Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Use of Mine Sequencing Controlled Through Numerical Modelling and Instrumentation to Destress a Highly Burst Prone Sill Pillar - Draft

    In order to maintain a production rate of 6,000 tonnes per day from underground at the Williams Operating Corporation, two independent mining areas were required which created a long narrow sill pilla

    Apr 1, 2005

  • CIM
  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • CIM
    Capturing Energy from Ventilation Air Methane

    By D. L. Cluff

    Ventilation Air Methane (VAM) is a high volume low concentration methane source. The capture or use of methane from VAM is challenging, which results in the routine discharge of methane into the atmos

    Aug 1, 2013

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Subaqueous Deposition of Acid Generating Tailings into an Acidic Lake Environment: Pilot Column Test Results

    By Linda C. M. Elliot, Liangxue Liu

    "The deposition of tailings under water is considered to be one of the most environmentally promising and potentially cost effective methods to reduce or eliminate acid mine drainage from tailings. On

    Jan 1, 1997

  • CIM
    Reducing Miners? Exposure to Diesel Particulate Matter Using Real-time Measurement

    By Michel G. Grenier

    Compliance with Diesel Particulate Matter (DPM) exposure regulation is currently performed using timeweighted average (TWA) sampling on underground mine workers. These samples are collected in the spa

    May 1, 2010

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • CIM
    Changes in grade, volume and contained gold during the mining life-cycle of gold placer deposits

    By J. D. Bliss, G. J. Orris, W. O. Menzie

    "Analysis of gold placer data from gold placers throughout the world suggests that gold grades and volumes cannot be used to distinguish between most types of gold placers. Only the alluvial plain and

    Jan 1, 1987

  • CIM
    Advantages of Tailing Disposal by Thickened Discharge

    By E. I. Robinsky

    "This paper describes a new, proven approach for tailing disposal. Not only is the disclosed system less damaging to the environment, it is also less costly to operate, to close down and maintain in p

    Jan 1, 1976

  • CIM
    The Use of Computational Fluid Dynamics and Discrete Element Modeling to Understand the Effect of Cell Size and Inflow Rate on Flotation Bank Retention Time Distribution and Mechanism Performance

    By Richard Peaker, Jens Lichter, Alexander V. Potapov

    "The recent combination of Computational Fluid Dynamics (CFD) and Discrete Element Modeling (DEM) can provide considerable insight into the performance of flotation cells. One area of interest from a

    Jan 1, 2007

  • CIM
    Optimizing Performance at the David Bell Mine Concentrator

    By K. Meyer

    "The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den

    Jan 1, 1991

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • CIM
    Promoting Energy Efficiency Stuidies during Mineral Processing Plant Design

    By A. Tylczak, C. Shook, A. Doogan-Smith, S. Loif, B. Hilscher, P. Nayak

    "This paper discusses how to effectively conduct energy efficiency studies during the design of new mineral processing plants and plant expansions. Energy management studies for new plants are ideally

    Jan 1, 2016

  • CIM
    Meadowbank Mine Process Plant Throughput Increase

    By J. Allaire, P. N. Muteb

    The Meadowbank mine is operated by Agnico-Eagle Mines Ltd. and is located in the Kivalliq District of Nunavut in northern Canada. The process plant operates presently at a throughput of 11,500 tpd wit

    Jan 1, 2013

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • CIM
    The Boss Mountain molybdenum deposit, central British Columbia

    By G. Lee, E. T. C. Spooner

    "Molybdenum mineralization at Boss Mountain is hosted by the Triassic Takomkane quartz monzodiorite batholith and is associated with a Cretaceous monzogranite stock. Ore has been mined from a sheeted

    Jan 1, 1995

  • CIM
    Diamond Project Development ? An Holistic Approach

    By Jarek Jakubec

    The new euphoria in diamond exploration brings with it a need to understand the challenges that new projects can face in different stages of the development and risks that the commercial outcomes from

    May 1, 2006