Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Local Use And Design Of Augered, Cast-In-Place Piles In The Southern Piedmont Province ? IntroductionBy Geoffrey C. Hebner
Augered, cast-in-place piles (ACIP) have become a very common foundation type in Atlanta and the Southern Piedmont Province as well as much of the United States in the past 20 years. Prior to the intr
Jan 1, 2003
-
Settlement Behaviour Of Pile Foundation ? SynopsisBy W. Y. Xu
In comparison with shallow foundation, usually higher bearing capacity, smaller average settlement and better stability are the engineering characteristics of pile foundation. Besides, a smaller diffe
Jan 1, 2010
-
Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive SoilsBy Mohammed Sakr
This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.
Jan 1, 2012
-
Analysis of Plugging Effect for Open-Ended Piles in Sandy SoilBy Sangseom Jeong, Moonkyung Chung, Junyoung Ko
"Abstract The plugging effect of open-ended piles in sandy soil is analyzed by full-scale field test and plugging measurement. PLR (plug length ratio) measurement data from 144 field cases are analyze
Jan 1, 2014
-
Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil ConditionsBy Seffen Leppla, Rolf Katzenbach, Matthias Seip
"Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig
Jan 1, 2014
-
Once Again, Engineering And Contractor Tenacity Overcome Tough GeologyBy John E. Lens
How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran
Jan 1, 2006
-
Slurry Walls In Building Construction - Urban ConditionsBy Louis Donolo
New buildings in today's urban environment, especially in down-town areas, invariably involve the construction of multiple level basements. Used for parking, storage and commercial space, these u
Jan 1, 1987
-
Treated Round Wood Piling SpecificationsBy James S. Graham
Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a
Jan 1, 1992
-
On The Effects Of Sand Grading On Driven Pile PerformancePrecast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i
Jan 1, 1989
-
Construction Productivity Advancement Research Program (CPAR)By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Seismic Considerations for Bridge FoundationsBy Lok M. Sharma
"Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou
Jan 1, 2017
-
A Brand New Barrier Wall Installed at Wolf Creek DamBy Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014
-
Low Strain Integrity Testing Of Deep Foundations ? IntroductionBy Jay A. Berger
Nondestructive testing of deep foundations for integrity problems made great strides in the late 1980's. Inexpensive portable computers have allowed the immediate and rapid processing of field me
Jan 1, 1990
-
Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DCBy Joseph C. Gillen
This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d
Jan 1, 2006
-
Evaluation For Stone-Column Composite Foundation In Rayleigh Wave MethodBy Zhang Baoshan
In this paper, the forced features and dynamic behaviors of stone-column composite foundation are concisely related. The characteristics of Rayleigh wave method is summarised. This method is proposed
Jan 1, 1991
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? IntroductionBy Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering TechniquesBy Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
The Synergy Between Theory And Practice In Geo-EngineeringBy Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Biodegradable Hydraulic Fluid in the Deep Foundation Industry - SynopsisBy S. H. Miller
Biodegradable hydraulic fluids can save tens or hundreds of thousands of dollars in fines and clean up costs in the event of a hydraulic fluid leak or spill. When properly selected, applied, maintaine
Jan 1, 2000
-
Experiences With A New Type Of Displacement Screw Pile - SynopsisBy William Van Impe
A most renewing and promissing soil displacement screw pile is called the O-pile. The O-screw pile is a soil displacement auger pile based on a screwing in - screwing out procedure. The displacement a
Jan 1, 1996