Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    King Mine No. 3 Shaft and Equipment

    By J. G. Ross

    IN the paper entitled Block Caving at the King Mine (1), which was presented at the Annual General Meeting held in April, 1934, at Quebec, it was pointed out that, owing to certain conditions and fina

    Jan 1, 1939

  • CIM
    Les Mines INMET Division Troilus - Objet: Extension de la vie des godets des excavatrices DEMAG.

    Les Mines Inmet ? La Division Troilus exploite une mine d?or à ciel ouvert depuis 1996 et produit un concentré de cuivre. La Division Troilus est localisée à 175 KM au nord de la ville de Chibougama

    Feb 1, 2008

  • CIM
    Ultrafine and fine grinding using the METSO Stirred Media Detritor (SMD)

    By Graham Davey

    "Ultrafine grinding of minerals has been in wide spread use in the industrial mineral field for over 30 years. Within the last 10 years the metalliferous industry has shown interest in the ability to

    Jan 1, 2002

  • CIM
    Principal Components Analysis of ToF-SIMS Data: Application to Mineral Recognition, Surface Reaction and Separation by Flotation

    By Brian Hart, Roger St. C. Smart, James Francis, Mark Biesinger

    "There are a number of challenges involved with the surface analyses of different mineral phases from process streams in a flotation facility. The first of course is to collect samples that are repres

    Jan 1, 2007

  • CIM
    Water Control Technology Innovative Solutions for Underground Mines

    By Peter White

    Mine Planning Shaft Collar Shaft Sinking Raises Ramp Underground Water Storage

    May 1, 2009

  • CIM
    Regional Geological Setting of Gold Deposits, Eastern Red Lake Area, Northwestern Ontario

    By James Pirie

    "The major Archean gold deposits in the Red Lake greenstone belt, which have produced over 374 million grams of gold since 1930, occur near the top of the lower komatiitic to tholeiitic mafic to ultra

    Jan 1, 1982

  • CIM
    Contribution à l'étude du gonflement des boulettes de minerais de fer lors de leur réduction

    By F. Ajersch, M. Rigaud, M. Jallouli

    "Le gonflement des boulettes d'hématite à été étudié à l'aide d'une méthode de mesure standard ISO ainsi qu'à l'aide d 'une méthode de mesure dilatométrique.La première m

    Jan 1, 1983

  • CIM
    Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite Concentrate

    By A. Drouin, D. Lemieux, C. Chouinard

    "A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t

    Jan 1, 2017

  • CIM
    Geology and Chemistry of the Low Ti Magnetite-bearing Heff Cu-Au Skarn and its Associated Plutonic Rocks, Heffley Lake, South-Central British Columbia

    By I. C. L. Webster, G. E. Ray

    "The magnetite-rich Heff Cu-Au skarn lies in the Quesnel Terrane of south-central British Columbia, approximately 26 km northeast of Kamloops. The skarn formed close to the northern margin of the Heff

    Jan 1, 2007

  • CIM
    Startup of New Facilities to Planned Performance Levels

    By A. Rajan

    "Drawing upon the experiences of a gold extraction plant startup in the Southern Pacific, this paper will describe the importance of the commissioning phases to the project outcomes to achieve early t

    Jan 1, 2000

  • CIM
    The Oxygen Demand of Flotation Pulps

    By F. Rosenblum, P. Spira

    "Techniques were developed to determine the oxygen demand of sulphide ore pulps in the laboratory and in concentrators. The effect of variables which influence oxygen demand was studied, and it is sho

    Jan 1, 1974

  • CIM
    La Fabrication de fer Préréduit Pour Utilisation au Four à Arc Électrique

    By A. H. Marquis

    Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t

    Jan 1, 1979

  • CIM
    Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment

    The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca

    May 1, 2009

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    Horses for Courses – Tailoring Front End Design to Project Requirements

    By Paul Staples, Paul Messenger, Greg Lane

    "Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic

    Jan 1, 2008

  • CIM
    Mining Operations and Slurry Pipelines Update and Future

    By R. A. Hill, J. D. Pitts

    "Long distance slurry pipeline systems have been successfully trans-porting steam coal, iron concentrates, copper concentrates and limestone for an aggregate of nearly 60 years and nearly three billio

    Jan 1, 1978

  • CIM
    A New Method for the Stabilization of Arsenic from Enargite Concentrates

    By R. Barbaroux, B. Dubreuil, D. Lemieux, K. Nasrallah, G. Garcia Curiel

    "As conventional, base or precious metal ores are being depleted worldwide, the mining industry is being faced with an increasing exploitation of arsenical sulfidic ores. Enargite is a common example.

    Jan 1, 2017

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003