Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Head Grade Effects on Gold RecoveryThe occlusion of unliberated gold particles in silicates and sulfides in crushed/milled ore dictates the recovery that can be expected. The grade of this occluded gold in cyanide leach residues shows
Jan 1, 2008
-
Continuous Surface Mining Equipment: How to Achieve SuccessBy Edward DeLilla
For the past 30 years, surface mines have moved toward more highly mechanized, automatic systems that continuously mine overburden and ore to increase productivity, lower operating costs and minimize
Jan 1, 1994
-
Revamp And Modernization Of Gearless Mill DrivesBy M. Ahrens
Gearless mill drives (GMD) are a well established solution for grinding applications in the minerals and mining industries. The paper describes the functionality and technical features of such drive s
Jan 1, 2008
-
Dissolution Behavior Of Silver/Silver Oxides In Ammoniacal SolutionsBy K. N. Han, N. S. Kim, H. Yoon, J. S. Sohn
The leaching behavior of silver and silver oxides in ammonical solutions has been studied. The current study is concerned with an effective recovery of silver from secondary sources such as spent silv
Jan 1, 2002
-
Use Of Available And Emerging Methods For Location Of Air And Water Filled Cavities In Mines – Status Report On MSHA Demonstration ProjectsBy Kelvin K. Wu, George H. Gardner
On July 24, 2002, a nonfatal entrapment accident occurred at the Quecreek #1 Mine, Black Wolf Coal Company, when an active mining section inadvertently cut into a flooded abandoned mine. This inciden
Jan 1, 2005
-
Environmental Evaluation Of The Belle Eldridge Mine Near Deadwood, South DakotaBy A. D. Davis, C. J. Webb, C. S. Johnson
The Belle Eldridge Mine is an inactive lead-zinc mine in Spruce Gulch south of Deadwood, South Dakota. Acidic mine drainage (AMD) produced at the site drains into Spruce Creek, a tributary of Whitewo
Jan 1, 2000
-
Implementation Of Corporate Biodiversity Management ProgramBy M. Hamarat
Freeport-McMoRan Copper & Gold (FCX) is committed to preserving and enhancing biodiversity in the areas in which we operate. As a member of the ICMM, FCX is committed to implement the 10 Sustainable D
Jan 1, 2011
-
Surface Tension Of Flotation Solution And Its Influence On The Selectivity Of The Separation Between Apatite And Gangue MineralsBy M. Martins
This work presents and discusses the influence of the surface tension (gLV) of methanol/water mixtures on the flotation response of apatite versus gangue minerals conditioned with flotation reagents (
Jan 1, 2009
-
A Method To Calculate Hydrodynamic Loads On Underground BulkheadsBy G. Watson, S. Sawyer
A Method to Calculate Hydrodynamic Loads on Underground Bulkheads Bulkheads are structures built in openings in underground mines to impound water, preventing the water from entering the active mine
Jan 1, 2007
-
Rock Tunnels Recently Completed In ChicagoBy Joseph Irons, David Westfall
Three rock tunnel sewer systems are underway in the Chicago Area. (Figure 1) The three are designed to act independently and to be later connected to the future tunnels of the master plan. The tunnel
Jan 1, 1997
-
TBM And NATM Combined Solution For A Very Deep Tunnel?The ?Pajares? CaseBy Enrique Fernández
INTRODUCTION The high speed rail link between Madrid and Asturias, in the North of Spain, has encountered in the Cantabrian range the biggest challenge of the whole line, a very deep tunnel, 25 km l
-
Design Of NATM Tunnels And Stations Of Silver Line Phase III Project In BostonBy Verya Nasri
The Silver Line Phase III Project is the final one mile underground segment of the new Bus Rapid Transit in downtown Boston. The project is expected to significantly reduce existing and anticipated tr
-
A design tool for improving the safety of highwall mining operations - SME Transactions 2015By Y. Luo
Highwall mining, which is a relatively new mining method, is a preferred and often the only feasible method for extracting coal reserve left by surface mining operations in areas with steep terrain an
Jan 1, 2015
-
Thermogravimetric Study Of Carbon Dioxide Adsorption On Alumina-Supported Calcium OxideBy T. Yegulalp, R. Farrauto, A. Belova, M. Castaldi
Calcium oxide, with its ability to capture and store carbon dioxide, is emerging to become an important tool in carbon management. Calcium oxide can be used reversibly to capture carbon dioxide in si
Jan 1, 2007
-
Selection Of The Vertical Alignment Of Rapid Transit TunnelsBy Charles W. Daugherty, James P. Gould, Kenneth R. Ware
INTRODUCTION As illustrated in Figure 1, the Washington Metropolitan Area Transit Authority's (WMATA) rapid transit system (METRO) ultimately will comprise 100 miles of line divided among 10 r
Jan 1, 1976
-
Use of Seismic Tomography in Mining – Preprint 97-42By D. K. Denton, M. J. Friedel, D. F. Scott, T. J. Williams
Spokane Research Center personnel have been investigating the use of seismic tomography to monitor the behavior of a rock mass, detect hazardous ground conditions, and assess the mechanical integrity
Feb 24, 1997
-
Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy
This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660
Feb 24, 1997
-
China Featured at the Minnesota ConferenceBy William R. Yernberg
The combined 79th Annual Minnesota Section of SME Meeting and 67th Annual University of Minnesota Mining Symposium was held April 11 and 12, 2006, in Duluth, MN. About 300 mining professionals attend
Jan 1, 2006
-
Simulators Improve Mine Operator Training and SafetySimulator technology has advanced to the point where the cost of mining equipment simulators is beginning to make commercial sense. Simulator-based evaluation allows operators or potential employees t
Jan 1, 2003
-
Study On Performance-Based Design For Mine Fire Safety SystemAs opposed to a prescriptive-based design, a performance-based fire-protection system design allows the system planner the flexibility in choosing specific method, materials and design tools to achiev
Jan 1, 2011