Jan 1, 2011

  • DFI
    Micropile Foundations For Support Of New Bridge Structures Over Abandoned Mine

    By Timothy J. Myers

    Expansion and the economic growth in the southwestern region of Missouri necessitated the expansion of State Route 249 and the construction of a new interchange to provide service to the Joplin, Misso

    Jan 1, 2009

  • DFI
    Confinement Of Two Contaminated Sites In A Petrochemical Plant; Case History

    By Raffaella Granata

    The paper deals with the remediation of two areas formerly utilized for the disposal of hazardous wastes in a petrochemical plant. The works, designed on the basis of the criteria of maximum safety an

    Jan 1, 2006

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Railroad Bridge Approach Embankment Settlement Mitigation

    By Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery

    Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate

    Jan 1, 2018

  • DFI
    Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota Valley

    By Roger A. Archabal, Omar A. Conte, Gustavo Langoni

    This international case study focuses on the rigorous geotechnical interaction and results of a soil improvement program utilized to mitigate consolidation settlements of over 1.5 m [5.0 ft]. The extr

    Jan 1, 2018

  • DFI
    Statnamic Loading Tests On Different Pile Types - 1.0 Introduction

    By Patrick Bermingham

    This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile

    Jan 1, 1993

  • DFI
    Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction

    By E. E. De Beer

    This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform

    Jan 1, 1987

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • DFI
    Fundex - Deep Foundation Institute Tensile Pile Test Seminar - September 9 & 10, 1993 - Introduction

    After the Loma Prieta Earthquake, which caused major damage to viaducts in the Bay Area, the California Department of Transportation set up a test programme for foundation piles. Funderingstechnieken

    Jan 1, 1993

  • DFI
    Design Of Deep Foundations Over Shallow Mine Workings

    By Tianfei Liao

    Extensive site investigations revealed that abandoned shallow mine workings exist under a site planned for construction of a major new facility. Since the mine voids were susceptible to collapse, they

    Jan 1, 2009

  • DFI
    Once Again, Engineering And Contractor Tenacity Overcome Tough Geology

    By John E. Lens

    How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran

    Jan 1, 2006

  • DFI
    Non-Destructive Testing Of Drilled Shafts - Title ? Table Of Contents - Introduction And Overview

    By Edmund J. Cardoza

    WELCOME TO THE DEEP FOUNDATIONS INSTITUTE 26TH ANNUAL CONFERENCE AND WELCOME ESPECIALLY TO THIS SEMINAR ON NON-DESTRUCTIVE TESTING OF DRILLED SHAFTS, PRESENTED BY MEMBERS OF THE DFI DRILLED SHAFT COMM

    Jan 1, 2001

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018