Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the Technology

    By Victor Nazimko

    A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d

    Jan 1, 2008

  • SME-ICGCM
    Improvements in Coal-Waste Disposal Since Buffalo Creek

    By Kelvin K. Wu

    A coal waste disposal dam failed on Buffalo Creek near Saunders, West Virginia, on February 26, 1972. This accident resulted in the loss of 125 lives, left over 4000 people homeless, and resulted in m

    Jan 1, 2006

  • SME-ICGCM
    Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)

    By B. Arjang

    ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri

    Jan 1, 1989

  • SME-ICGCM
    Practical Aspects Of Mobile Roof Support Usage

    By F. E. Chase

    Mobile roof supports are shield-type support units mounted on crawler tracks. Mobile roof support (MRS) units are used during retreat mining, and they eliminate the setting of roadway, turn, and cross

    Jan 1, 1996

  • SME-ICGCM
    Experimental Study Of Line Electrode Method To Detect Underground Cavities

    By F. Ziaie

    Line electrical resistivity method using physically infinite distance between current line electrodes is proposed to determine the location of mine workings. In this method at least three line electro

    Jan 1, 1989

  • SME-ICGCM
    Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)

    By Mike Amick

    As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti

    Jan 1, 2009

  • SME-ICGCM
    Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study

    By Mark K. Larson

    Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th

    Jan 1, 2012

  • SME-ICGCM
    Detailed Stress Analysis of Longwall Panels

    By Khaled Morsy

    In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh

    Jan 1, 2006

  • SME-ICGCM
    Determination Of Horizontal Stress Direction By Underground Mine Mapping (2f4eaf66-10ce-4f4d-9f7a-64c6c21e6400)

    By S. E. Phillipson

    Underground mine mapping is a critical component of understanding the controls on ground instability. Many relatively localized examples of ground failure are associated with geologic features, such

    Jan 1, 2009

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996

  • SME-ICGCM
    Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts

    By Damon P. Vandermaat

    Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa

    Jan 1, 2012

  • SME-ICGCM
    An Applications Approach To Barrier Pillar Design For Improved Resource Recovery

    By John R. Koehler

    Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu

    Jan 1, 1989

  • SME-ICGCM
    Longwall Mining in Illinois: A Controversy over Planned Subsidence of Flat Farmland

    By Daniel Barkley

    Underground coal mining in Illinois has a lengthy history dating back to the early 1800?s. High extraction underground mining has played a significant role in production through out this time. Mode

    Jan 1, 2007

  • SME-ICGCM
    Development of a mechanistic model for prediction of maximum subsidence and subsidence profile due to longwall mining

    By Richard D. Begley

    This paper summarizes the development of a mechanistic model to predict longwall mining induced surface subsidence. The model was originally developed from data acquired from a recent field study cond

    Jan 1, 1989

  • SME-ICGCM
    Changes In The Seismic Properties Of The Cover Produced By Longwall Mining

    By Guoqi He

    Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within

    Jan 1, 1989

  • SME-ICGCM
    Cementitious Seal/Rock Interface Under Hydrostatic And Dynamic Loadings (28th International Conference on Ground Control in Mining)

    By Khaled Morsy

    Cementitious seals are made of foamed cements with strength ranging from 100 to 600 psi. These cementitious seals are usually used at locations where the seal will be subjected to some convergence, as

    Jan 1, 2009

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007

  • SME-ICGCM
    Advanced Prediction Methods for Roadway Behaviour by Combining Numerical Simulation, Physical Modelling and In-Situ Monitoring

    By Andreas Hucke

    For the roadway design in the German hard coal mining industry, an advanced combined planning system has been applied during the past 20 years. The German mining industry is working with single entry

    Jan 1, 2006

  • SME-ICGCM
    The Influence Of Massive Sandstones In The Main Roof On Longwall Support Loading

    By A. M. Richardson

    The significance of a massive sandstone unit in the immediate roof to longwall support weighting is well known. If the unit lies in the main roof above the zone of caving, its influence becomes more d

    Jan 1, 1996

  • SME-ICGCM
    Development in Steel Roadway Support - A Track Record

    By Rudi Podjadtke

    In a short chronological review the development concepts and improvements in steel roadway support are shown. The successful standardization concept of RAG Deutsche Steinkohle and currently used suppo

    Jan 1, 2008