Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Using Thermal Integrity Profiling to Evaluate the Structural Integrity of Soil NailsBy Inc. Pile Dynamics, Daniel S. Belardo, Marcus Galvan, George Piscsalko
Soil nails are often utilized as a temporary or permanent earth retention technique for slope stabilization and for excavation retention for existing or new structures. Soils nails are generally advan
Jan 1, 2017
-
Foundation Reuse: Overcoming ResistanceBy Sara Anderson, Rachel Nicholls, Tim Chapman, Janice Windle
"In city center sites around the world, and in particular in London, foundation reuse is becoming increasingly widespread as the ground is filled with detritus from previous developments. This paper s
Jan 1, 2005
-
I Don't Have X-ray Vision: Risk-Informed Site InvestigationBy Georgette Hlepas
How often phrases like these have been made by project managers and project teams trying to explain why there has been cost growth, project delays and differing site conditions claims. But does it re
May 1, 2022
-
Digitalization in Reverse Circulation Drill RigsBy N. Schmitz
This paper explains how new digital solutions improve reverse circulation drilling operations. Upgrading field-proven reverse circulation drilling (RCD) rigs with new digital technologies enables sem
Sep 8, 2021
-
Case History – San Francisco 49ers NFL Stadium Pile Foundations Santa Clara, CaliforniaBy Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The stadium development consists of construction of a 68,500-seat, open-air NFL football stadium for the San Francisco 49ers. The main structure will consist of a 7-story above grade steel structure
Jan 1, 2015
-
A Novel Method For Assessing The Reuse Of Under Reamed Piles As Part Of The Southbank Place ProjectBy Stuart Hardy, Xiangbo Qiu
The South Bank Place project comprised the redevelopment of the iconic Shell Corporation headquarters in Waterloo, located on the Southbank of the River Thames in central London. The site was original
May 1, 2022
-
ACIP Pile Performance and Installation in the Northeastern United StatesBy Jr NeSmith
"Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile
Jan 1, 2016
-
Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of AntwerpBy Stefan Mewes
Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa
Sep 1, 2022
-
Remedial Method for Collapse Soil Foundation of Mosul DamBy Arash Khosravifar, Ali N. Ibrahim
"Large areas of Iraq are covered with collapsible soils namely gypsiferous soil which is often used as the foundation soil for structures. In particular, the Mosul Dam foundation is comprised of high
Jan 1, 2017
-
Hudson’s Revitalization: The Use of Robotics in the Work PlaceBy Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019
-
The Berkeley Art Museum: Using Deep Foundations to Repurpose a Historical BuildingBy Timothy Nelson, Simon Burnworth
"The University of California’s new Berkeley Art Museum and Pacific Film Archive will showcase a collection of art and film in a facility that pairs an existing 1930s-era printing press facility with
Jan 1, 2017
-
Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled ShaftsBy Alexandre Alex) J. Bredikhin
"DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel
Jan 1, 2017
-
Diaphragm Wall Technique Used In A Different Way Cutting Trenches Up To 823 Ft. (251 M) For An Exploration And Bulk Sampling ProgramBy Stefan Schwank, Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to install diaphragm walls, which are known as underground structural elements commonly used for retention systems and permanent foundation elements as well as
-
The Need For Air Control In Down The Hole Hammer Casing Advancement DrillingBy Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Case History: Innovative Load Test Program Optimizes Pile Capacity in Challenging Ground ConditionsBy Emad Farouz, Francis A. Abreu
"This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Pla
Jan 1, 2017
-
Nearshore Pile Construction Experience In Burnie, TasmaniaBy Thomas W. Scott, Manh N. Tran
Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur
Nov 1, 2022
-
The Effc/Dfi Guide To Support Fluids For Deep FoundationsBy Chris Harnan, Christophe Justino
The European Federation of Foundation Contractors (EFFC) and the Deep Foundations Institute (DFI) jointly published Edition 1 of the ‘EFFC/DFI Guide to Support Fluids for Deep Foundations’ in April 20
May 1, 2022
-
Full Waveform Inversion of Cross-Hole Stress Waves for Structural Integrity Testing of Drilled ShaftsBy Joseph T. Coe, Alireza Kordjazi, Michael Afanasiev
Cross-hole sonic logging (CSL) is a common quality assurance measure for the evaluation of the structural integrity of drilled shafts. The results of CSL can be supplemented by a set of tomographic im
Jan 1, 2019
-
Vancouver Island Conference Centre Cutter Soil Mixer Technology Transforms SiteBy Brian Wilson, John Scholte, Megan Atkinson
"In November 2004, the residents of the City of Nanaimo, B.C., Canada voted to approve a new conference centre as the centrepiece of a proposed revitalization project for the city’s historic downtown
Jan 1, 2008
-
Wrigley Field – The 1060 ProjectBy Darren S. Diehm
"Construction for the restoration and expansion of 102-year-old Wrigley Field in Chicago, Illinois began at the conclusion of the 2014 baseball season. This six year project involves structural upgrad
Jan 1, 1900