Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cost-Effective Dry Screening, Dewatering and Water Treatment

    By R Norris, M Dunne

    Mining and mineral processing is expected by society and obliged by law to operate in an environmentally friendly fashion, minimising the impact on and avoiding damage to the environment. Substantial

    Jan 1, 2006

  • AUSIMM
    Five years of cover performance monitoring and modelling for a store and release cover at Century Mine

    By T Rohde, P Defferrard

    In 2010 a store and release cover (the cover) was constructed on the south waste rock dump (SWRD) at Century mine. This also included aerial seeding of province native trees and shrub seeds. The purpo

    Jul 23, 2018

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Tailings Dewatering, Dry Screening and Water Clarification for Reduced Water Usage

    By R Norris, M Dunne

    Substantial efforts by the industry, as well as by process and equipment designers, have resulted in many innovative developments that provide cost effective reductions in water usage. This paper show

    Jan 1, 2006

  • AUSIMM
    Methods for Evaluating Explosion Resistant Ventilation Structures

    By E S. Weiss, S P. Harteis

    The Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) has conducted full-scale explosion experiments, to evaluate the strength characteristics o

    Jan 1, 2005

  • AUSIMM
    The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case study

    By D A. Williams, P J. Chapman

    The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus

    Jul 23, 2018

  • AUSIMM
    Modelling of height of connective fractures during longwall mining

    By D Adhikary, M Khanal, B Poulsen, H Guo

    During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer

    Nov 30, 2018

  • AUSIMM
    Ventilation contaminant characterisation for a greenfield project

    By A Hatt

    This paper presents a case study of characterisation work undertaken at a greenfield exploration project to provide engineering and OH&S inputs for the design of a ventilation system. The paper discus

    Oct 12, 2022

  • AUSIMM
    AEROPHINE® 3418A Promoter as a Secondary Collector to Boost Nickel Recovery at Forrestania Nickel Operations

    By C Munro, S Emery, M Flynn, K Tan

    "AEROPHINE® 3418A Promoter is a well-known and widely used collector and is an industry standard for its excellent selectivity and efficacy in the processing of complex polymetallic sulfide ores,

    Oct 10, 2016

  • AUSIMM
    Copper Converter Slag Treatment at Mount Isa Mines Limited, Mount Isa, Qld

    By Hare S. M, Lumsdaine I, O&apos

    Converter slag assaying 3.7 per cent Cu is produced by Mount Isa copper smelter at a rate of up to 180 000 tonnes per annum.Priority is given to the processing of ore, however concentrator capacity pe

    Jan 1, 1993

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Risk Assessment Models for Post-Mining Land Use

    By C Smith, R I. Maczkowiack, P D. Erskine

    Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr

    Jul 10, 2012

  • AUSIMM
    Making Studies Work – Organisation, Communication and Management

    By P McCarthy

    "This paper is based on 30 years of involvement in feasibility studies as a participant, study manager and the leader of a firm that provides study components and overall study management. The followi

    Mar 8, 2016

  • AUSIMM
    Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination Methods

    By S C. Dominy

    Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat

    Sep 5, 2011

  • AUSIMM
    Past Achievements and Future Challenges in the Underground Coal Sector

    By B Robertson

    Over the 40 years that the author has been engaged in the Australian underground coal mining industry, there has been a continuous improvement in safety performance as the sector has grown in size and

    Jul 1, 2013

  • AUSIMM
    Application of RISKGATE to Coal Mine Tailings Dams

    By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe

    RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan

    Jul 16, 2014

  • AUSIMM
    Sustainable Steel Plant on an Environmental Protection Area

    By C A. Chaves

    During most of its history, the metallurgical industry has been seen as a source of pollution for the environment. However, during the second half of the 20th century, as the world environmental legis

    Jan 1, 2009

  • AUSIMM
    Optimising Leach Pad Construction Methods for Site Specific Applications

    By Thompson P, Sharma Y

    The paper describes the methodology and results from a study carried out by Telfer Gold Mine to optimise the materials and costs involved in construction of the pad for their dump leach operations.

    Jan 1, 1994

  • AUSIMM
    An investigation of gyratory crusher liner wear at the Telfer Operation using non-operational streamlined modelling

    By J Harding, S Munro, R A. Bearman

    Despite the importance of the primary crushing stage, performance optimisation is not well analysed with sufficient focus to give improvement opportunities. At the Newcrest owned Telfer operation, lin

    Aug 24, 2022

  • AUSIMM
    The Evolution of Modern Canadian Shaft Sinking Technology

    This paper deals with the evolution of Canadian shaft sinking technology over the last 15 years. Most, if not all, shaft excavation projects in Canada prior to 1990 were sunk using traditional benchin

    Jan 1, 2002