Pressure Measurements in the Gob (27227c3c-951c-4108-ba5c-3b6e67d232fb)By H. Maleki
Gob pressure measurements were made in a Western U. S. coal mine as part of a long-term program to evaluate cave progress and to determine the influence of geological discontinuities on caving conditi
Jan 1, 1984
-
An Application Of Tree Classification Method In Analysis Of Longwall Shield StabilityBy Yong-Ming Jiang
Longwall mining systems are extremely complex and expensive and require great caution for reliable and efficient operation. In many cases, ground control problems are the primary concern in longwall m
Jan 1, 1993
-
Formation of Face Headings Using Stress Relief at Asfordby MineBy John Cassie
The condition of roadways in the Deep Main seam at Asfordby mine, operated by RJB Mining (UK) Ltd, is strongly dependant on drivage direction relative to the maximum horizontal stress. The mine is la
Jan 1, 1997
-
Methods To Determine Pillar Stress Distribution And Its Effect On StabilityBy David P. Conover
The effects of stress distribution on pillar stability were evaluated through rock mechanics studies conducted in three underground room-and-pillar coal mines. Results of the three field instrumentati
Jan 1, 1989
-
Effects of Panel Mining Sequence and Retreat Direction on the Roof Stability of Longwall Headgate EntriesBy Jinsheng Chen
The major functions of longwall headgate entries are to provide access ways to the outby submains or mains for coal transportation and to the longwall face for fresh air and for transporting men and m
Jan 1, 1998
-
Subsidence Monitoring Results, Thick Seam Longwall Mining In WyomingBy Collin L. Stewart
A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog
Jan 1, 1995
-
Further Improvements In The Roof Beam Tilt Method Of Gateroad Support DesignBy Peter Cain
Twenty years of research into the design of permanent gateroad support (packs) in coal mines have resulted in two methods of pack design based on engineering principles. The first, the detached block
Jan 1, 1993
-
Assessing Coal Bumps From Excess Energy in Finite Difference ModelsBy Ryan Garvey
A numerical investigation is made into unstable failures of coal pillars (i.e. coal bumps) using the finite difference software FLAC3D. A static energy balance is first derived to calculate the excess
Jan 1, 2013
-
The Role of Gas Pressure in Coal BurstsBy Winton Gale
"Rock and coal fractures and micro seismic vibration are common occurrences during development mining. It is very uncommon for coal and rock to be propelled into the roadway during normal mining opera
Jan 1, 2018
-
Analysis Of Longwell Shields And Their Interaction With Surrounding Strata In A Deep Coal MineBy Duk-Won Park
A vast majority of the operating longwall sections use shield-type face supports to provide ground control in the United States. As a co-operative research program between the University of Alabama (U
Jan 1, 1992
-
Comparison of Some Aspects of Bolting Mechanisms Between Fully-Grouted Resin and Tensioned Bolts in Underground Mine EntriesBy Asmaa Yassien
Finite element models were developed to study the effect of tensioned and fully-grouted bolts on the stability of the mine opening in a three-entry development system using a typical geological column
Jan 1, 2002
-
Determination Of Rock Strength Properties Using Geophysical And Ultrasonic Logging In Exploration Drill HolesBy John Feddock
This study deals with underground mines and ground control and the prediction of seats strength characteristics based upon ultrasonic logging. Exploration drill holes, both rotary and core holes are u
Jan 1, 2003
-
An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal BedBy George Mishra
In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco
Jan 1, 1981
-
Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock MineBy Chris Pritchard
Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun
Jan 1, 1999
-
Laboratory and In Situ Results of a Slip Nut Yielding Rock Bolt SystemBy John D. VandeKraats
Yielding rock bolt systems have been developed to provide ground support while accommodating shifting, creeping, or swelling ground movements. The Dywidag Systems, Inc. (DSI) Slip Nut System is one su
Jan 1, 1998
-
Extraction Ratio In Thin Seams Assuring No Surface SubsidenceBy Kot F. v. Unrug
The depletion of thicker coal reserves has resulted in the thinner seams being economically attractive. Surface protection against subsidence limits the extraction ratio to 50% for the room and pillar
Jan 1, 2001
-
The Initial Performance of Commonly Used Primary Support on U.S. Coal MinesBy Murali Gadde
U.S. coal mines? primary roof supports typically consist of passive resin bolts; however, the use of active bolt systems is increasing. Despite this widespread use, a comparative performance evaluatio
Jan 1, 2011
-
Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NMBy P. E. Christensen
Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f
Jan 1, 1998
-
The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)By Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
Development of A Yielding Steel PostBy John P. Dunford
Ground support continues to be the most important safety consideration in underground mining. The Bureau of Mines has developed a yielding steel post with a capacity of 45 tons and b c1osure allowance
Jan 1, 1986