Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    BIM For Facility Management: Design for Maintainability with BIM Tools

    By R. Liu

    As Building Information Modeling (BIM) becomes widely adopted by the construction industry, it holds undeveloped possibilities for supporting Facility Management (FM). Some FM information systems on t

    Aug 1, 2013

  • CIM
    The Extended Mathews Stability Graph: Quantifying case history requirements and site?specific effects

    By Penny C. Stewart

    Narrow vein underground stope design engineers in Australia have expressed significant interest in the requirements and methodology for developing site-specific stability charts. This is largely due t

    Oct 1, 2001

  • CIM
    Simulation and Formability of Automotive Aluminum Alloy Sheet and Tube

    By J. T. Chen, S. Winkler, M. J. Worswick, O. Orlov

    This paper presents a review of research conducted at the University of Waterloo concerned with the application of aluminum alloy sheet and tube in automotive structures and body panels. The research

    Jan 1, 2006

  • CIM
    System drivers in the performance of auxiliary ventilation systems

    By I. R. Muirhead, S. Frimpong

    "The mechanization of mining operations in underground coal mines has led to faster cutting rates of coalfaces with increased levels of emission of gaseous and particulate contaminants in the workings

    Jan 1, 2003

  • CIM
    The Intec Zinc Process

    By J. Moyes

    The Intec Process is a generic process for the production of pure base metals and precious metals from sulphides concentrates derived from copper, nickel, zinc and lead ores. The development program f

    May 1, 2002

  • CIM
    Structure of the Ferderber gold deposit, Belmoral Mines Ltd., Val d'Or, Quebec

    By L. Vu, V. Popov, J. Beland, R. Darling

    "The Ferderber gold deposit is of Archean age. It consists of a series of gold-bearing quartz lenses within a shear zone that crosscuts the central part of the quartz dioritic Bourlamaque batholith. O

    Jan 1, 1987

  • CIM
    Observations on the Impact of Furnace Dimensions and Power Density on Taphole Integrity

    By R. J. Hundermark, K. van der Merwe, L. R. Nelson

    Taphole integrity is critical to all furnaces, but it is especially important in high intensity electric furnaces processing matte and metal of high superheat. Key furnace dimensions are the electrod

    Jan 1, 2015

  • CIM
    Achieving business results through IT: Insuring controller performance benefits with web-enabled monitoring at Noranda

    By L. Lariviere, M. Grenier, R. Khalili, D. Shook

    A mineral processing facility near Montreal, CEZinc, Noranda Inc., has recently implemented a leading-edge intranet solution for monitoring the performance of plant operations, and providing condition

    Jan 1, 2003

  • CIM
    Forum on "Ball Mills Using Steel Vs. Pebble Mills

    By J. M. Hemstock, H. L. Ames

    THESE forums have been held annually since they were introduced by Mr. L. E. Djingheuzian in 1957. The response of millmen to questionnaires such as the one this year is ample evidence of the interest

    Jan 1, 1961

  • CIM
    Self-Cleaning Fluidized Bed Slurry Heat Exchangers: Processing of Laterite Ore Slurries for the Extraction of Nickel and Cobalt in High-pressure-Acid-Leach (HPAL) Plants

    By D. G. Klaren, E. F. de Boer

    Self-cleaning fluidized bed heat exchangers have demonstrated unparalleled performance internationally for the implementation of indirect heat transfer in severely fouling fluid environments. The inge

    Jan 1, 2004

  • CIM
    Mechanical Maintenance in Trackless Sub-Level Caving at Craigmont Mines Limited

    By A. K. Croteau

    "At Craigmont Mines Limited, Merritt, B.C., the mining practice of trackless sub-level caving was started in the latter part of 1966. This type of mining was new to the mine personnel and the mining i

    Jan 1, 1970

  • CIM
    A Reservoir Study of the Pincher Creek Field

    By F. D. Aaring

    "IntroductionTHE PINCHER CREEK gas condensate field, in Township 3, Range 28, and Townships 3 and 4, Range 29, West of the Fourth Meridian, was discovered in 1947 by the Canadian Gulf Oil Company with

    Jan 1, 1952

  • CIM
    Dates in technical reports

    By Deborah A. McCombe

    "There are a number of important dates that must be disclosed when a Qualified Person (QP) is preparing a technical report for securities purposes. The dates are discussed in NI43-101 and the Form of

    Jan 1, 2003

  • CIM
    Milling and Metallurgy at the Moneta Porcupine Mine

    By J. P. Dick

    THIS paper is a description of the milling practice and metallurgy at the Moneta Porcupine mine, Timmins, Ontario. The results obtained with an all-cyanide circuit and later with flotation followed by

    Jan 1, 1941

  • CIM
    Isasmelt™ - Smelting more with Less

    By Biplop Das, E. Herrera, A. Burrows, P. J. Mackey, G. R. F. Alvear Flores

    Since the first commercial plant was built at Mount Isa, another twenty ISASMELT™ furnaces have come into commercial operation, and construction of new plants continues. The primary copper ISASMELT™ t

    Jan 1, 2015

  • CIM
    Operation Optimization and Capacity Expansion in Jinlong Copper Flash Smelter

    By Z. Jun, L. Kerning

    Jinlong copper smelter and refinery, originally designed for 100,000tpa primary copper and started up in 1997, has been expanding its capacity on the basis of operational optimization and by modifying

    Jan 1, 2007

  • CIM
    SAG Mill Testing - An Overview of the Test Procedures Available to Characterize Ore Grindability

    By F. O. Verret

    Several grindability tests were developed over the years to design grinding circuits or optimize existing operations. Each test has its own strengths and weaknesses and it is imperative to select the

    Jan 1, 2012

  • CIM
    Wastewater Treatment at Hudson Bay Mining and Smelting Company Limited, Flin Flon, Manitoba

    By R. V. Typliski, G. J. Labarre

    "Hudson Bay Mining and Smelting Co., Limited, Flin Flon, Manitoba, Canada, has developed a metallurgical wastewater treatment system employing two-stage lime neutralization, sludge recirculation and c

    Jan 1, 1980

  • CIM
    ntroduction of the Autoloader at Mattagami Lake Mines

    By G Anders

    The mucking out of sub-level headings by slusher and by Autoloader is described, and the performance and costs of both methods are compared. The introduction of the Autoloader is taken as an example t

    Jan 1, 1965

  • CIM
    Towards Sustainable Mining: Crisis Communications and External Outreach Indicators: Measuring Performance and Setting Targets

    The Beginning ! The status quo simply isn?t sustainable ! Our social license is at risk ! The bar keeps rising ? We must improve our performance, both operational and social ? We must improve st

    May 1, 2004